Execution Time Epics and Requirements Implications
General Requirements:
Generate Faults for the following conditions:
...
- Number of requests processed per time interval (???)
TS xApp Requirements:
Will subscribe to A1-P “QoE Based Traffic Steering” policy
...
- Send predicted QoE to the Non-RT RIC via O1 in support of ongoing reinforcement learning.
- Ability to configure the xApp to support a subset of the O-CU-CPs in the Near-RT RIC’s management area.
QP xApp Requirements:
Will receive subscription request for QoE Prediction data and determine the UE Ids (F1-C) Ids for which to provide predictions and the prediction interval desired.
...
The QP xApp must be able to render a predicted UePerf measurement for a single UE within latency time period 99% of the time.
Execution Time Epics and Requirements Implications
General Requirements:
Upon being loaded will declare to the Near-RT RIC Platform what data it consumes and what data it publishes.
TS xApp Requirements:
When loaded, the TS xApp will declare to the Near-RT RIC Platform that it consumes “QoE Based Traffic Steering” Policy, UePerf data, and PredictedQoE data. It produces nothing.
QP xApp Requirements:
When loaded will declare to the Near-RT RIC Platform that it consumes UeRf, UePerf, and CellPerf data. It produces PredictedQoE data.