Date/Time | Comments | Doc | Recording | 6-4-19, 9 pm Eastern | Reviewed and addressed comments
| O-RAN SC Ver A SW Requirements 20190604a.docx | 7-30-19, 9 pm | Reviewed epics
| O-RAN SC Ver A SW Requirements 20190730a.docx | 8-1-19, 9 am | Reviewed Epics Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc? Move Release planning cadence to once a week. Alternate between evening and day every other week. Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray
| 9/26/19, 9am |
---|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
Epics spreadsheet: RSAC_Bronze_release_planning.xlsx
Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc
Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx
Discussed Bronze at a glance updates from each OSC project. Slides -
View file | ||||
---|---|---|---|---|
|
Recording: https://zoom.com.cn/rec/share/y-5fF-rq-iBJYLfoyx6CS6gtMt_beaa82nQe_aFfzhmqSgBfY2bDWzQ6NNFNWim9
Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides -
View file | ||||
---|---|---|---|---|
|
Action: Discuss in OSC TOC meeting regarding Viavi
3/3/2020,
9 am EST
Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH
O-CU
View file | ||||
---|---|---|---|---|
|
3/10/2020
9 pm EDT
Bronze rel. – PTL reports from ODU LOW, INT
3/26/2020
9 am EDT
Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E
- Setup meeting between TIFG, OSC and Viavi William DIEGO
- ONAP-ORAN harmonization and inputs to ONAP Guilan, John Keeney David Kinsey to present one slide to TOC next week
- Matti Hiltunen to send John Keeney TS xApp policy details
Viavi's short term and long term proposal for OSC
View file | ||||
---|---|---|---|---|
|
4/9/2020
9 am EDT
Meeting Recording:
https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_
ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering
Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH
Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU
Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement
4/28/2020
9 PM EDT
Meeting Recording: rsac-20200428.mp4
Topic: Cherry release planning
Start Time : May 12, 2020 09:00 PM
Meeting Recording:
https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC
RSAC requesting PTLs to start suggesting EPICS for Cherry
INF project cherry epics
HA in O-Cloud - 2 server deployment scenario duplexStart Time : May 26, 2020 09:01 PMMeeting Recording:
https://zoom.us/rec/share/-upyKIvR6DxIZtLy6kjkevdiGK_VX6a81yhL_qUIxU2sJ0PJ9nDsaKLVCk3ubLEW
Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.)
Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver
user-59b16 user-d3360 to check on OSC lab status for L1 stack by 6/30
ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30
9/9/21
9AM EDT
VES Improvements
- Disaggregation Tabled for now
- Kafka Backend to Influx/Elastic-Search/DMaaP
- Streaming PM (Should be an "F" Release Target)
- VES/JSON (Requires O1 CR) (AT&T)
- HV-VES Websocket/GPB (Requires O1 CR) (DELL
Scorecard
- Specification Compliance Scorecard
- Element Maturity (Behavioral Compliance)
- PTL to self report to Scorecard ("E")
- Interface (Specification) Compliance
- OTF (INT) is looking at the FH Test Specification for M-Plane ("E")
- OTF for Element which would apply the applicable Interfaces required by the NF (OCU-CP, OCU-CP, ODU, NearRT RIC)
- PTL Self Report ("E")
- OTF Auto Report ("F")
- Element Maturity (Behavioral Compliance)
8/12/21
9 AM EDT
Reviewed Slicing End-to-End call flows presented by user-30c9d. Need verification from Viavi on pre-configuration of Slices within Core and UE simulator to request admission to a Slice.
Reviewed VES Project to EPIC list presented by David Kinsey, need to work on iteration and resource mapping. Need OAM, SMO, and SIM PTLs
Discussed PTP Grand Master availability in the lab. David Kinsey to reach out to Nokia for status on FHG and how it provides/interfaces to PTP. E-mail sent today.
Discussed using format of ODU-HIGH Release "E" plan to formulate a release plan with one for each project. David Kinseyto send that. E-Mail sent with proposed template. This would replace the single 9MB growing powerpoint with a per-release plan.
7/22/21
9 AM EDT
Meeting Held for discussion on Release "E" Disaggregated VES
Reviewed proposal and discussed options. No Conclusions yet as this was more informatory. Next Meeting will try to work on specific deliverables by project.
The attached presentation includes comments and on-going work between David Kinsey and Martin Skorupski which will be reviewed with the larger team at the next RSAC call.
