Updated:  14th April 2021

JIRA: Epics Status below:

  • https://jira.o-ran-sc.org/browse/ODUHIGH-184 - Done
    • As an O-DU L2 developer, I want to implement single UE DL data path and bench-marking
  • https://jira.o-ran-sc.org/browse/ODUHIGH-185 - Done
    • As an O-DU L2 developer, I want to implement single UE UL data path and bench-marking
  • https://jira.o-ran-sc.org/browse/ODUHIGH-186 - WIP
    • As an O-DU L2 developer, I want to add support for 64QAM modulation scheme in DL
      • Basic code changes complete. Testing in progress for data path
  • https://jira.o-ran-sc.org/browse/ODUHIGH-187 - WIP
    • As an O-DU L2 developer, I want to add support for 16QAM modulation scheme in UL
      • Basic code changes complete. Testing to be done for data path
  • https://jira.o-ran-sc.org/browse/ODUHIGH-264 - WIP
    • As an O-DU L2 developer, I want to add support for Mu1
      • Code changes at DU APP completed.
      • Code changes and testing completed for SSB.
      • Brainstorming for SIB1 in progress
  • https://jira.o-ran-sc.org/browse/ODUHIGH-265 - WIP
    • As an O-DU L2 developer, I want to add support for 100 MHz Bandwidth
      • Code changes at DU APP completed.
      • Code changes and testing completed for SSB.
      • Resource allocation design for SIB1 in progress
  • https://jira.o-ran-sc.org/browse/ODUHIGH-266 - WIP
    • As an O-DU L2 developer, I want to add support for TDD mode
      • Code changes at DU APP completed.
      • Code changes and testing completed for SSB.
      • Resource allocation design for SIB1 in progress
  • https://jira.o-ran-sc.org/browse/ODUHIGH-299 - WIP
    • As an O-DU L2 developer, I want to develop O-DU High Layers to support Closed Loop Automation Use-case
      • Discussions on the O-DU PNF Registration and Activation process is ongoing
      • Yang modules to be supported by O-DU to ensure the end-to-end functionality of the use case "Closed loop" is in progress. Basic configuration is agreed to support CLA use case.
      • Internal call flow/message sequence between O-CU and O-DU for cell activation and deactivation is clarifed.
      • UE delete functionality under review
      • Cell delete functionality coding in progress
  • https://jira.o-ran-sc.org/browse/ODUHIGH-267 - WIP
    • As an O-DU L2 developer, I want to integrate O-DU High with O-DU Low in Radio Mode
      • SSB transmission successful
      • Debugging issue with Sib1 transmission
  • https://jira.o-ran-sc.org/browse/ODUHIGH-268 - WIP
    • As an O-DU L2 developer, I want to integrate O-DU High with O-CU
      • Using Radisys commercial CU as a test fixture
      • Awaiting server allocation
  • https://jira.o-ran-sc.org/browse/ODUHIGH-269 - TODO
    • As an O-DU L2 developer, I want to support End to End testing scenarios

Dependency/Blockers:

  • O1 configuration for day-1 shall need to be completed to start with CLA. However basic configuration e.g. cell state/operational state/admin state shall be supported initially.
  • Server allocation to mount Radisys CU as a test fixture. Bare metal server preferred. 
  • Unable to use valgrind with Intel libraries. Debugging issue with seg fault using Brute Force method.