  • Ongoing installation of O-CU.
  • Ongoing installation of free5GC.
  • Finalization of RIC platform.
  • O-DU-Low and O-DU High Integration (F G Rel.) is ongoing.
  • Currently, O-DU integration is the top priority
  • Revert TM500 back into current topology

Access

Access is limited and resource sharing is not yet available.

...

Email:         crg@gapps.ntust.edu.tw

Diagram

Lab 1 - NTUST Lab

Image RemovedImage Added

Lab 2 - NYCU Lab

...

The integration of O-DU Low (FlexRAN 21.0311) and O-DU High in Rel. F G is ongoing.

O-CU

The installation of commercial O-CU provided by Radysis is ongoing.

...

Viavi TM500 is provided in NTUST Lab., ChungHwa Telecom (CHT) Lab. and Auray Lab. for O-DU testing (the same as that used in OSC New Jersey Lab.)

...