Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Infrastructure (INF)

Primary Goals: 

  • Implement the O-Cloud reference design, provide the real time performance to allow the O-CU, O-DU and other components running on top of it.
  • Provide interaction capabilities with other components.
  • Provide O2 interface and support integration with SMO.

I release Feature Scope:  

  • Support integration between INF as O-Cloud with other o-ran-sc components.
  • Support deploy ETSI-DMS (tacker) on INF O-Cloud.
  • Extend multi arch support: add support for ARM64 on Debian based OS.
  • Aligned INF O2 implementation to the O-RAN Spec 4.0

I release highlights/accomplishments (  ):

  • Verified the deployment of ETSI-DMS (tacker) on INF O-Cloud.

Jira: Status of Epics, User Stories, Tasks, and Issues:

Update at  

  • EPICs:

Jira
serverORAN Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject = INF AND issuetype = Epic AND fixVersion = "I Release"
serverId5ec52304-b77c-3ce7-af6a-112cb13e6008

  • Stories:

Jira
serverORAN Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues30
jqlQueryproject = INF AND issuetype = Story AND fixVersion = "I Release"
serverId5ec52304-b77c-3ce7-af6a-112cb13e6008

  •  Tasks:

Jira
serverORAN Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject = INF AND issuetype = Task AND fixVersion = "I Release"
serverId5ec52304-b77c-3ce7-af6a-112cb13e6008

  •  Bugs:

Jira
serverORAN Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues30
jqlQueryproject = INF AND issuetype = Bug AND fixVersion = "I Release"
serverId5ec52304-b77c-3ce7-af6a-112cb13e6008

Test status:

Code coverage:

Release Note:

I release source code, images and deployment instructions



Integration and Test (INT)

Primary Goals: 

  1. Establish an E2E call session with OSC components
  2. Build a CI/CD/CT pipeline for better integration and/or interoperability tests

I Feature Scope / Achievements:

  1. Pairwise Tests
  2. Lab interconnection
  3. OSC-OAI interaction/integration

PTL: James Li

I release highlights/accomplishments:

  1. 8 different pairwise test areas are defined, and 6 out of 8 are implemented and executed. Essentially it involves tests against Near RT RIC, Non RT RIC, xApps, OAM, SIM, O-DU-high, AIMLFW, and INF projects on E2/O1/A1 interfaces.
  2. Test automation with POWDER testbed for integration and pairwise tests. Recently also established test accounts on Colosseum and ARA testbeds for OSC community use.
  3. Demonstrated integration result between OSC O-DU with OAI FlexRIC .

I release source code, container images and deployment instructions

Most of the code was committed to the it/test repository.

...

Documentation (DOC)

Primary Goals:  publish I release document

I release Feature Scope: publish I release document

PTL: weichen ni 

I release highlights/accomplishments ():

https://docs.o-ran-sc.org/en/latest/

Release Note:

https://docs.o-ran-sc.org/en/latest/release-notes.html

I release source code, images and deployment instructions

N/A