View file | ||||
---|---|---|---|---|
|
4/13/21
9 PM EST
Discussed 5G super blueprint for E release
DU - RU message interaction blockers
TM500 equipment preparation by Viavi for delivery to OSC lab NJ
Meeting recording: https://zoom.us/rec/share/DuzSNJy8-iAE-ll5JAh-GR4LEgHH4N3_J6on5A3p2O0TqShiW4Lfp5v1WwZhRRmk.O1sBLrdw6K86qN-E
Meeting recording to be listed to the right once it is available.
Went through Release "D" Flow:
- ODU-High still working a segmentation fault but have sent one message to O-DU low and should be enough to verify ODU-Low to O-RU
- Other Messages to follow working for UE Attach
- O-CU binary has been delivered to lab next step is to integrate with ODU-High and Core Simulator
- Once all these are done should be able to UE attach
- For ODU-High to SMO verified PNP VES will trigger netconf hello
- Simple Yang will be provided by Martin Skorupski which allows control of the link
- Please see
- wiki: Use case driven YANG modules for O-DU
Jira server ORAN Jira serverId 5ec52304-b77c-3ce7-af6a-112cb13e6008 key ODUHIGH-322 - gerrit: https://gerrit.o-ran-sc.org/r/c/scp/oam/modeling/+/5870
- email: https://lists.o-ran-sc.org/g/toc/topic/api_modification_process/81994146?p=,,,20,0,0,0::recentpostdate%2Fsticky,,,20,2,0,81994146
- Please see
- near-RT RIC will get the O-DU ID and send the change state to "ACTIVE".
- David Kinseytook an action to get an OTF/INT project representative for the RSAC.
3/11/21
9am EST
Meeting recording listed to the right.
Went through Release "D" Control Loop:
- Alignment of DMaaP Topics across projects
- Confirmed proposed YANG for O-DU is being analyzed by the O-DU team, should have an answer by next weeks call.
- Confirmed Config was sent to O-RU team, ODU Team needs to know how to initiate pairwise testing
- Reaching out to contributors for E2SIM modifications for Traffic Steering Use case
- David Kinseywill Reach out to OTF team for OTF E2SIM integration at the same time
- David Kinsey will work with user-59b16 to work with Taiwan University to see how best to use them for Integration Project. They likely will not have a FHG in their environment and therefore are missing O-DU functionality for Hybrid or Hierarchical support models to the O-RU.
- SMO discussion was deferred as Mahesh had another meeting commitment. Nothing major pending.
View file | ||||
---|---|---|---|---|
|
3/1/21
9 PM EST
user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions
Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation
2/25/21
9 AM EST
Discussed RU failure recover use case
Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup
Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup
Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup
user-165cfto check steps 12-23 in 3. ODU Startup – implementation task
Meeting recording
1/14/21
9 AM EST
Discussed RU failure and recovery use case (ppt attached)
user-59b16 to create call flow for use case
View file | ||||
---|---|---|---|---|
|
Meeting Recording
11/19
9 AM EST
Discussed O1/A1 use case for Dawn
Meeting Recording
https://zoom.us/rec/share/VFSBeQa7lt1AlmAR3VIm4Sc8ooVaIOeMNiVbBKcB3MUOj3OCmK1hMozwT8PjFfpo.ATGZ99NFppAp5jbo Passcode: 5aKgaDF=
9/15
9 PM EST
Intel servers configured in OSC lab for O-DU testing
Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help
Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source)
Ron Shacham to provide simulated trace files to Alex Stancu from Viavi sim into SIM repo
user-59b16 David Kinsey to draft preliminary plan for D release;
Requesting All PTLs to start thinking about D release work epics and Cherry flow over items
Meeting Recording:
https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb
9/1
9 PM EST
- Discussion about OSC lab setup and timelines for testing and integration
Week starting
Sept 7 – Configure Intel servers and install OS (windriver, server 1)
Sept 14 – O-DU Low software installation and unit testing with stub RU simulator (server 1)
Sept 21 – O-DU High software installation and unit testing with stub CU simulator (server 1)
Sept 21 – Viavi O-RU emulator, O-CU emulator, EPC installation on (Server 2)
Sept 28 – O-CU software installation and unit testing (Server 2)
Oct 5 – O-DU high and O-CU unit testing
Oct 19 – UE attachment and HO test
Oct 26 – UE attachment and HO test
The OSC lab server addresses are
Server 1
Management IP 192.168.4.29
Interface 1 192.168.41.190
Server 2
Management IP 192.168.4.30
Interface1 192.168.41.191
ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high
View file | ||||
---|---|---|---|---|
|
Common IOT profile
7/16/2020
9 AM EDT
- Working with Samsung and Near-RT RIC, problem with Subscription Mgr
- E2SIM has Viavi Schema and has demonstrated flow, waiting on 10 minute playback file from Viavi.
