Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Date/TimeCommentsDocRecording
3/22/2023

Andrea Buldorini: SMO Decomposition and how that applies to OSC

AP: Formalize NFO/FOCOM Use Cases for "H" for submittal to WG1; assigned to David Kinsey 

Shankar: Open-Source Harmonization with OSC


https://wiki.o-ran-sc.org/download/attachments/3604609/TIM-2023.03.22-OSC-RSAC_Architectural_principles_for_SMO_Services_integration.pdf?api=v2


https://wiki.o-ran-sc.org/download/attachments/3604609/ONAP_OSC_Areas_20230321.pdf?api=v2

Video: https://zoom.us/rec/share/D3ZkRsAQ1lu9QY1zomJmAnmXzAUL3FTWJSFqCPDIUKVmZ96HbEu7DQLy34yidjDe.GMyDeZXm34UwgOSR


Audio: https://zoom.us/rec/share/WHxLIovLZwplnMMG8S-ug0if9N6_Yan_EozSFIU-MsqlazU_AJoLeLMIxELzPw_d.HJXpZGiTQNOF3XUI 

3/8/2023

NTUST Lab: Ankit was unclear if lab was reverted. Prof Ray indicates the server is the same they have been using. Bimo there was some work for integration to real RU but now is connected to the TM500. Ankit to verify if change corrects the blocking issue.

O-DULOW no plan to upgrade to newer version. Willing to provide bug fixes as needed.

ONAP projects with OSC synergies not yet available. Work is in progress.

SMO Function Flows. Discussed current work for O2IMS Cloud Registration and Discovery flow and Homing Flow.


Video: https://zoom.us/rec/share/GqibkTXPX22Nna8ugM5lMPs1GQNUgTyjFeY9WhLeV-nPnk4qwNRlUmy-qRz2xBrj.w_-Q2VUHw2EZtptR


Audio Transcript: https://zoom.us/rec/share/TTR6lFw7o_K-u8NKhKTOJzm_zS4CisX-di1QEhRnvw5Lo4Z85PsarvNNrCXMYM-S.mnAh9buqT2J6gCto


2/28/2023

AI: Ankit Barve  requesting NTUST lab to revert to old lab so that O-DU high testing can progress. Integration testing is stalled for the moment due to ATT lab's unavailability. Dennis to ask Prof Ray and Bimo (bimo fransiscus asisi) and report back to RSAC.

AI: Ankit Barve  requesting O-DU Low PTL (Luis Farias) for new release s/w version 22. O-DU high is currently using version 21 of O-DU low s/w. 



2/8/2023

Timo Perala (ONAP requirements co-chair) provided an update on ONAP projects that are related to OSC.

AI: Timo to work with N.K. Shankaranarayanan, John Keeney and Martin Skorupski  to come up with a list of projects that have synergies/touchpoints with OSC



Video: https://zoom.us/rec/share/9X1v6Yhvqj8FlPU6-OObqnGhH8BY_kYFUqbH7fADygY7gIsRPicwquKawfDQDL8b._S8SB51ogACVaxkg

Audio: https://zoom.us/rec/share/Z09nCSFLm31P3_JJDtj1EXou9UigMRiloauWsMsK7kF5-BJcKMtQ_V9ZArSVBhEw.5FoRyzPECAd8gTRn

1/25/23

OAM Project

  • Update VES messages and align with 3GPP Rel 18

SIM Project

  • NS-3 project update to E2SM 2.0 (reach out to Michele Polese)
  • OAI and OSC interop

INT Project

  • Work ongoing with INF project in CA lab

https://zoom.us/rec/share/CrsxvAC6UYiaZLf0hJ7OXMXVP0VjTd-VocidgOS9YiQ5GUYXL8e8ZrnH3n8675ie.sNaZ9mYkLrSQ6cG-
1/18/23

SMO Project

  • Gaps for "H"
    • FOCOM
      • Cloud Registration
      • DMS Deploy/Config (Tacker)
      • Cloud Inventory
      • Package Onboarding
      • Package Inventory
    • NFO
      • Homing
        • - 2 tags
          • Cluster-Type (AIO-SX, AIO-DX, AIO-DX+)
          • Package Type (ASD, ETSI)
        • All Deployment Items to same DMS, later might have distributed deployment
      • Package Deployment Inventory
        • Multiple Deployment Items
  • Integrations
    • AIML-SMO Influx

 INT Project

    • OAM+SMO+NONRTRIC+AIML=baseline SMO

https://zoom.us/rec/share/N61MtSYjv8kMdACzOX9-bPbKjVBIb62IeQy7hx1dtSZIrkPJNEs1mlnkz0zDWMLo.RTCzcnSKkJBecMv0
1/17/23

End-to-End Lab

  • Need Cloud connections to OAM/CP/UP networks, need ODU-HIGH to OAM/CP/UP networks.
    • ODU-OCU CP/UP bidirectional
    • ODU-OCU to SMO bidirectional
    • OCU-AMF on CP
    • OCU-UPF on UP
  • Deploy O-CU
  • Taiwan Lab
    • Working server configuration for ODU install
      • Server is more powerful than needed but something is off on the configuration. Need Radysis and Intel to assist.
      • Would like more documentation on configuration for both O-DUHIGH annd O-DULOW.
      • O-Cloud Simplex Install Complete

O-RAN F2F

  • Need "G" Summary/"H" Plan


NTUST - ODU Scheduler Decoupling so that different schedulers can be used.

  • Coordinate with Ankit for NTUST for new committer.



Open RAN Work Shop on Feb 13 and 14: https://www.knaintl.com.tw/2023OpenRan/


Need to ensure O=RAN F2F does not conflict.

https://zoom.us/rec/share/SE5Ea0Md5dJb2SGjiqwRWbC4D2mrSWNfLlKb7rAp9tckiHWDaFnE4BImgioa0s5O.uYAIzkptRuJWzJlh
(Recording seems to refer to a RIC PLT project meeting?)
1/11/23

"H" Release Planning - Are we ready for O-RAN F2F?

AIML

  • DME Integration
  • Training pipeline Enhancement
  • SMO - InfluxDB Integration
  • KServe adapter
    • Deployments to Near-RT RIC
    • Suggest Deployments to Non-RT RIC as well

O-DU HIgh

  • End-to-End Integration
    • TDD/MU1/100Mhz
    • FDD/MU0/20Mhz
  • Feature Enhancement - Stub-based Testing
    • Alignment WG-8 AAD Specification 
    • Inter CU Handover Support
    • E2 Interface enhancement

TACKER

  • Need to find out how to fill in the SMO Gaps

OSC/ONAP 

  • Trying to establish more structure around the relationship.

NTUST

  • Upcoming Open RAN Workshop


12/28/22Cancelled for Holidays

12/20/22Cancelled for Holidays

12/14/22

Blockers for Release "G"

Tacker (SMO) - Ready

AI/ML - Ready

O-DUHIGH - Move blockers to "H" Backlog

Some Cleanup is needed, this will drop the Lines of Code this will be done during the maintenance release. This will not result in any functional change.

"H" Activities

OSC - OAI Integration

Possible Options: End-to-End using OSC RAN and OAI Mobile Core can be incremental in where the workloads execute. Target would be to use O-Cloud?  Goal: End-to-End 5G Open Source Network

Possible Options: OSC SMO Integration with OAI Elements Goal: Would standard manageability

Possible Options: RIC-RICAPP Portability OSC RIC with OAI RICAPPs, and vice-verse Goal: xApp Portability

Step 1: What would it take for SMO to deploy in a (OSC or OAI) lab a OAI CN element. Goal: Explore the gap between OAI NF and OSC Infrastructure/SMO.

OSC - ONF Integration

Possible Options: RIC-RICAPP Portability OSC RIC with OAI RICAPPs, and vice-verse Goal: xApp Portability

Tacker "G" Update

Supporting 02DMS-ETSI looks like part of Cloud

Can be configured with K8s API which would be like a consumer of the O2DMS-K8s and therefore deployed as part of the SMO

For "H" we need new SMO functions for Homing, Inventory, and NFO. These can be minimal in which ASD support by Tacker would consume the O2DMS.

Need to work out how Tacker for ETSI as a O2DMS-ETSI is registered with SMO, vs Tacker as a NFO extension, uses the O2DMS-ETSI. Could NFO then just use the passed Tacker instance as its orchestration end point?




12/7/22


12/6/22

SMO/OAM/AI-ML/NonRT RIC/O-Cloud Integration for Release H

  • No RSAC calls in 2022 after the 12/14 meeting.
  • Focus of "H" will be "SMO Integration" to be further discussed on 12/7/22 RSAC after the SMO project meeting.
    • NFs to work on packaging and PNF/CNF Registration
    • SMO Blueprints (SMO/OAM/Non-RT RIC/AIML)
    • INF to support VMs for SMO components
    • Lab O-Cloud Build-out to move off of Lab OpenStack VMs


12/5/22

Release H Planning

  • O-DU

Lab Status

  • Update on OSC US East Lab Network update


11/30/22

Release H Planning

  • SMO
    • Tacker Capability - SOL001 and SOL003 (VM/CNF)
    • "F" Tacker integrated with CISM
    • "G" Tacker integrated with VIM
    • "H" Tacker integrated with OAM (Packaging)
      • ETSI NFV first
      • K8s second
      • Extend to support ASD
      • FM/PM requires O-RAN WG6 specification
    • Need Contributions outside of Tacker for:
      • Cloud Registration (FOCOM)
      • Cloud Inventory (FOCOM)
      • Homing
  • INF
    • Do we need OpenStack support for SMO/Tacker deployments via the O-Cloud?
  • AI/ML
    • Interface prototyping
      • AI/ML to DME?
      • What is the data interface for xApps
      • Integrated Installs

Lab Planning

  • David to get with Rich for server network interface to support OAM, Control, and User Plane connections. Then configure Core Simulator for Control and User Plane network connections.
https://wiki.o-ran-sc.org/download/attachments/3604609/Report%20on%20Tacker%20G-Release_for%20SMO_October_r3.pptx?api=v2
11/23/22

Release H Planning

  • Non-RT RIC
    • Wrap-up rApp Mgmt
      • LCM Instantiate/Terminate/Update
      • Onboarding/Registration
      • Service Exposure/Discovery
      • Data Exposure/Discovery
        • DME Subscription - Stretch Goals
      • A1 over R1
  • SMO/INF
    • O2 Integration
  • SMO/NF OAM SMOF
    • Alarm Analytics
    • Performance Job Management
    • Alarm/Performance DME Registration - Stretch Goals
  • AI/ML
    • Componentize AI/ML-NonRTRIC interface functions
    • Interactions with DME/Databases
    • Continued CI/CD Improvements from "G"
  • INT
    • OSC Project/SCCL Project Integration




11/22/22No Meeting

11/16No Meeting

10/05/22
  • F2F videos

Next week video submission 10/11/22 deadline to RSAC https://wiki.o-ran-sc.org/display/RSAC/Contributions
SMO - O-DU and SMO video (Mahesh)
OAM, SIM - Martin, video for O1 notify PNF registration, 3GPP alarms, WG4 and WG10 (Martin, Alex)
Integration - James to update the current video 
AI/ML framework - Joseph to show the dashboard and initial training flow video
O-DU - O-Du setup and handover video (10 min video Ankit)
Non-RT RIC - prepare a short presentation (Status update by John K)
Near-RT RIC - 30 min video (Thoralf)
INF - O-Cloud ?? send email to Jackie

- H planning
  SMO and O2 integration
  TAacker vs K8s native, both DMS available
  AOSX, AODX, AODX+ selection attribute in DMS
  5G super blueprint
  OAI ?? Can only run in Taiwan lab (Academia)
  AI/ML framework and SMO flows
    Where does AIML f/w derive its data from (training data)?
    SMO -> R1 -> DME -> O1 -> AI/ML
  Non-RT RIC
    R1 implementation and rApp mgmt, start enforcing the use of R1 i/f
    SME module
    rApp LCM enforcement
    DME will have examples of the use of PM jobs over R1 (Streamed and file based)

Create a short OSC overview deck, accomplishments and status update for G release (Jinri, James, David, Rittwik)
- 6 releases
- 3 independent labs
- 10 projects
- TOC/RSAC
- https://insights.lfx.linuxfoundation.org/projects/oran/o-ran-sc/dashboard

