Date/Time | Comments | Doc | Recording |
---|
6-4-19, 9 pm Eastern | Reviewed and addressed comments - Created epics for different project groups
| O-RAN SC Ver A SW Requirements 20190604a.docx |
|
7-30-19, 9 pm | Reviewed epics - INT-A-F212 clarification added in annex for PNF registration
- RICNRT-A-F10 for OSC Rel A ?
- INF-A-F01 epic clarification needed from Paul Carver
- INT-A-F013 - recruit Eliza Celenti to stand up OTF framework for Rel A
- RICAPP-A-F110 - UE Monitor for slicing
- Jun Hyuk Song to provide clarification of this epic, UE-NIB, overlap with UE Manager xApp
| O-RAN SC Ver A SW Requirements 20190730a.docx |
|
8-1-19, 9 am | Reviewed Epics Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc? Move Release planning cadence to once a week. Alternate between evening and day every other week. Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray - Tlab (AT&T)
- OTIC (O-RAN Test and Integration Centre - Asia/Europe/North America (inter-connected)
- Windriver lab ?
- CMCC ?
|
|
|
9/26/19, 9am | OSC and WG review meeting 1 View file |
---|
name | DOC status report update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Infra Status Update.mh (002).pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Integration Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Near-RT RIC Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Near-RT RIC xApps Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | Non-RT RIC Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | OAM Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | ODUHIGH Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | ODULOW Status Update.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | OSC_WG_review.pptx |
---|
height | 250 |
---|
|
View file |
---|
name | SIM-Status-Update.pptx |
---|
height | 250 |
---|
|
|
| WG review meeting 1 recording |
1/7/2020, 9pm | Recording: https://zoom.us/rec/share/_OxuJb3Z8mdOSa_xwR_UQoIzMrTmaaa8h3Ie_KUMzRvkdqfAxahEtx8_Z-VE0OmU?startTime=1578448750000 Bronze release documents Epics spreadsheet: RSAC_Bronze_release_planning.xlsx Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx |
|
|
2/17/2020, 11pm EST | Discussed Bronze at a glance updates from each OSC project. Slides - View file |
---|
name | OSC_Bronze_2_17_20.pptx |
---|
height | 250 |
---|
|
Recording: https://zoom.com.cn/rec/share/y-5fF-rq-iBJYLfoyx6CS6gtMt_beaa82nQe_aFfzhmqSgBfY2bDWzQ6NNFNWim9
|
|
|
2/19/2020, 11pm EST | Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides - View file |
---|
name | VIAVI ORAN OSC High Level Overview 2020Feb01E Ex.pdf |
---|
height | 250 |
---|
|
Action: Discuss in OSC TOC meeting regarding Viavi |
|
|
3/3/2020, 9 am EST | Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH Recording: https://zoom.us/rec/share/3-Z5A7P6xD1LWY3A-WfueZU7F4Haeaa80XcZr_UJz4r4zGY2XeS31gnPK9QG9tA?startTime=1583287601000 O-CU View file |
---|
name | O-CU project progress 20200218.pptx |
---|
height | 250 |
---|
|
|
|
|
3/10/2020 9 pm EDT | Bronze rel. – PTL reports from ODU LOW, INT Recording: https://zoom.us/rec/share/4OFfdZDh-FJLeInJslP2Zq94RJy9eaa803UdqfVYyS1yYKZBLNg2trHEvI1-dNQ?startTime=1583888670000 |
|
|
3/26/2020 9 am EDT | Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E Viavi's short term and long term proposal for OSC View file |
---|
name | VIAVI ORAN OSC Proposed Test Setups 2020Mar C Ex.pdf |
---|
height | 250 |
---|
|
|
|
|
4/9/2020 9 am EDT | Meeting Recording: https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_ ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement |
|
|
4/28/2020 9 PM EDT | Meeting Recording: rsac-20200428.mp4 |
|
|
5/12/2020 9 PM EDT | Topic: Cherry release planning Start Time : May 12, 2020 09:00 PM Meeting Recording: https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC RSAC requesting PTLs to start suggesting EPICS for Cherry
|
|
|
5/26 | INF project cherry epics |
|
|
6/18 | Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.) Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver user-59b16 user-d3360 to check on OSC lab status for L1 stack by 6/30 ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30 ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high
| View file |
---|
name | Copy of OSC_RSAC_IOT_Profiles_Jun.15_C_Rel_update.xlsx |
---|
height | 150 |
---|
|
Common IOT profile |
|
7/16/2020 9 AM EDT | - O-DU and O-RU stub testing (Bronze maint.) (Zhimin Yuan , user-d3360 ); Have access to the box, waiting for Windriver to complete SW install before their SW can be installed
- KPIMON xAPP integration with Near-RT RIC (Matti Hiltunen , Ron Shacham, ENGWEI KOO )
- Working with Samsung and Near-RT RIC, problem with Subscription Mgr
- E2SIM has Viavi Schema and has demonstrated flow, waiting on 10 minute playback file from Viavi.