- Viavi indicates file wont be available until 7/24. Could work and lower risk with shorter file, Viavi will look into that.
- Proposal presented
- Discussion on external SMO open source alignment (John Keeney )
- Discussed possibility of sub-project instead of new project (John Keeney )
Start Time : Jul 21, 2020 08:50 AM
Meeting Recording:
https://zoom.us/rec/share/ou4lNK3RzDxJQ7f1s0bPZpMeF53Ueaa8hndK_qYOykxKEdi7dj46TU6b_Mxlyk-N
Access Password: y$SNs?w7
7/28
9 PM EST
- Discussion with Radisys on O-DU activity
- INF project installing OS and O-DU getting installed. Ganesh Shenbagaraman Sachin Srivastavato provide quick update on O-DU status
- Discussed about SMO project initiation and PTL election
- Discussed main challenges slide in OSC to be presented to EC by John Murray Jinri Huang
Start Time : Jul 28, 2020 09:03 PM
Meeting Recording:
https://zoom.us/rec/share/y85SdZrNp3lJZ5HvyBHva6kzOIi9eaa81igYrvZexUoZMVDrqQzkhXCuzECxunt4Access Password: M!s2VJg0
O-DU High status (PPT attached)
View file | ||||
---|---|---|---|---|
|
8/18
9 PM EST
- Discussion regarding O-CU MVP requirements for OSC
- Implement HO for traffic steering, defer E1 interface for Cherry
- Ganesh Shenbagaraman to raise topic to TOC
- Slides from ENGWEI KOO
- for 8/19
- Discussion regarding OSC and TIFG MVP requirements
- Slides from ENGWEI KOO
Meeting Recording:
https://zoom.us/rec/share/3NIlIoHd5nlIQoWX90_TX6A-T4XLaaa8gXca_qdbxElpW9nzSwAkkYnIq3rVWIHt
TIFG-OSC meeting slides
View file | ||
---|---|---|
|
9/1
9 PM EST
|
Meeting Recording:
https://zoom.us/rec/share/3NIlIoHd5nlIQoWX90_TX6A-T4XLaaa8gXca_qdbxElpW9nzSwAkkYnIq3rVWIHt
Access Password: zYN&Hv3s
7/28
9 PM EST
- Discussion with Radisys on O-DU activity
- INF project installing OS and O-DU getting installed. Ganesh Shenbagaraman Sachin Srivastavato provide quick update on O-DU status
- Discussed about SMO project initiation and PTL election
- Discussed main challenges slide in OSC to be presented to EC by John Murray Jinri Huang
Start Time : Jul 28, 2020 09:03 PM
O-DU High status (PPT attached)
View file | ||||
---|---|---|---|---|
|
Meeting Recording:
https://zoom.us/rec/share/y85SdZrNp3lJZ5HvyBHva6kzOIi9eaa81igYrvZexUoZMVDrqQzkhXCuzECxunt4Access Password: M!s2VJg0
7/16/2020
9 AM EDT
- O-DU and O-RU stub testing (Bronze maint.) (Zhimin Yuan , user-d3360 ); Have access to the box, waiting for Windriver to complete SW install before their SW can be installed
- KPIMON xAPP integration with Near-RT RIC (Matti Hiltunen , Ron Shacham, ENGWEI KOO )
- Working with Samsung and Near-RT RIC, problem with Subscription Mgr
- E2SIM has Viavi Schema and has demonstrated flow, waiting on 10 minute playback file from Viavi.
- Viavi indicates file wont be available until 7/24. Could work and lower risk with shorter file, Viavi will look into that.
- Cherry SMO Proposal (Martin Skorupski , Tracy Van Brakle )
- Proposal presented
- Discussion on external SMO open source alignment (John Keeney )
- Discussed possibility of sub-project instead of new project (John Keeney )
- SMO LCM and Application Deploy Scenarios (Martin Skorupski )
- LInk to recorded presentation available on OAM project meeting page. Separate link to also be added to Non-RT RIC page.