AOB
Joint FYUZ conference following O-RAN F2F
-windrvr to present


https://zoom.us/rec/share/fPmuXD5hu8AuQU-05TgSMweWDUXScoDv9E2ly9XhFUhBByEthIMGapdgBrinurHM.Pn6IuIu9B6XFeV3c?startTime=1664971419000
9/21/22

F2F Agenda

  • AI/ML will create a video
  • INT project demo recording
  • SIM - Video record StdDefined VES
  • O-DU - recorded Handover feature
  • Near-RT Demo recorded - 30 minutes
    • How to deploy Near-RT RIC
  • SMO - planned demo of receiving O1 from O-DU

"H" Planning

  • Super Blueprint

O-DU

  • Need ASN Decoder, current Git source is now archived
  • Points to Nokia seed however, some messages are not being properly encoded
  • It is unknown who to contact to correct in code base or what is wrong with O-DU code
  • Will bring up at the TOC

https://zoom.us/rec/share/KucELauhPH0LQzNmQwHWch53gVm69HTHNqkDFgvAUbjRjL2X38fJqiUVUI_qWLyx.QzG7L4iG0JHLCg0u?startTime=1663762137000
9/13/22

O-CU Deployment into O-Cloud

O-DU Status


190 Server should have images and HELM but currently doesn't allow SSH.  – Rich to Check...

Once SSH is re-enabled then we need to know the directory 

10am Eastern Thursday Ankit (O-DU), James (INT), David (RSAC), Jon (INF), Rittwik (RSAC), Bimo (NTUST) - David to setup meeting




9/7/22

AI/ML Project status

Madrid F2F agenda

NJ Lab Review

O-CU deployment

O-DU 190/191 reachability issue

View file
nameOSC O-RAN F2F Madrid_v1.pptx
height150

https://zoom.us/rec/share/zcZ9EaeIBL28A9iJO_ZNWFRkP7moXf7pPyJkCr1lj-BBuczBQ13hz31zmgd0H7Rw.-LhYMD33cmeqK-pN
8/24/22

Demo Availability for O-RAN F2F Oct 20th 4:30pm-7:45p, Madrid 

  • OAM
  • SIM
  • NON-RT RIC
  • RICAPP
  • AI/ML

AP: David Kinsey to schedule synch up for OCU Deployment from SMO via TACKER using O2 Interface from INF.


OAM - VES Standard Defined Message

SIM - Yang Sim or E2 Sim demo -

Potential Integrated demo: SIM VES Generation, OAM Collection, SMO Storage in InfluxDB

CU Deployment

Non-RT RIC: Will come up with something specific for O-RAN

AI/ML: Joseph will look into what is possible from the initial seed.

RICAPP: No data

RICPLT: No data

SMO: No data

https://zoom.us/rec/share/XDUKKQ2vKhmv92N8vMZjFmQCB8IklCHRw2VtYNb0C9WzGPDlqZTnh4iTJxSertFV.OYT2xNtpFXtfTY7Z?startTime=1661342737000
8/16/22

Draft Agenda:

Demo Availability

  • INF
  • RICPLT
  • RICAPP
  • OAM
  • SIM
  • Non-RT RIC
  • SMO
  • AI/ML
  • ODU
  • E2E

INT Project: XFT Framework demo Wed RSAC Sep 21st. Will record and make available to Tue participants.

ODUHigh: Demo Sept 13 or 27 Handover feature from "F"; Stub based demo; In Local Dev Lab.

End-2-End will be prior release tests: Closed Loop tests.



8/10/22

Draft Agenda:

Demo Availability

  • INF
  • RICPLT
  • RICAPP
  • OAM
  • SIM
  • Non-RT RIC
  • SMO
  • AI/ML
  • ODU
  • E2E

INT proj (James) to set up discussion for XTF testing framework

AI/ML proj to provide a repo structure 

AI/ML project to interface with SMO project to understand the touchpoints

OAM project is working with Tacker proj for initial integration

https://zoom.us/rec/share/tAg4xrQrFVS77ptka3MGWk1BsC8xK7INBLkcRfMfoK7Nh3g87NoaaQ2MChu2RPNu.QDw9-JWJhP_SPSvD
8/2/22Cancelled.

7/27/22 8AM Eastern

Release "G" Feature Planning

  • RICPLT
  • NONRTRIC
  • OAM - Received in e-mail - In project will add to Release
  • SIM - In project will add to Release
  • AI/ML
    • "G" Standalone, possible RICAPP deliverable too
    • "H" begin cross-project integrations

Lab Status

  • US WEST

AI/ML Project Proposal




View file
name20220727 OSC NONRTRIC G-Release Proposal for RSAC.pdf
height150


7/19/22 9PM Eastern

Release "G" Feature Planning

  • ODUHIGH
    • End to End Integration support (Spillover from previous releases)
      1.TDD/Mu1/100MHz
      2.FDD/Mu0/20MHz *


    • Feature verification (Spillover from previous releases)

      • Closed-Loop Automation

        • Link Failure Detection and Recovery

        • Slicing PM Reporting and PRB Reservation

      • 16QAM and 64 QAM

    • Feature Development
      1. Implementation of Discontinuous Reception (DRX)
      2. Inter CU Handover support
      3. Aligning all modules and interfaces to latest specifications

    • Question to INT for Health Check requirement, request parameters and expected results.
      • Alarm Summary?
      • Module Status?
      • Interface Status?
  • ODULOW
  • RICAPP in project meeting notes
  • INF - Received in e-mail

Lab Status

  • US EAST
RICAPP Meetings - RIC Applications - Confluence (o-ran-sc.org)