- Viavi indicates file wont be available until 7/24. Could work and lower risk with shorter file, Viavi will look into that.
- Cherry SMO Proposal (Martin Skorupski , Tracy Van Brakle )
- Proposal presented
- Discussion on external SMO open source alignment (John Keeney )
- Discussed possibility of sub-project instead of new project (John Keeney )
- SMO LCM and Application Deploy Scenarios (Martin Skorupski )
|
|
|
7/28 9 PM EST | | O-DU High status (PPT attached) View file |
---|
name | ODU High Status_29Jul.pptx |
---|
height | 150 |
---|
|
|
|
8/18 9 PM EST | - Discussion regarding O-CU MVP requirements for OSC
- Implement HO for traffic steering, defer E1 interface for Cherry
- Ganesh Shenbagaraman to raise topic to TOC for 8/19
- Discussion regarding OSC and TIFG MVP requirements
Meeting Recording: https://zoom.us/rec/share/3NIlIoHd5nlIQoWX90_TX6A-T4XLaaa8gXca_qdbxElpW9nzSwAkkYnIq3rVWIHt Access Password: zYN&Hv3s | TIFG-OSC meeting slides View file |
---|
name | TIFG-2020.08.18-TIFG-I-Joint meeting with OSC RSAC on MVP Blueprints v1.0 Ex (002).pptx |
---|
height | 150 |
---|
|
|
|
9/1 9 PM EST | - Discussion about OSC lab setup and timelines for testing and integration
Week starting Sept 7 – Configure Intel servers and install OS (windriver, server 1) Sept 14 – O-DU Low software installation and unit testing with stub RU simulator (server 1) Sept 21 – O-DU High software installation and unit testing with stub CU simulator (server 1) Sept 21 – Viavi O-RU emulator, O-CU emulator, EPC installation on (Server 2) Sept 28 – O-CU software installation and unit testing (Server 2) Oct 5 – O-DU high and O-CU unit testing Oct 19 – UE attachment and HO test Oct 26 – UE attachment and HO test
The OSC lab server addresses are Server 1 Management IP 192.168.4.29 Interface 1 192.168.41.190
Server 2 Management IP 192.168.4.30 Interface1 192.168.41.191
|
|
|
9/15 9 PM EST | Intel servers configured in OSC lab for O-DU testing Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source) Ron Shacham to provide simulated trace files to Alex Stancu from Viavi sim into SIM repo user-59b16 David Kinsey to draft preliminary plan for D release; Requesting All PTLs to start thinking about D release work epics and Cherry flow over items
Meeting Recording: https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb |
|
|
10/13 9 PM EST | Meeting Recording https://zoom.us/rec/share/H6b2727deGhaKnuwuNHs4MF7i3Zao3y-gqMeY_WCYRj6WLI8Q6MzZjhjMJXyKLuU.H8QvANEkzqHlJ6R6 (Access Passcode: h&k2htXH) Martin Skorupski to perform code review for O1 requested by user-165cf Zhimin Yuan user-165cf to set up debugging session for pairwise O-DU low O-DU high testing user-59b16 , Rich Wright to check if P3000 card in O-DU low server (192.168.50.190) is connected correctly in OSC lab
|
|
|
11/19 9 AM EST | |
|
|
1/14/21 9 AM EST | Meeting Recording https://zoom.us/rec/share/mKYOGkB3mgpvIo2Hx1eY5Oifyw9qV9NQd7NiEj-FxQKP0kUpWOc7yvMO_LLPhA_M.lmx2LCh7-QwDHAFi
