Date/TimeCommentsDocRecording
6-4-19, 9 pm Eastern

Reviewed and addressed comments

  • Created epics for different project groups
 O-RAN SC Ver A SW Requirements 20190604a.docx
7-30-19, 9 pm

Reviewed epics

  • INT-A-F212 clarification added in annex for PNF registration
  • RICNRT-A-F10 for OSC  Rel A ?
  • INF-A-F01 epic clarification needed from Paul Carver
  • INT-A-F013 - recruit Eliza Celenti to stand up OTF framework for Rel A
  • RICAPP-A-F110 - UE Monitor for slicing
    • Jun Hyuk Song to provide clarification of this epic, UE-NIB, overlap with UE Manager xApp
O-RAN SC Ver A SW Requirements 20190730a.docx
8-1-19, 9 am

Reviewed Epics

Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc?

Move Release planning cadence to once a week. Alternate between evening and day every other week.

Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray

  • Tlab (AT&T)
  • OTIC (O-RAN Test and Integration Centre - Asia/Europe/North America (inter-connected)
  • Windriver lab ?
  • CMCC ?


9/26/19, 9am

OSC and WG review meeting 1

View file
nameDOC status report update.pptx
height250
View file
nameInfra Status Update.mh (002).pptx
height250
View file
nameIntegration Status Update.pptx
height250
View file
nameNear-RT RIC Status Update.pptx
height250
View file
nameNear-RT RIC xApps Status Update.pptx
height250
View file
nameNon-RT RIC Status Update.pptx
height250
View file
nameOAM Status Update.pptx
height250
View file
nameODUHIGH Status Update.pptx
height250
View file
nameODULOW Status Update.pptx
height250
View file
nameOSC_WG_review.pptx
height250
View file
nameSIM-Status-Update.pptx
height250




WG review meeting 1 recording
1/7/2020, 9pm

Recording: https://zoom.us/rec/share/_OxuJb3Z8mdOSa_xwR_UQoIzMrTmaaa8h3Ie_KUMzRvkdqfAxahEtx8_Z-VE0OmU?startTime=1578448750000

Bronze release documents

Epics spreadsheet: RSAC_Bronze_release_planning.xlsx

Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc

Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx



2/17/2020, 11pm EST

Discussed Bronze at a glance updates from each OSC project. Slides - 

View file
nameOSC_Bronze_2_17_20.pptx
height250

Recording: https://zoom.com.cn/rec/share/y-5fF-rq-iBJYLfoyx6CS6gtMt_beaa82nQe_aFfzhmqSgBfY2bDWzQ6NNFNWim9




2/19/2020, 11pm EST

Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides - 

View file
nameVIAVI ORAN OSC High Level Overview 2020Feb01E Ex.pdf
height250

Action: Discuss in OSC TOC meeting regarding Viavi 



3/3/2020,

9 am EST

Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH

Recording: https://zoom.us/rec/share/3-Z5A7P6xD1LWY3A-WfueZU7F4Haeaa80XcZr_UJz4r4zGY2XeS31gnPK9QG9tA?startTime=1583287601000 

O-CU

View file
nameO-CU project progress 20200218.pptx
height250



3/10/2020

9 pm EDT

Bronze rel. – PTL reports from ODU LOW, INT

Recording: https://zoom.us/rec/share/4OFfdZDh-FJLeInJslP2Zq94RJy9eaa803UdqfVYyS1yYKZBLNg2trHEvI1-dNQ?startTime=1583888670000



3/26/2020

9 am EDT

Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E

Viavi's short term and long term proposal for OSC  

View file
nameVIAVI ORAN OSC Proposed Test Setups 2020Mar C Ex.pdf
height250



4/9/2020 

9 am EDT

Meeting Recording:
https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_

ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering 

Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH

Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU

Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement



4/28/2020

9 PM EDT

Meeting Recording: rsac-20200428.mp4



5/12/2020 9 PM EDT

Topic: Cherry release planning
Start Time : May 12, 2020 09:00 PM

Meeting Recording:
https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC

RSAC requesting PTLs to start suggesting EPICS for Cherry




5/26

INF project cherry epics



6/18

Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.)

Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver 

user-59b16 user-d3360 to check on OSC lab status for L1 stack  by 6/30

ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30

ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high 


View file
nameCopy of OSC_RSAC_IOT_Profiles_Jun.15_C_Rel_update.xlsx
height150

Common IOT profile 


7/16/2020

9 AM EDT

  • O-DU and O-RU stub testing (Bronze maint.) (Zhimin Yuan , user-d3360 ); Have access to the box, waiting for Windriver to complete SW install before their SW can be installed
  • KPIMON xAPP integration with Near-RT RIC (Matti Hiltunen , Ron ShachamENGWEI KOO )
    • Working with Samsung and Near-RT RIC, problem with Subscription Mgr
    • E2SIM has Viavi Schema and has demonstrated flow, waiting on 10 minute playback file from Viavi.
    • Viavi indicates file wont be available until 7/24. Could work and lower risk with shorter file, Viavi will look into that.
  • Cherry SMO Proposal (Martin Skorupski , Tracy Van Brakle )
    • Proposal presented
    • Discussion on external SMO open source alignment (John Keeney )
    • Discussed possibility of sub-project instead of new project (John Keeney )
  • SMO LCM and Application Deploy Scenarios (Martin Skorupski )


7/28

9 PM EST

O-DU High status (PPT attached)

View file
nameODU High Status_29Jul.pptx
height150


8/18

9 PM EST

  • Discussion regarding O-CU MVP requirements for OSC
    • Implement HO for traffic steering, defer E1 interface for Cherry
    • Ganesh Shenbagaraman to raise topic to TOC for 8/19
  • Discussion regarding OSC and TIFG MVP requirements 