7/13/22 8AM Eastern

AI/ML Deployment Options

  • Separate Project
    • It has integration touch points with several projects
    • inside one may cause neglecting others (NonRTRIC, RICAPP, RICPLT)
    • Clear boundaries need to be defined to ensure non-overlapping scope.
    • Propose separate project - Avinash will work project description containing details articulated by John-Paul and Thoralf:
      • John-Paul Lane: If we decide the AI/ML proposal should be in its own dedicated project, we need a project proposal which TOC can review and vote on. As John Keeney has pointed out, understanding scope of the project, its ambition and how it interacts with other projects is key input to the proposal.
      • Thoralf Czichy : in Order to define the scope in more detail…
        • (1) discuss data architecture (data flows)
        • (2) overlap in model manegement and r/xApp LCM
        • (3) define interfaces with existing projects
        • (4) define an example set of r/xApps that are being developed in parallel as a proof of concept
      • From John-Paul Lane: Some pointers to creating a new project proposal are included here Seed Code Contribution/ New Project Proposal Process (DRAFT) Also, it is interesting that there is an attempt to define when a new project can / should be created. There are examples of new project proposals which have been presented to TOC previously. Maybe @Mahesh could share the SMO proposal? Or if there are others they could be shared too.
  • If inside existing which one
    • No Good fit
    • Would require a clear integration vision

Release "G" Feature Planning

  • RICPLT - Deferred to post project meeting
  • SMO
    • Integration with ODU for PM Reporting
    • TACKER to deploy CNF or VNF to be selected later
  • RICAPP - Deferred
  • SIM - Deferred

Lab Status

  • TUWU

https://zoom.us/rec/share/XkyYHgU9bu-mxQjPMLCw9qTai0J6c0vAPVYG-CrN0uQ-niRNyXJdlY4Z6fcgRcvp.wNYgxQmILnksoaTM?startTime=1657714580000
6/29/22

Reviewed proposal for new AI/ML Framework project


View file
nameRSAC-06-29.m4v
height250

6/15/22

Reviewed proposal for new AI/ML Framework project

  • Slides will be posted when available
  • Scope noted as large, suggestion from other PTL was to commit to a focus initially and expand over time
  • Some LCM may overlap with Non-RT RIC rAPP LCM this needs to be refined such that a clear demarcation exists between the two projects
  • With four projects for the overall SMO one project will need to be responsible for ensuring they can all be assembled into an O-RAN SMO. Suggestion was for the SMO project to be this point but the PTL was unable to make the meeting.

View file
nameO-RAN SC Y2022 (RSAC Meeting 15th Jun).pdf
height150

Topic: Zoom1 O-RAN SC's Personal Meeting Room
Date: Jun 15, 2022 08:07 AM Eastern Time (US and Canada)

Meeting Recording:
https://zoom.us/rec/share/sCINkMMM7TRqQ4QuN7h4tzbedDAzUhrIQe4dvSeSKedZ-yjgOBHNYbVURjLAosde.g7X-rxZ8SXsCs7xD

6/7/22James Li

6/1/22
  1. ORU-ODU pairwise testing progress (10 minutes)
    1. ODU Synch still the same skipping clock. 
    2. Action Item: David will get with Rich to verify if 190 is connected to the O-RU or 191?
  2. OCU deployment on O-Cloud progress (5 minutes)
    1. Binaries have been released from Radysis.
    2. Action Item: David will get with Bin (INF) to verify IP and availability of AIO-SX.
    3. Action Item: Ankit will FTP to lab and work with Bin (INF) to deploy onto AIO-SX,
  3. Release G Planning and O-RAN F2F Synch (45 minutes)
    1. Only the ODUHIGH and INT PTLs were present. Planning was not able to occur.
      1. ODUHIGH "F" Features were held up by lack of O-RU availability, therefore "F" Features are backlogged into "G".
      2. INT "F" Features were held up by OTF no longer maintained and thus non-viable. Therefore "F" Features are backlogged and will have to be replanned into "G". PTL is working with LF to find out how their CI/CD Toolchain might be used. Will require participation by each PTL in "G".
    2. Action Item: David to bring up to TOC that RSAC is only effective if PTLs participate.
        • DUPLEX+
  4. Walk Ons:
    1. Samsung proposal for AI/ML Framework project. John Keeney had to drop and Mahesh was not in attendance. We need those projects and preferable OAM and INT as well to understand how the SMO is assembled from the potential 4 projects.
      1. Action Item: Samsung will start an e-mail thread and hope we will have a quorum to discuss either on the SMO+RSAC or the next RSAC+SMO calls.
    2. Tacker development team still needs lab access for SMO project
      1. Action Item: David to reach out to Rich to make sure the request didn't get missed.


5/18/22

IXR Should be ready by 5/20/22. We found a bad optic cable and are replacing it.

OTF is permanently down, we are soliciting ideas from PTLs for new test automation tooling or ideas.

INT needs each PTL to create a "Healthcheck" type of test/script in which the project can be deployed and verified as "healthy". INT will then look for interoperability across projects. This will require participation from the individual projects and is not something INT can do entirely on its own.

We identified while working towards the OTF workshop that projects sometimes assume things still work, when in fact they don't. This verifies the need for automated testing.

O-DU HIGH needs O-DU LOW to install/verify the latest build in installed in the OSC lab. David and Rittwik will reach out to ODULOW to ensure there are not any blockers.



5/10/22

OTF workshop postponed to next week. 

Here is the progress in Taiwan OSC Lab (Prof. Ray):

- New results

  1. Modified OAI CU 

     * Topology: PHY-Stub <--> OSC O-DU-High <--> OAI CU: RRC  Connection Setup is done.

 2. Tested the S-Plane in Chunghwa Telecom (CHT)

     * Topology: GM <--> O-DU <--> TM500 RU Simulator


- New partner: Auray will also provide their TM500 to support the OSC testing. Auray is also running OTIC Lab. in Taiwan 


- On-going jobs

  1. Joint survey paper
  2. Auray will make a trip to US. They hope to visit OSC Community NJ Lab. Please check any available slots if possible.


- On-going jobs in Taiwan lab and need support from Radisys

  1. Testing Intel FlexRAN 21.03 version of O-DU Low

Ankit: This activity has not been planned in F release and will be taken in account during next Release planning phase (G release)

2. We added an E2 Handler in O-DU High and connect it to RIC: Ankit, please reply with an email showing your plan.

Ankit: As of now we are reaching towards end of the F release and do not have bandwidth to accommodate these changes with review.