Start Time : Jul 21, 2020 08:50 AM
- LInk to recorded presentation available on OAM project meeting page. Separate link to also be added to Non-RT RIC page.
Week starting
Sept 7 – Configure Intel servers and install OS (windriver, server 1)
Sept 14 – O-DU Low software installation and unit testing with stub RU simulator (server 1)
Sept 21 – O-DU High software installation and unit testing with stub CU simulator (server 1)
Sept 21 – Viavi O-RU emulator, O-CU emulator, EPC installation on (Server 2)
Sept 28 – O-CU software installation and unit testing (Server 2)
Oct 5 – O-DU high and O-CU unit testing
Oct 19 – UE attachment and HO test
Oct 26 – UE attachment and HO test
The OSC lab server addresses are
Server 1
Management IP 192.168.4.29
Interface 1 192.168.41.190
Server 2
Management IP 192.168.4.30
Interface1 192.168.41.191
9/15
9 PM EST
Intel servers configured in OSC lab for O-DU testing
Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help
Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source)
Ron Shacham to provide simulated trace files to Alex Stancu from Viavi sim into SIM repo
user-59b16 David Kinsey to draft preliminary plan for D release;
Requesting All PTLs to start thinking about D release work epics and Cherry flow over items
Meeting Recording:Meeting Recording:
ou4lNK3RzDxJQ7f1s0bPZpMeF53Ueaa8hndK_qYOykxKEdi7dj46TU6b_Mxlyk-N
Access Password: y$SNs?w7
Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.)
Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver
user-59b16 user-d3360 to check on OSC lab status for L1 stack by 6/30
ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30
ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high
View file | ||||
---|---|---|---|---|
|
Common IOT profile
INF project cherry epics
- HA in O-Cloud - 2 server deployment scenario duplex
Start Time : May 26, 2020 09:01 PM
Topic: Cherry release planning
Start Time : May 12, 2020 09:00 PM
RSAC requesting PTLs to start suggesting EPICS for Cherry
10/13
9 PM EST
Meeting Recording
https://zoom.us/rec/share/H6b2727deGhaKnuwuNHs4MF7i3Zao3y-gqMeY_WCYRj6WLI8Q6MzZjhjMJXyKLuU.H8QvANEkzqHlJ6R6 (Access Passcode: h&k2htXH)
Martin Skorupski to perform code review for O1 requested by user-165cf
Zhimin Yuan user-165cf to set up debugging session for pairwise O-DU low O-DU high testing
user-59b16 , Rich Wright to check if P3000 card in O-DU low server (192.168.50.190) is connected correctly in OSC lab
11/19
9 AM EST
https://zoom.us/rec/share
Discussed O1/A1 use case for Dawn
1/14/21
9 AM EST
Meeting Recording
https://zoom.us/rec/share/mKYOGkB3mgpvIo2Hx1eY5Oifyw9qV9NQd7NiEj-FxQKP0kUpWOc7yvMO_LLPhA_M.lmx2LCh7-QwDHAFiDiscussed RU failure and recovery use case (ppt attached)
user-59b16 to create call flow for use case
View file | ||||
---|---|---|---|---|
|
4/28/2020
9 PM EDT
4/9/2020
9 am EDT
ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering
Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH
Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU
Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement
2/25/21
9 AM EST
https://zoom.us/rec/share/
Discussed RU failure recover use case
Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup
Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup
Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup
user-165cfto check steps 12-23 in 3. ODU Startup – implementation task
3/26/2020
9 am EDT
- Setup meeting between TIFG, OSC and Viavi William DIEGO
- ONAP-ORAN harmonization and inputs to ONAP Guilan, John Keeney David Kinsey to present one slide to TOC next week
- Matti Hiltunen to send John Keeney TS xApp policy details
Viavi's short term and long term proposal for OSC
View file | ||||
---|---|---|---|---|
|
3/1/21
9 PM EST
user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions
Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation
3/11/21
9am EST
Meeting recording listed to the right.
Went through Release "D" Control Loop:
- Alignment of DMaaP Topics across projects
- Confirmed proposed YANG for O-DU is being analyzed by the O-DU team, should have an answer by next weeks call.
