Scope

The project aims to provide simulation solutions to all the projects that have such a need.

The project can be split according to the type of interfaces it simulates:

  • A1
  • E1
  • E2
  • F1
  • FH
  • O1

The project structure is flexible and it can be changed according to the needs of the other projects.

Project meetings

Currently, there is a weekly joined meeting with NONNon-RT-RIC on Mondays 14, OAM and ONAP community on Wednesdays 16:00 UTC (9am 10am EST, 10pm 11pm CST):

https://wiki.onap.org/pages/viewpage.action?pageId=24641575

NOTE: During the "Daylight Savings Time" changeover periods (US vs Europe vs Asia) the time of the meetings may fluctuate. Please keep a close eye on the project calendar.

Zoom: https://us02web.zoom.us/j/43621099389069708424?pwd=aGJOZm54eTUxd0FXR0VCU1N0ejBrUT09

Development

Jira

https://jira.o-ran-sc.org/projects/SIM/summary

Gerrit

Open issues in Jira

Jira
serverORAN Jira
columnskey,type,created,updated,due,assignee,status,resolution,summary
maximumIssues20
jqlQueryproject=SIM AND status not in (DONE, RESOLVED, CLOSED)
serverId5ec52304-b77c-3ce7-af6a-112cb13e6008