5/4/22

Lab update

  • OTF integration ongoing. Bringing up a simple rApp using OTF (James Li, John Keeney)
  • Nokia Front haul gateway configuration plan and ETA? Need to close this item asap. 
  • TM500 availability
  • PTP installation and configuration. Need to close this item. 

4/7/22

Lab update

  • OTF integration in Duplex O-Cloud (Alex C, David K, James Li, Bin Yang)
  • Template file preparation for O-CU (Ankit Barve )
  • PTP installation and configuration (Rich Wright ATT, David Kinsey )

Topic: Zoom1 O-RAN SC's RSAC mtg
Start Time: Apr 7, 2022 09:08 AM

Meeting Recording:
https://zoom.us/rec/share/wCsBDCOaJiCpyWDorvmkLjEKOSSl6srTASAWYQe5HpmBkT9KYXUWbB02j5JYEWv0.bQ6lnFyGjIMVpJ10

2/15/22

Lab Update

  • 3 Servers identified for INF Project
  • IXR Configuration in Progress. Have Nokia Resource to assist. 
    • Requires new 10.10.11.xx IP for OAM Network Gateway on M-Plan VLAN


1/27

Lab Needs

  • DU and RU connections
    • vlans 
    • Clock Multi-Cast Address (hard coded or default/std)


1/18/22Developed "F" Release presentation from previous meeting notes.

View file
nameOSC F Release PlanV1.pptx
height250

Pending
1/13/22

"F" Release

  • SMO
    • Integration to O2 (INF)
  • INF
    • O2 IMS
    • O2 DMS (pre-spec aka HELM)
    • System Controller Cloud
      • Manages Sub-Clouds aka distributed resource pools)
      • Creates Distributed Cloud Architecture
    • O-Cloud with three resource pools
      • SIMPLEX
      • DUPLEX
      • DUPLEX+
  • ODUHIGH
    • Support Paging Feature
    • Inter-DU Handover
      • 2 DUs under same CU
      • Requires another Server for second Physical O-DU
      • Need to check with Viavi to see how this affects the O-RU simulator

"G" Release

  • SMO
    • Possible bring in ONAP ASD Orchestrator (O2DMS candidate)
      • Contact Byung-Woo Jun from ONAP Architecture
    • Needs to support O-Cloud Registration (O2IMS)
  • INF
    • Add 4th resource pool from Blockhouse Resources
    • add those resources to Duplex+ Cluster creatings a distributed cluster

Pending
12/16/21

Next Meeting 1/4/2022

"F" Release

  • RICAPP
    • OTF "F" Release Test
    • RC xAPP (Slice Management)
  • RIC
    • OTF "F" Release Test
  • OCU
    • OTF "F" Release Test
    • Test Stub Image Basic Support of O1
  • ODUHIGH
    • OTF "F" Release Test
    • Support HARQ Feedback
    • Scalability (Scheduler Enhancement)
    • E2 Interface Upgrade
      • Near-RT RIC Connection (Stretch Goal)
  • ODULOW
  • OAM
    • OTF "F" Release Test
    • O1 Pre-Release for Message/Streaming
  • SIM
    • OTF "F" Release Test
    • O1 Pre-Release for Message/Streaming
  • NonRTRIC
    • OTF "F" Release Test
    • R1 Service Exposure
      • A1 Policy
      • A1 Enrichment
      • rAPP Onboarding/Deploy
    • Test Scenario Organization
      • By Scenario/Use Case
  • SMO
    • TACKER (Orchestration) (Docomo)
      • What will be deployed?
    • CRD Based Onboarding (Kubernetes Deployment) (VMWare)
      • xAPP
      • rAPP (Stretch)
    • OTF "F" Release Test
  • INF
    • 3 Resource Pools (SIMPLEX, DUPLEX, DUPLEX+) Kubernetes
    • OTF "F" Release Test
  • INT
    • OTF "F" Release Test

Pending
12/7/21

Lab Status

  • NJ Lab
    • O-DU High still not accessible
      • Pending correction of this to install FHG (IXR+PTP-GM)
      • May have to resort to invasive recovery of the hardware
    • Discussing with Viavi on strategy for TM500 sharing from the lab
  • "F" Release
    • Discussed Windriver plan for O-Cloud/O2 builds in "F"
    • Discussed VMWare plan for xAPP Onboarding Package in "F"
    • There was a mention of O2 from DCM, "Tacker". More information expected on SMO call Thursday.
  • "G" Release
    • Migration of all xAPPs and Near-RT RIC to deployments from SMO, with homing to blockhouse servers in the Duplex+ Cluster (Spans two resource pools).

https://zoom.us/rec/share/rc59UMy0Dwu5ufHBwgU7p3OOR_pr52HtkTkYPHfhCBv9pfOS_r9gm6IDBGcyZ929.ZgUiufRZwTPzvjHA?startTime=1638929199000

https://zoom.us/rec/share/trMp1skIckvuRm_YzhPVraYXnutpoD6OHAPYGpXKg0-NaU960-RANQ0vpyU69sd9.KpxB5iw5OFA7VYV9?startTime=1638885823000

11/18/21

Lab Status

  • NJ Lab
    • Clock in progress
    • IXR pending Cable

"F" Release

  • SMO - INF Integration
    • Might look at CU for Deployment Option
    • VM Server needs have the ConfD Server installed
  • APP Packaging
    • VMWare is interested in SMO Contribution using CRD packaging proposal
      • Need
  • O1 PM CR Status
    • Rationale presented to O1 Focus Group
    • 3GPP PM Streaming supports GPB, O1 does not, CR Submitted for next meeting 11/29.
    • Will break down the CR into smaller chunks that can be independently addressed.
      • Decouple Stream Consumer and Job Manager from using common index to map value to measurename
      • Subscription Enhancements, Decouple Job from Reporting
      • Use Stream Report as Event Report in REST/JSON mechanism

https://zoom.us/rec/share/2Ggm5GJQJWvDzrA3-vxlYvrsCaO0cLu8Tx4vu-FFlUmElUGOdizEZjI7yklmSjiM.hyT66734IjysF-AF?startTime=1637244292000
11/4/21

Lab Status

  • NJ- David IXR received, PTP-GM still an issue.
  • CA - James (Software Centric)
  • TU - Working with James