- Confirmed Config was sent to O-RU team, ODU Team needs to know how to initiate pairwise testing
- Reaching out to contributors for E2SIM modifications for Traffic Steering Use case
- David Kinseywill Reach out to OTF team for OTF E2SIM integration at the same time
- David Kinsey will work with user-59b16 to work with Taiwan University to see how best to use them for Integration Project. They likely will not have a FHG in their environment and therefore are missing O-DU functionality for Hybrid or Hierarchical support models to the O-RU.
- SMO discussion was deferred as Mahesh had another meeting commitment. Nothing major pending.
3/10/2020
9 pm EDT
Bronze rel. – PTL reports from ODU LOW, INT
3/3/2020,
9 am EST
Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH
O-CU
View file | ||||
---|---|---|---|---|
|
Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides -
View file | ||||
---|---|---|---|---|
|
Action: Discuss in OSC TOC meeting regarding Viavi
Epics spreadsheet: RSAC_Bronze_release_planning.xlsx
Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc
Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx
OSC and WG review meeting 1
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
View file | ||||
---|---|---|---|---|
|
Reviewed Epics
Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc?
Move Release planning cadence to once a week. Alternate between evening and day every other week.
Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray
- Tlab (AT&T)
- OTIC (O-RAN Test and Integration Centre - Asia/Europe/North America (inter-connected)
- Windriver lab ?
- CMCC ?
Reviewed epics
- INT-A-F212 clarification added in annex for PNF registration
- Need John Keeney Martin Skorupski to develop use case design doc
- RICNRT-A-F10 for OSC Rel A ?
- Need John Keeney and Tommy Carpenter to develop minimal use case
- INF-A-F01 epic clarification needed from Paul Carver
- INT-A-F013 - recruit Eliza Celenti to stand up OTF framework for Rel A
- RICAPP-A-F110 - UE Monitor for slicing
- Jun Hyuk Song to provide clarification of this epic, UE-NIB, overlap with UE Manager xApp
Reviewed and addressed comments
- Created epics for different project groups
View file | ||||
---|---|---|---|---|
|
Meeting recording to be listed to the right once it is available.
Went through Release "D" Flow:
- ODU-High still working a segmentation fault but have sent one message to O-DU low and should be enough to verify ODU-Low to O-RU
- Other Messages to follow working for UE Attach
- O-CU binary has been delivered to lab next step is to integrate with ODU-High and Core Simulator
- Once all these are done should be able to UE attach
- For ODU-High to SMO verified PNP VES will trigger netconf hello
- Simple Yang will be provided by Martin Skorupski which allows control of the link
- Please see
- wiki: Use case driven YANG modules for O-DU
Jira server ORAN Jira serverId 5ec52304-b77c-3ce7-af6a-112cb13e6008 key ODUHIGH-322 - gerrit: https://gerrit.o-ran-sc.org/r/c/scp/oam/modeling/+/5870
- email: https://lists.o-ran-sc.org/g/toc/topic/api_modification_process/81994146?p=,,,20,0,0,0::recentpostdate%2Fsticky,,,20,2,0,81994146
- Please see
- near-RT RIC will get the O-DU ID and send the change state to "ACTIVE".
- David Kinseytook an action to get an OTF/INT project representative for the RSAC.
4/13/21
9 PM EST
Discussed 5G super blueprint for E release
DU - RU message interaction blockers
TM500 equipment preparation by Viavi for delivery to OSC lab NJ
7/22/21
9 AM EDT
Meeting Held for discussion on Release "E" Disaggregated VES
Reviewed proposal and discussed options. No Conclusions yet as this was more informatory. Next Meeting will try to work on specific deliverables by project.
The attached presentation includes comments and on-going work between David Kinsey and Martin Skorupski which will be reviewed with the larger team at the next RSAC call.
View file | ||||
---|---|---|---|---|
|
8/12/21
9 AM EDT
Reviewed Slicing End-to-End call flows presented by user-30c9d. Need verification from Viavi on pre-configuration of Slices within Core and UE simulator to request admission to a Slice.
Reviewed VES Project to EPIC list presented by David Kinsey, need to work on iteration and resource mapping. Need OAM, SMO, and SIM PTLs
Discussed PTP Grand Master availability in the lab. David Kinsey to reach out to Nokia for status on FHG and how it provides/interfaces to PTP. E-mail sent today.
Discussed using format of ODU-HIGH Release "E" plan to formulate a release plan with one for each project. David Kinseyto send that. E-Mail sent with proposed template. This would replace the single 9MB growing powerpoint with a per-release plan.