Meeting Recording:
https://zoom.us/rec/share/3NIlIoHd5nlIQoWX90_TX6A-T4XLaaa8gXca_qdbxElpW9nzSwAkkYnIq3rVWIHt

Access Password: zYN&Hv3s

TIFG-OSC meeting slides

View file
nameTIFG-2020.08.18-TIFG-I-Joint meeting with OSC RSAC on MVP Blueprints v1.0 Ex (002).pptx
height150


9/1

9 PM EST

  • Discussion about OSC lab setup and timelines for testing and integration


    Week starting

    Sept 7 – Configure Intel servers and install OS (windriver, server 1)

    Sept 14 – O-DU Low software installation and unit testing with stub RU simulator (server 1)

    Sept 21 – O-DU High software installation and unit testing with stub CU simulator (server 1)

    Sept 21 – Viavi O-RU emulator, O-CU emulator, EPC installation on (Server 2)

    Sept 28 –  O-CU software installation and unit testing (Server 2)

    Oct 5 – O-DU high and O-CU unit testing

    Oct 19 – UE attachment and HO test

    Oct 26 – UE attachment and HO test


    The OSC lab server addresses are

    Server 1

    Management IP 192.168.4.29

    Interface 1 192.168.41.190


    Server 2

    Management IP 192.168.4.30

    Interface1 192.168.41.191



9/15

9 PM EST

Intel servers configured in OSC lab for O-DU testing

Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help

Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source)

Ron Shacham to provide simulated trace files to Alex Stancu  from Viavi sim into SIM repo  

user-59b16 David Kinsey to draft preliminary plan for D release;  

Requesting All PTLs to start thinking about D release work epics and Cherry flow over items


Meeting Recording: 

https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb 



10/13

9 PM EST

Meeting Recording

https://zoom.us/rec/share/H6b2727deGhaKnuwuNHs4MF7i3Zao3y-gqMeY_WCYRj6WLI8Q6MzZjhjMJXyKLuU.H8QvANEkzqHlJ6R6 (Access Passcode: h&k2htXH)

Martin Skorupski to perform code review for O1 requested by user-165cf

Zhimin Yuan user-165cf to set up debugging session for pairwise O-DU low O-DU high testing

user-59b16 , Rich Wright to check if P3000 card in O-DU low server (192.168.50.190) is connected correctly in OSC lab




11/19

9 AM EST



1/14/21

9 AM EST

Meeting Recording

https://zoom.us/rec/share/mKYOGkB3mgpvIo2Hx1eY5Oifyw9qV9NQd7NiEj-FxQKP0kUpWOc7yvMO_LLPhA_M.lmx2LCh7-QwDHAFi

Discussed RU failure and recovery use case (ppt attached)

user-59b16 to create call flow for use case

View file
nameRU_failure_recovery_use_case.pptx
height250


2/25/21

9 AM EST

Meeting recording

https://zoom.us/rec/share/Fw56lJ-t3FnHqBqrc-fWVcNfTq4BvLClnNO69jV3FFVAxMN9mcgelDCaOR_LT5sR.69SVCt37YleQy-8N

Discussed RU failure recover use case

Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup

Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup

Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup 

user-165cfto check steps 12-23 in 3. ODU Startup – implementation task




3/1/21

9 PM EST

Meeting recording https://zoom.us/rec/share/B4mbnreNFgtNSndiu54gVkpx_C-89rO5ofRQ8hAbSjSx8jEOdAUrbaKVD1n2wJA3.Hdvyxfpw6i0lj6To

user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions

Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation




3/11/21

9am EST

Meeting recording listed to the right.

Went through Release "D" Control Loop:

  • Alignment of DMaaP Topics across projects
  • Confirmed proposed YANG for O-DU is being analyzed by the O-DU team, should have an answer by next weeks call.
  • Confirmed Config was sent to O-RU team, ODU Team needs to know how to initiate pairwise testing
  • Reaching out to contributors for E2SIM modifications for Traffic Steering Use case
  • David Kinseywill Reach out to OTF team for OTF E2SIM integration at the same time
  • David Kinsey will work with user-59b16 to work with Taiwan University to see how best to use them for Integration Project. They likely will not have a FHG in their environment and therefore are missing O-DU functionality for Hybrid or Hierarchical support models to the O-RU.
  • SMO discussion was deferred as Mahesh had another meeting commitment. Nothing major pending.



View file
nameplayback.m3u
height150

4/8/2021

Meeting recording to be listed to the right once it is available.

Went through Release "D" Flow:



4/13/21 

9 PM EST

Meeting recording: https://zoom.us/rec/share/DuzSNJy8-iAE-ll5JAh-GR4LEgHH4N3_J6on5A3p2O0TqShiW4Lfp5v1WwZhRRmk.O1sBLrdw6K86qN-E

Discussed 5G super blueprint for E release

DU - RU message interaction blockers

TM500 equipment preparation by Viavi for delivery to OSC lab NJ



7/22/21

9 AM EDT

Meeting Held for discussion on Release "E" Disaggregated VES


Reviewed proposal and discussed options. No Conclusions yet as this was more informatory. Next Meeting will try to work on specific deliverables by project.

The attached presentation includes comments and on-going work between David Kinsey and Martin Skorupski which will be reviewed with the larger team at the next RSAC call.

View file
nameDisaggregated VES - OSC Release E.pptx
height250

https://zoom.us/rec/share/ENNFTIViSpkG6rBCzF-myIbR2i9WPzje9v7dBL0fGAI2ZM0uveyHqqBP0SkLGa3s.GQS0sL3rPgPErPsc?startTime=1626959214000