"E" Release Status

  • RICAPP
  • RIC
  • ODU-H/ODU-L?
  • OAM - Alex Stancu Model Complete
  • SIM - Alex Stancu Updating Simulator
  • SMO - Mahesh Jethanandani Disaggregated VES Commited, DMaaP Adapter out for review
  • NONRTRIC - Need to reach out to John Keeney for Status
    • Issues around the events and actions not being available yet.
    • Concern on testing/availability of SMO's new Kafka->DMaaP -API-adapter.
  • INF

"F" Release Planning

  • Per Project Release OTF Demo
    • RICAPP
    • RIC
    • ODU-H/ODU-L?
    • OAM
    • SIM
    • SMO
    • NONRTRIC
    • INF

O1 CR Status

  • Rationale presented in O1 and RSAC.

https://zoom.us/rec/share/uJ0gCsx7KSwubqW1DwcNG5xaldeiVzlXq05ejDHpFOPS9Qr7cOMNHmCewRrgTFfL.YCOUwMAxH2e89Kt4?startTime=1636031158000
10/26/21

NJ OSC Lab

  • Waiting on IXR to be received
  • Long cable will be shipped separate
  • Ken will check to see if Block House installation of PTP-GM will be too far, estimating to be 100M from the lab.
  • David Kinseyto send Lab editable diagram to Bimo.

Taiwan OSC Lab

  • Nov 10 working with Viavi for SW License
  • Integrate near-RT RIC/ODU-H: Complete
  • Still working on RU Simulator planning for EOY
  • Still having troubles logging into the TM500 in NJ

ODU-H

Integration Testing

  • new PTL James Li

https://zoom.us/rec/share/chDfuoamAypa3jsfZ47eY47d4vfmHW-xCufLciPhEoFVDj-pMEWqCuDK0Gto7eyu.OV6a-kYkwr7vHm7F?startTime=1635296571000
10/21/21

Release "E" Slice Reporting

  • Extension of VES Measurement Domain. Will be StdDefined in "F" Release
    • Started work on "F" JSON; more is still needed
  • Config still not baselined, critical for rAPP work
    • Martin will finalize HelloWorld to work for us
    • ODU-H is good with this

Not available
10/12/21

CR Status

  • On Track for First Nov O1 Meeting

Lab Status

  • Viavi "Demo" Equipment
  • IXR
  • PTP-GM

Slice Use 




10/7/21

CR Status

  • Alex provided link to GNMI Flow for incorporation into CR

Integration Status

  • Interfaces are not defined for the closed loop Use Case
    • Need PM interface between O-DU-HIGH→SMO
      • We have a non-3GPP Plan, using VES Measurement Domain
    • Need PM Interface between SMO→ rAPP
      • TopicName: MeasurementEvent (4 Values)
    • Need CM Interface between rAPP → OAM
      • Driven by YANG of O-DU-HIGH (RESTCONF)
    • Need CM Interface between OAM → O-DU-HIGH
      • Driven by YANG of O-DU (In Discussion)
      • Believe we can use 3GPP in build and reference forge path  but cannot tag the replicated file used for the build for the Release in order to preserve 3GPP Copyright.

3GPP

  • OAM/SIM will work on Best Practice for using 3GPP (forge) documents in builds/documentation without publishing as part of the release.
gNMI Interaction Diagram: gNMI - OAM - Confluence (o-ran-sc.org) Recording not available.
9/28/21

Lab Status

  • Still waiting on IXR
  • Haven't resolved the plan for the PTP-GM

Slicing Use Case

  • Will have 2 rRMPolicyMemberList (MCC MNC SD SST)
    • 1 Best Effort, Slice 1 Managed Slice
    • MCC/MNC (aka PLMN) should be same as known by Core
  • Will use rRMPolicyDedicatedRatio for Managed slice
  • PM is Average DL/UL UE Thoughtput
    • Collection Interval same as Reporting Interval
    • Reporting Interval will be every 60s
    • One counter for each (UL/DL) (Uint32, kbits/sec)
      • DRB.UEThpDI.SNSSAI
      • DRB.UEThpUI.SNSSAI
    • SLA for the Managed slice is a throughput of 1Mb/s
    • Initial Managed slice has PRBs with a 40% reserved/quota
    • The rAPP should have a configuration value for enabling and disabling the control loop to allow the test controller to identify when the SUT has a stable traffic load.
    • When throughput drops below the 1MB/s SLA by 10% (900Kb/s) then the rAPP increases the reserved/quota by 10%
    • When throughput goes above the SLA of 1MB/S by 10% (1.1MB/s)  then the rAPP decreases the reserved/quota by 10%; this cannot go below the baseline slice reservation (40%)

https://zoom.us/rec/share/1VPBXmcIYIsUKBH6e5SPLt8tpcgjcYhcKY5JxpjIKa-PDabP8mClrchmHasNbyNT.9R_YDUGFmdXvZzpZ?startTime=1632877353000

9/9/21

9AM EDT

VES Improvements

  • Disaggregation Tabled for now
  • Kafka Backend to Influx/Elastic-Search/DMaaP
  • Streaming PM (Should be an "F" Release Target)
    • VES/JSON (Requires O1 CR) (AT&T)
    • HV-VES Websocket/GPB (Requires O1 CR) (DELL

Scorecard

  • Specification Compliance Scorecard
    • Element Maturity (Behavioral Compliance)
      • PTL to self report to Scorecard ("E")
    • Interface (Specification) Compliance
      • OTF (INT) is looking at the FH Test Specification for M-Plane ("E")
      • OTF for Element which would apply the applicable Interfaces required by the NF (OCU-CP, OCU-CP, ODU, NearRT RIC)
      • PTL Self Report ("E")
      • OTF Auto Report ("F")


https://wiki.o-ran-sc.org/download/attachments/35881444/VES-Collector-Flow-Diagram-V6.pptx?api=v2https://zoom.us/rec/share/ggg96yruOV5QYeqXhm_KLok2BvgF-LYG9u_HqAfYTiTmGOw0McgXG1vgtuGgu3yw.GKsYNbN9T7L3c4mQ?startTime=1631192770000

8/12/21

9 AM EDT

Reviewed Slicing End-to-End call flows presented by user-30c9d. Need verification from Viavi on pre-configuration of Slices within Core and UE simulator to request admission to a Slice.

