Date/TimeCommentsDocRecording
6-4-19, 9 pm Eastern

Reviewed and addressed comments

  • Created epics for different project groups
 O-RAN SC Ver A SW Requirements 20190604a.docx
7-30-19, 9 pm

Reviewed epics

  • INT-A-F212 clarification added in annex for PNF registration
  • RICNRT-A-F10 for OSC  Rel A ?
  • INF-A-F01 epic clarification needed from Paul Carver
  • INT-A-F013 - recruit Eliza Celenti to stand up OTF framework for Rel A
  • RICAPP-A-F110 - UE Monitor for slicing
    • Jun Hyuk Song to provide clarification of this epic, UE-NIB, overlap with UE Manager xApp
O-RAN SC Ver A SW Requirements 20190730a.docx
8-1-19, 9 am

Reviewed Epics

Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc?

Move Release planning cadence to once a week. Alternate between evening and day every other week.

Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray

  • Tlab (AT&T)
  • OTIC (O-RAN Test and Integration Centre - Asia/Europe/North America (inter-connected)
  • Windriver lab ?
  • CMCC ?


9/26/19, 9am

OSC and WG review meeting 1

View file
nameDOC status report update.pptx
height250
View file
nameInfra Status Update.mh (002).pptx
height250
View file
nameIntegration Status Update.pptx
height250
View file
nameNear-RT RIC Status Update.pptx
height250
View file
nameNear-RT RIC xApps Status Update.pptx
height250
View file
nameNon-RT RIC Status Update.pptx
height250
View file
nameOAM Status Update.pptx
height250
View file
nameODUHIGH Status Update.pptx
height250
View file
nameODULOW Status Update.pptx
height250
View file
nameOSC_WG_review.pptx
height250
View file
nameSIM-Status-Update.pptx
height250




WG review meeting 1 recording
1/7/2020, 9pm

Recording: https://zoom.us/rec/share/_OxuJb3Z8mdOSa_xwR_UQoIzMrTmaaa8h3Ie_KUMzRvkdqfAxahEtx8_Z-VE0OmU?startTime=1578448750000

Bronze release documents

Epics spreadsheet: RSAC_Bronze_release_planning.xlsx

Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc

Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx



2/17/2020, 11pm EST

Discussed Bronze at a glance updates from each OSC project. Slides - 

View file
nameOSC_Bronze_2_17_20.pptx
height250

Recording: https://zoom.com.cn/rec/share/y-5fF-rq-iBJYLfoyx6CS6gtMt_beaa82nQe_aFfzhmqSgBfY2bDWzQ6NNFNWim9




2/19/2020, 11pm EST

Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides - 

View file
nameVIAVI ORAN OSC High Level Overview 2020Feb01E Ex.pdf
height250

Action: Discuss in OSC TOC meeting regarding Viavi 



3/3/2020,

9 am EST

Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH

Recording: https://zoom.us/rec/share/3-Z5A7P6xD1LWY3A-WfueZU7F4Haeaa80XcZr_UJz4r4zGY2XeS31gnPK9QG9tA?startTime=1583287601000 

O-CU

View file
nameO-CU project progress 20200218.pptx
height250



3/10/2020

9 pm EDT

Bronze rel. – PTL reports from ODU LOW, INT

Recording: https://zoom.us/rec/share/4OFfdZDh-FJLeInJslP2Zq94RJy9eaa803UdqfVYyS1yYKZBLNg2trHEvI1-dNQ?startTime=1583888670000



3/26/2020

9 am EDT

Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E

Viavi's short term and long term proposal for OSC  

View file
nameVIAVI ORAN OSC Proposed Test Setups 2020Mar C Ex.pdf
height250



4/9/2020 

9 am EDT

Meeting Recording:
https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_

ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering 

Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH

Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU

Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement



4/28/2020

9 PM EDT

Meeting Recording: rsac-20200428.mp4



5/12/2020 9 PM EDT

Topic: Cherry release planning
Start Time : May 12, 2020 09:00 PM

Meeting Recording:
https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC

RSAC requesting PTLs to start suggesting EPICS for Cherry




5/26

INF project cherry epics



6/18

Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.)

Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver 

user-59b16 user-d3360 to check on OSC lab status for L1 stack  by 6/30

ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30

ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high 


View file
nameCopy of OSC_RSAC_IOT_Profiles_Jun.15_C_Rel_update.xlsx
height150

Common IOT profile 


7/16/2020

9 AM EDT

  • O-DU and O-RU stub testing (Bronze maint.) (Zhimin Yuan , user-d3360 ); Have access to the box, waiting for Windriver to complete SW install before their SW can be installed
  • KPIMON xAPP integration with Near-RT RIC (Matti Hiltunen , Ron ShachamENGWEI KOO )
    • Working with Samsung and Near-RT RIC, problem with Subscription Mgr
    • E2SIM has Viavi Schema and has demonstrated flow, waiting on 10 minute playback file from Viavi.
    • Viavi indicates file wont be available until 7/24. Could work and lower risk with shorter file, Viavi will look into that.
  • Cherry SMO Proposal (Martin Skorupski , Tracy Van Brakle )
    • Proposal presented
    • Discussion on external SMO open source alignment (John Keeney )
    • Discussed possibility of sub-project instead of new project (John Keeney )
  • SMO LCM and Application Deploy Scenarios (Martin Skorupski )


7/28

9 PM EST

O-DU High status (PPT attached)

View file
nameODU High Status_29Jul.pptx
height150


8/18

9 PM EST

  • Discussion regarding O-CU MVP requirements for OSC
    • Implement HO for traffic steering, defer E1 interface for Cherry
    • Ganesh Shenbagaraman to raise topic to TOC for 8/19
  • Discussion regarding OSC and TIFG MVP requirements 

Meeting Recording:
https://zoom.us/rec/share/3NIlIoHd5nlIQoWX90_TX6A-T4XLaaa8gXca_qdbxElpW9nzSwAkkYnIq3rVWIHt

Access Password: zYN&Hv3s

TIFG-OSC meeting slides

View file
nameTIFG-2020.08.18-TIFG-I-Joint meeting with OSC RSAC on MVP Blueprints v1.0 Ex (002).pptx
height150


9/1

9 PM EST

  • Discussion about OSC lab setup and timelines for testing and integration


    Week starting

    Sept 7 – Configure Intel servers and install OS (windriver, server 1)

    Sept 14 – O-DU Low software installation and unit testing with stub RU simulator (server 1)

    Sept 21 – O-DU High software installation and unit testing with stub CU simulator (server 1)

    Sept 21 – Viavi O-RU emulator, O-CU emulator, EPC installation on (Server 2)

    Sept 28 –  O-CU software installation and unit testing (Server 2)

    Oct 5 – O-DU high and O-CU unit testing

    Oct 19 – UE attachment and HO test

    Oct 26 – UE attachment and HO test


    The OSC lab server addresses are

    Server 1

    Management IP 192.168.4.29

    Interface 1 192.168.41.190


    Server 2

    Management IP 192.168.4.30

    Interface1 192.168.41.191



9/15

9 PM EST

Intel servers configured in OSC lab for O-DU testing

Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help

Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source)

Ron Shacham to provide simulated trace files to Alex Stancu  from Viavi sim into SIM repo  

user-59b16 David Kinsey to draft preliminary plan for D release;  

Requesting All PTLs to start thinking about D release work epics and Cherry flow over items


Meeting Recording: 

https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb 



10/13

9 PM EST

Meeting Recording

https://zoom.us/rec/share/H6b2727deGhaKnuwuNHs4MF7i3Zao3y-gqMeY_WCYRj6WLI8Q6MzZjhjMJXyKLuU.H8QvANEkzqHlJ6R6 (Access Passcode: h&k2htXH)

Martin Skorupski to perform code review for O1 requested by user-165cf

Zhimin Yuan user-165cf to set up debugging session for pairwise O-DU low O-DU high testing

user-59b16 , Rich Wright to check if P3000 card in O-DU low server (192.168.50.190) is connected correctly in OSC lab




11/19

9 AM EST



1/14/21

9 AM EST

Meeting Recording

https://zoom.us/rec/share/mKYOGkB3mgpvIo2Hx1eY5Oifyw9qV9NQd7NiEj-FxQKP0kUpWOc7yvMO_LLPhA_M.lmx2LCh7-QwDHAFi

Discussed RU failure and recovery use case (ppt attached)

user-59b16 to create call flow for use case

View file
nameRU_failure_recovery_use_case.pptx
height250


2/25/21

9 AM EST

Meeting recording

https://zoom.us/rec/share/Fw56lJ-t3FnHqBqrc-fWVcNfTq4BvLClnNO69jV3FFVAxMN9mcgelDCaOR_LT5sR.69SVCt37YleQy-8N

Discussed RU failure recover use case

Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup

Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup

Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup 

user-165cfto check steps 12-23 in 3. ODU Startup – implementation task




3/1/21

9 PM EST

Meeting recording https://zoom.us/rec/share/B4mbnreNFgtNSndiu54gVkpx_C-89rO5ofRQ8hAbSjSx8jEOdAUrbaKVD1n2wJA3.Hdvyxfpw6i0lj6To

user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions

Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation