...
Date/Time | Comments | Doc | Recording | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6-4-19, 9 pm Eastern | Reviewed and addressed comments
| O-RAN SC Ver A SW Requirements 20190604a.docx | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7-30-19, 9 pm | Reviewed epics
| O-RAN SC Ver A SW Requirements 20190730a.docx | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8-1-19, 9 am | Reviewed Epics Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc? Move Release planning cadence to once a week. Alternate between evening and day every other week. Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9/26/19, 9am | OSC and WG review meeting 1
| WG review meeting 1 recording | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1/7/2020, 9pm | Epics spreadsheet: RSAC_Bronze_release_planning.xlsx Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2/17/2020, 11pm EST | Discussed Bronze at a glance updates from each OSC project. Slides -
Recording: https://zoom.com.cn/rec/share/y-5fF-rq-iBJYLfoyx6CS6gtMt_beaa82nQe_aFfzhmqSgBfY2bDWzQ6NNFNWim9 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2/19/2020, 11pm EST | Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides -
Action: Discuss in OSC TOC meeting regarding Viavi | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/3/2020, 9 am EST | Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH O-CU
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/10/2020 9 pm EDT | Bronze rel. – PTL reports from ODU LOW, INT | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/26/2020 9 am EDT | Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E
Viavi's short term and long term proposal for OSC
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/9/2020 9 am EDT | Meeting Recording: ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/28/2020 9 PM EDT | Meeting Recording: rsac-20200428.mp4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5/12/2020 9 PM EDT | Topic: Cherry release planning Meeting Recording: RSAC requesting PTLs to start suggesting EPICS for Cherry | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5/26 | INF project cherry epics
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6/18 | Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.) Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver user-59b16 user-d3360 to check on OSC lab status for L1 stack by 6/30 ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30 ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high |
Common IOT profile | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7/16/2020 9 AM EDT |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7/28 9 PM EST |
| O-DU High status (PPT attached)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8/18 9 PM EST |
Meeting Recording: Access Password: zYN&Hv3s | TIFG-OSC meeting slides
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9/1 9 PM EST |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9/15 9 PM EST | Intel servers configured in OSC lab for O-DU testing Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source) Ron Shacham to provide simulated trace files to Alex Stancu from Viavi sim into SIM repo user-59b16 David Kinsey to draft preliminary plan for D release; Requesting All PTLs to start thinking about D release work epics and Cherry flow over items Meeting Recording: https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10/13 9 PM EST | Meeting Recording https://zoom.us/rec/share/H6b2727deGhaKnuwuNHs4MF7i3Zao3y-gqMeY_WCYRj6WLI8Q6MzZjhjMJXyKLuU.H8QvANEkzqHlJ6R6 (Access Passcode: h&k2htXH) Martin Skorupski to perform code review for O1 requested by user-165cf Zhimin Yuan user-165cf to set up debugging session for pairwise O-DU low O-DU high testing user-59b16 , Rich Wright to check if P3000 card in O-DU low server (192.168.50.190) is connected correctly in OSC lab | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11/19 9 AM EST | Meeting Recording https://zoom.us/rec/share/VFSBeQa7lt1AlmAR3VIm4Sc8ooVaIOeMNiVbBKcB3MUOj3OCmK1hMozwT8PjFfpo.ATGZ99NFppAp5jbo Passcode: 5aKgaDF= Discussed O1/A1 use case for Dawn | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1/14/21 9 AM EST | Meeting Recording https://zoom.us/rec/share/mKYOGkB3mgpvIo2Hx1eY5Oifyw9qV9NQd7NiEj-FxQKP0kUpWOc7yvMO_LLPhA_M.lmx2LCh7-QwDHAFi user-59b16 to create call flow for use case |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2/25/21 9 AM EST | Meeting recording Discussed RU failure recover use case Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup user-165cfto check steps 12-23 in 3. ODU Startup – implementation task | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/1/21 9 PM EST | Meeting recording https://zoom.us/rec/share/B4mbnreNFgtNSndiu54gVkpx_C-89rO5ofRQ8hAbSjSx8jEOdAUrbaKVD1n2wJA3.Hdvyxfpw6i0lj6To user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/11/21 9am EST | Meeting recording listed to the right. Went through Release "D" Control Loop:
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/8/2021 | Meeting recording to be listed to the right once it is available. Went through Release "D" Flow:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/13/21 9 PM EST | Meeting recording: https://zoom.us/rec/share/DuzSNJy8-iAE-ll5JAh-GR4LEgHH4N3_J6on5A3p2O0TqShiW4Lfp5v1WwZhRRmk.O1sBLrdw6K86qN-E Discussed 5G super blueprint for E release DU - RU message interaction blockers TM500 equipment preparation by Viavi for delivery to OSC lab NJ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7/22/21 9 AM EDT | Meeting Held for discussion on Release "E" Disaggregated VES Reviewed proposal and discussed options. No Conclusions yet as this was more informatory. Next Meeting will try to work on specific deliverables by project. The attached presentation includes comments and on-going work between David Kinsey and Martin Skorupski which will be reviewed with the larger team at the next RSAC call. |
| https://zoom.us/rec/share/ENNFTIViSpkG6rBCzF-myIbR2i9WPzje9v7dBL0fGAI2ZM0uveyHqqBP0SkLGa3s.GQS0sL3rPgPErPsc?startTime=1626959214000 |