Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Simulators (SIM)

Primary Goals:

  • Support rapid prototyping by providing simulated interfaces

Cherry Feature Scope:

Jira: Count of Epics, User Stories, Tasks, and Issues:  5 issues

D Feature Scope:

  • Enable "Closed Loop Use Case" demonstration by providing O1 interface Simulators for:
    • O-DU (containing o-du-hello-world YANG model)
    • O-RU (containing O-RAN-RU-FH November 2020 train YANG models)
  • O1 Simulator improvements:
    • "Blank" simulator, which allows dynamically loading any YANG models of interest, for simulating a NETCONF/YANG interface 

Jira: Count of Epics, User Stories, Tasks, and Issues:  5 issues

Status:

  • O-DU O1 Simulator docker image available in Nexus (version 1.3.1) 
  • O-RU O1 Simulator docker image available in Nexus (version 1.3.1)
  • Blank O1 Simulator docker image available in Nexus (version 1.3.1)
Status (07 Oct. 2020): 


Infrastructure (INF)

Primary Goals: 

  • Implement the O-Cloud reference design, provide the real time performance to allow the O-DU and other components running on top of it.
  • Provide interaction capabilities with other components.

D Feature Scope:  

  • Enabe the 2 AIO severs with additional worker nodes deployment scenario
  • Implement the O2 interface as the MVP
  • Major components upgrade

Jira: Count of Epics, User Stories, Tasks, and Issues:

...