Discussed RU failure and recovery use case (ppt attached) user-59b16 to create call flow for use case | View file |
---|
name | RU_failure_recovery_use_case.pptx |
---|
height | 250 |
---|
|
|
|
2/25/21 9 AM EST | Meeting recording https://zoom.us/rec/share/Fw56lJ-t3FnHqBqrc-fWVcNfTq4BvLClnNO69jV3FFVAxMN9mcgelDCaOR_LT5sR.69SVCt37YleQy-8N Discussed RU failure recover use case Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup user-165cfto check steps 12-23 in 3. ODU Startup – implementation task
|
|
|
3/1/21 9 PM EST | Meeting recording https://zoom.us/rec/share/B4mbnreNFgtNSndiu54gVkpx_C-89rO5ofRQ8hAbSjSx8jEOdAUrbaKVD1n2wJA3.Hdvyxfpw6i0lj6To user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation
|
|
|
3/11/21 9am EST | Meeting recording listed to the right. Went through Release "D" Control Loop: - Alignment of DMaaP Topics across projects
- Confirmed proposed YANG for O-DU is being analyzed by the O-DU team, should have an answer by next weeks call.
- Confirmed Config was sent to O-RU team, ODU Team needs to know how to initiate pairwise testing
- Reaching out to contributors for E2SIM modifications for Traffic Steering Use case
- David Kinseywill Reach out to OTF team for OTF E2SIM integration at the same time
- David Kinsey will work with user-59b16 to work with Taiwan University to see how best to use them for Integration Project. They likely will not have a FHG in their environment and therefore are missing O-DU functionality for Hybrid or Hierarchical support models to the O-RU.
- SMO discussion was deferred as Mahesh had another meeting commitment. Nothing major pending.
|
| View file |
---|
name | playback.m3u |
---|
height | 150 |
---|
|
|
4/8/2021 | Meeting recording to be listed to the right once it is available. Went through Release "D" Flow: - ODU-High still working a segmentation fault but have sent one message to O-DU low and should be enough to verify ODU-Low to O-RU
- Other Messages to follow working for UE Attach
- O-CU binary has been delivered to lab next step is to integrate with ODU-High and Core Simulator
- Once all these are done should be able to UE attach
- For ODU-High to SMO verified PNP VES will trigger netconf hello
- Simple Yang will be provided by Martin Skorupski which allows control of the link
- Please see
- wiki: Use case driven YANG modules for O-DU
Jira |
---|
server | ORAN Jira |
---|
serverId | 5ec52304-b77c-3ce7-af6a-112cb13e6008 |
---|
key | ODUHIGH-322 |
---|
|
- gerrtigerrit: https://gerrit.o-ran-sc.org/r/c/scp/oam/modeling/+/5870
- email: https://lists.o-ran-sc.org/g/toc/topic/api_modification_process/81994146?p=,,,20,0,0,0::recentpostdate%2Fsticky,,,20,2,0,81994146
- near-RT RIC will get the O-DU ID and send the change state to "ACTIVE".
- David Kinseytook an action to get an OTF/INT project representative for the RSAC.
|
|
|