Date/Time | Comments | Doc | Recording |
---|
6-4-19, 9 pm Eastern | Reviewed and addressed comments - Created epics for different project groups
| O-RAN SC Ver A SW Requirements 20190604a.docx |
|
7-30-19, 9 pm | Reviewed epics - INT-A-F212 clarification added in annex for PNF registration
- RICNRT-A-F10 for OSC Rel A ?
- INF-A-F01 epic clarification needed from Paul Carver
- INT-A-F013 - recruit Eliza Celenti to stand up OTF framework for Rel A
- RICAPP-A-F110 - UE Monitor for slicing
- Jun Hyuk Song to provide clarification of this epic, UE-NIB, overlap with UE Manager xApp
| O-RAN SC Ver A SW Requirements 20190730a.docx |
|
8-1-19, 9 am | Reviewed Epics Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc? Move Release planning cadence to once a week. Alternate between evening and day every other week. Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray - Tlab (AT&T)
- OTIC (O-RAN Test and Integration Centre - Asia/Europe/North America (inter-connected)
- Windriver lab ?
- CMCC ?
|
|
|
9/26/19, 9am | OSC and WG review meeting 1 View file |
---|
name | DOC status report update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Infra Status Update.mh (002).pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Integration Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Near-RT RIC Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Near-RT RIC xApps Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Non-RT RIC Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | OAM Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | ODUHIGH Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | ODULOW Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | OSC_WG_review.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | SIM-Status-Update.pptx |
---|
height | 250 |
---|
|
|
| WG review meeting 1 recording |
1/7/2020, 9pm | Recording: https://zoom.us/rec/share/_OxuJb3Z8mdOSa_xwR_UQoIzMrTmaaa8h3Ie_KUMzRvkdqfAxahEtx8_Z-VE0OmU?startTime=1578448750000 Bronze release documents Epics spreadsheet: RSAC_Bronze_release_planning.xlsx Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx |
|
|
2/17/2020, 11pm EST | Discussed Bronze at a glance updates from each OSC project. Slides - View file |
---|
name | OSC_Bronze_2_17_20.pptx |
---|
height | 250 |
---|
|
Recording: https://zoom.com.cn/rec/share/y-5fF-rq-iBJYLfoyx6CS6gtMt_beaa82nQe_aFfzhmqSgBfY2bDWzQ6NNFNWim9
|
|
|
2/19/2020, 11pm EST | Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides - View file |
---|
name | VIAVI ORAN OSC High Level Overview 2020Feb01E Ex.pdf |
---|
height | 250 |
---|
|
Action: Discuss in OSC TOC meeting regarding Viavi |
|
|
3/3/2020, 9 am EST | Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH Recording: https://zoom.us/rec/share/3-Z5A7P6xD1LWY3A-WfueZU7F4Haeaa80XcZr_UJz4r4zGY2XeS31gnPK9QG9tA?startTime=1583287601000 O-CU View file |
---|
name | O-CU project progress 20200218.pptx |
---|
height | 250 |
---|
|
|
|
|
3/10/2020 9 pm EDT | Bronze rel. – PTL reports from ODU LOW, INT Recording: https://zoom.us/rec/share/4OFfdZDh-FJLeInJslP2Zq94RJy9eaa803UdqfVYyS1yYKZBLNg2trHEvI1-dNQ?startTime=1583888670000 |
|
|
3/26/2020 9 am EDT | Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E Viavi's short term and long term proposal for OSC View file |
---|
name | VIAVI ORAN OSC Proposed Test Setups 2020Mar C Ex.pdf |
---|
height | 250 |
---|
|
|
|
|
4/9/2020 9 am EDT | Meeting Recording: https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_ ENGWEI KOO to setup meeting with Rittwik Jana Ron Shacham to discuss Viavi simulation parameters for traffic steering Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement |
|
|
4/28/2020 9 PM EDT | Meeting Recording: rsac-20200428.mp4 |
|
|
5/12/2020 9 PM EDT | Topic: Cherry release planning Start Time : May 12, 2020 09:00 PM Meeting Recording: https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC RSAC requesting PTLs to start suggesting EPICS for Cherry
|
|
|
5/26 | INF project cherry epics |
|
|
6/18 | Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.) Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver Rittwik Jana Lusheng Ji to check on OSC lab status for L1 stack by 6/30 ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30 ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high
| View file |
---|
name | Copy of OSC_RSAC_IOT_Profiles_Jun.15_C_Rel_update.xlsx |
---|
height | 150 |
---|
|
Common IOT profile |
|
7/16/2020 9 AM EDT | - O-DU and O-RU stub testing (Bronze maint.) (Zhimin Yuan , Lusheng Ji ); Have access to the box, waiting for Windriver to complete SW install before their SW can be installed
- KPIMON xAPP integration with Near-RT RIC (Matti Hiltunen , Ron Shacham, ENGWEI KOO )
- Working with Samsung and Near-RT RIC, problem with Subscription Mgr
- E2SIM has Viavi Schema and has demonstrated flow, waiting on 10 minute playback file from Viavi.
- Viavi indicates file wont be available until 7/24. Could work and lower risk with shorter file, Viavi will look into that.
- Cherry SMO Proposal (Martin Skorupski , Tracy Van Brakle )
- Proposal presented
- Discussion on external SMO open source alignment (John Keeney )
- Discussed possibility of sub-project instead of new project (John Keeney )
- SMO LCM and Application Deploy Scenarios (Martin Skorupski )
|
|
|
7/28 9 PM EST | | O-DU High status (PPT attached) View file |
---|
name | ODU High Status_29Jul.pptx |
---|
height | 150 |
---|
|
|
|
8/18 9 PM EST | - Discussion regarding O-CU MVP requirements for OSC
- Implement HO for traffic steering, defer E1 interface for Cherry
- Ganesh Shenbagaraman to raise topic to TOC for 8/19
- Discussion regarding OSC and TIFG MVP requirements
Meeting Recording: https://zoom.us/rec/share/3NIlIoHd5nlIQoWX90_TX6A-T4XLaaa8gXca_qdbxElpW9nzSwAkkYnIq3rVWIHt Access Password: zYN&Hv3s | TIFG-OSC meeting slides View file |
---|
name | TIFG-2020.08.18-TIFG-I-Joint meeting with OSC RSAC on MVP Blueprints v1.0 Ex (002).pptx |
---|
height | 150 |
---|
|
|
|
9/1 9 PM EST | - Discussion about OSC lab setup and timelines for testing and integration
Week starting Sept 7 – Configure Intel servers and install OS (windriver, server 1) Sept 14 – O-DU Low software installation and unit testing with stub RU simulator (server 1) Sept 21 – O-DU High software installation and unit testing with stub CU simulator (server 1) Sept 21 – Viavi O-RU emulator, O-CU emulator, EPC installation on (Server 2) Sept 28 – O-CU software installation and unit testing (Server 2) Oct 5 – O-DU high and O-CU unit testing Oct 19 – UE attachment and HO test Oct 26 – UE attachment and HO test
The OSC lab server addresses are Server 1 Management IP 192.168.4.29 Interface 1 192.168.41.190
Server 2 Management IP 192.168.4.30 Interface1 192.168.41.191
|
|
|
9/15 9 PM EST | Intel servers configured in OSC lab for O-DU testing Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; Sphoorthi Dayanandto reach out to Rich for help Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source) Ron Shacham to provide simulated trace files to Alexandru Alex Stancu from from Viavi sim into SIM repo Rittwik Jana David Kinsey to draft preliminary plan for D release; Requesting All PTLs to start thinking about D release work epics and Cherry flow over items
Meeting Recording: https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb |
|
|