Reviewed VES Project to EPIC list presented by David Kinsey, need to work on iteration and resource mapping. Need OAM, SMO, and SIM PTLs

Discussed PTP Grand Master availability in the lab. David Kinsey to reach out to Nokia for status on FHG and how it provides/interfaces to PTP. E-mail sent today.

Discussed using format of ODU-HIGH Release "E" plan to formulate a release plan with one for each project. David Kinseyto send that. E-Mail sent with proposed template. This would replace the single 9MB growing powerpoint with a per-release plan.


https://zoom.us/rec/share/DfNh8uXm-Y4dEu28INBRqBNGpQtOum2wbveezeDBax9AkhoqflbNoetP6z7dpp2R.Q9ENxTOcereld7YM?startTime=1628773650000

7/22/21

9 AM EDT

Meeting Held for discussion on Release "E" Disaggregated VES


Reviewed proposal and discussed options. No Conclusions yet as this was more informatory. Next Meeting will try to work on specific deliverables by project.

The attached presentation includes comments and on-going work between David Kinsey and Martin Skorupski which will be reviewed with the larger team at the next RSAC call.

View file
nameDisaggregated VES - OSC Release E.pptx
height250

https://zoom.us/rec/share/ENNFTIViSpkG6rBCzF-myIbR2i9WPzje9v7dBL0fGAI2ZM0uveyHqqBP0SkLGa3s.GQS0sL3rPgPErPsc?startTime=1626959214000

4/13/21 

9 PM EST

Discussed 5G super blueprint for E release

DU - RU message interaction blockers

TM500 equipment preparation by Viavi for delivery to OSC lab NJ


Meeting recording: https://zoom.us/rec/share/DuzSNJy8-iAE-ll5JAh-GR4LEgHH4N3_J6on5A3p2O0TqShiW4Lfp5v1WwZhRRmk.O1sBLrdw6K86qN-E

4/8/2021

Meeting recording to be listed to the right once it is available.

Went through Release "D" Flow:



3/11/21

9am EST

Meeting recording listed to the right.

Went through Release "D" Control Loop:

  • Alignment of DMaaP Topics across projects
  • Confirmed proposed YANG for O-DU is being analyzed by the O-DU team, should have an answer by next weeks call.
  • Confirmed Config was sent to O-RU team, ODU Team needs to know how to initiate pairwise testing
  • Reaching out to contributors for E2SIM modifications for Traffic Steering Use case
  • David Kinseywill Reach out to OTF team for OTF E2SIM integration at the same time
  • David Kinsey will work with user-59b16 to work with Taiwan University to see how best to use them for Integration Project. They likely will not have a FHG in their environment and therefore are missing O-DU functionality for Hybrid or Hierarchical support models to the O-RU.
  • SMO discussion was deferred as Mahesh had another meeting commitment. Nothing major pending.



View file
nameplayback.m3u
height150

3/1/21

9 PM EST

user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions

Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation



Meeting recording https://zoom.us/rec/share/B4mbnreNFgtNSndiu54gVkpx_C-89rO5ofRQ8hAbSjSx8jEOdAUrbaKVD1n2wJA3.Hdvyxfpw6i0lj6To

2/25/21

9 AM EST

Discussed RU failure recover use case

Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup

Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup

Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup 

user-165cfto check steps 12-23 in 3. ODU Startup – implementation task



Meeting recording

https://zoom.us/rec/share/Fw56lJ-t3FnHqBqrc-fWVcNfTq4BvLClnNO69jV3FFVAxMN9mcgelDCaOR_LT5sR.69SVCt37YleQy-8N

1/14/21

9 AM EST

Discussed RU failure and recovery use case (ppt attached)

user-59b16 to create call flow for use case

View file
nameRU_failure_recovery_use_case.pptx
height250

Meeting Recording

https://zoom.us/rec/share/mKYOGkB3mgpvIo2Hx1eY5Oifyw9qV9NQd7NiEj-FxQKP0kUpWOc7yvMO_LLPhA_M.lmx2LCh7-QwDHAFi

11/19

9 AM EST

Discussed O1/A1 use case for Dawn



Meeting Recording

https://zoom.us/rec/share/VFSBeQa7lt1AlmAR3VIm4Sc8ooVaIOeMNiVbBKcB3MUOj3OCmK1hMozwT8PjFfpo.ATGZ99NFppAp5jbo Passcode: 5aKgaDF=

9/15

9 PM EST

Intel servers configured in OSC lab for O-DU testing

Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help

Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source)

Ron Shacham to provide simulated trace files to Alex Stancu  from Viavi sim into SIM repo  

user-59b16 David Kinsey to draft preliminary plan for D release;  

Requesting All PTLs to start thinking about D release work epics and Cherry flow over items




Meeting Recording: 

https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb 

9/1

9 PM EST

  • Discussion about OSC lab setup and timelines for testing and integration


    Week starting

    Sept 7 – Configure Intel servers and install OS (windriver, server 1)

    Sept 14 – O-DU Low software installation and unit testing with stub RU simulator (server 1)

    Sept 21 – O-DU High software installation and unit testing with stub CU simulator (server 1)

    Sept 21 – Viavi O-RU emulator, O-CU emulator, EPC installation on (Server 2)

    Sept 28 –  O-CU software installation and unit testing (Server 2)

    Oct 5 – O-DU high and O-CU unit testing

    Oct 19 – UE attachment and HO test

    Oct 26 – UE attachment and HO test


    The OSC lab server addresses are

    Server 1

    Management IP 192.168.4.29

    Interface 1 192.168.41.190


    Server 2

    Management IP 192.168.4.30

    Interface1 192.168.41.191



8/18

9 PM EST

  • Discussion regarding O-CU MVP requirements for OSC
    • Implement HO for traffic steering, defer E1 interface for Cherry
    • Ganesh Shenbagaraman to raise topic to TOC for 8/19
  • Discussion regarding OSC and TIFG MVP requirements 


TIFG-OSC meeting slides

View file
nameTIFG-2020.08.18-TIFG-I-Joint meeting with OSC RSAC on MVP Blueprints v1.0 Ex (002).pptx
height150

Meeting Recording:
https://zoom.us/rec/share/3NIlIoHd5nlIQoWX90_TX6A-T4XLaaa8gXca_qdbxElpW9nzSwAkkYnIq3rVWIHt

Access Password: zYN&Hv3s

7/28

9 PM EST

  • Discussion with Radisys on O-DU activity
  • INF project installing OS and O-DU getting installed. Ganesh Shenbagaraman Sachin Srivastavato provide quick update on O-DU status
  • Discussed about SMO project initiation and PTL election
  • Discussed main challenges slide in OSC to be presented to EC by John Murray   Jinri Huang

    Start Time : Jul 28, 2020 09:03 PM

O-DU High status (PPT attached)

View file
nameODU High Status_29Jul.pptx
height150

7/16/2020

9 AM EDT

  • O-DU and O-RU stub testing (Bronze maint.) (Zhimin Yuan , user-d3360 ); Have access to the box, waiting for Windriver to complete SW install before their SW can be installed
  • KPIMON xAPP integration with Near-RT RIC (Matti Hiltunen , Ron ShachamENGWEI KOO )
    • Working with Samsung and Near-RT RIC, problem with Subscription Mgr
    • E2SIM has Viavi Schema and has demonstrated flow, waiting on 10 minute playback file from Viavi.
    • Viavi indicates file wont be available until 7/24. Could work and lower risk with shorter file, Viavi will look into that.
  • Cherry SMO Proposal (Martin Skorupski , Tracy Van Brakle )
    • Proposal presented
    • Discussion on external SMO open source alignment (John Keeney )
    • Discussed possibility of sub-project instead of new project (John Keeney )
  • SMO LCM and Application Deploy Scenarios (Martin Skorupski )
    • LInk to recorded presentation available on OAM project meeting page. Separate link to also be added to Non-RT RIC page.


    • Start Time : Jul 21, 2020 08:50 AM




Meeting Recording:
https://zoom.us/rec/share/ou4lNK3RzDxJQ7f1s0bPZpMeF53Ueaa8hndK_qYOykxKEdi7dj46TU6b_Mxlyk-N

Access Password: y$SNs?w7

6/18

Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.)

Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver 

user-59b16 user-d3360 to check on OSC lab status for L1 stack  by 6/30

ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30

ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high 


View file
nameCopy of OSC_RSAC_IOT_Profiles_Jun.15_C_Rel_update.xlsx
height150

Common IOT profile 


5/26

INF project cherry epics

  • HA in O-Cloud - 2 server deployment scenario duplex


    Start Time : May 26, 2020 09:01 PM



5/12/2020 9 PM EDT

Topic: Cherry release planning
Start Time : May 12, 2020 09:00 PM

RSAC requesting PTLs to start suggesting EPICS for Cherry


Meeting Recording:
https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC

4/28/2020

9 PM EDT



Meeting Recording: rsac-20200428.mp4

4/9/2020 

9 am EDT

ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering 

Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH

Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU

Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement


Meeting Recording:
https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_

3/26/2020

9 am EDT

Viavi's short term and long term proposal for OSC  

View file
nameVIAVI ORAN OSC Proposed Test Setups 2020Mar C Ex.pdf
height250


Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E

3/10/2020

9 pm EDT

Bronze rel. – PTL reports from ODU LOW, INT



Recording: https://zoom.us/rec/share/4OFfdZDh-FJLeInJslP2Zq94RJy9eaa803UdqfVYyS1yYKZBLNg2trHEvI1-dNQ?startTime=1583888670000

3/3/2020,

9 am EST

Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH


O-CU

View file
nameO-CU project progress 20200218.pptx
height250


Recording: https://zoom.us/rec/share/3-Z5A7P6xD1LWY3A-WfueZU7F4Haeaa80XcZr_UJz4r4zGY2XeS31gnPK9QG9tA?startTime=1583287601000 
2/19/2020, 11pm EST

Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides - 

View file
nameVIAVI ORAN OSC High Level Overview 2020Feb01E Ex.pdf
height250

Action: Discuss in OSC TOC meeting regarding Viavi 



1/7/2020, 9pm

Bronze release documents

Epics spreadsheet: RSAC_Bronze_release_planning.xlsx

Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc

Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx


Recording: https://zoom.us/rec/share/_OxuJb3Z8mdOSa_xwR_UQoIzMrTmaaa8h3Ie_KUMzRvkdqfAxahEtx8_Z-VE0OmU?startTime=1578448750000
9/26/19, 9am

OSC and WG review meeting 1

View file
nameDOC status report update.pptx
height250
View file
nameInfra Status Update.mh (002).pptx
height250
View file
nameIntegration Status Update.pptx
height250
View file
nameNear-RT RIC Status Update.pptx
height250
View file
nameNear-RT RIC xApps Status Update.pptx
height250
View file
nameNon-RT RIC Status Update.pptx
height250
View file
nameOAM Status Update.pptx
height250
View file
nameODUHIGH Status Update.pptx
height250
View file
nameODULOW Status Update.pptx
height250
View file
nameOSC_WG_review.pptx
height250
View file
nameSIM-Status-Update.pptx
height250




WG review meeting 1 recording
8-1-19, 9 am

Reviewed Epics

Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc?

Move Release planning cadence to once a week. Alternate between evening and day every other week.

Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray

  • Tlab (AT&T)
  • OTIC (O-RAN Test and Integration Centre - Asia/Europe/North America (inter-connected)
  • Windriver lab ?
  • CMCC ?


7-30-19, 9 pm

Reviewed epics

  • INT-A-F212 clarification added in annex for PNF registration
  • RICNRT-A-F10 for OSC  Rel A ?
  • INF-A-F01 epic clarification needed from Paul Carver
  • INT-A-F013 - recruit Eliza Celenti to stand up OTF framework for Rel A
  • RICAPP-A-F110 - UE Monitor for slicing
    • Jun Hyuk Song to provide clarification of this epic, UE-NIB, overlap with UE Manager xApp
O-RAN SC Ver A SW Requirements 20190730a.docx
6-4-19, 9 pm Eastern

Reviewed and addressed comments

  • Created epics for different project groups
 O-RAN SC Ver A SW Requirements 20190604a.docx

...