Updated: 2nd June 2021
JIRA: Epics Status below:
- https://jira.o-ran-sc.org/browse/ODUHIGH-184 - Done
- As an O-DU L2 developer, I want to implement single UE DL data path and bench-marking
- https://jira.o-ran-sc.org/browse/ODUHIGH-185 - Done
- As an O-DU L2 developer, I want to implement single UE UL data path and bench-marking
- https://jira.o-ran-sc.org/browse/ODUHIGH-186 - WIP
- As an O-DU L2 developer, I want to add support for 64QAM modulation scheme in DL
- Basic code changes complete. Testing in progress for data path
- As an O-DU L2 developer, I want to add support for 64QAM modulation scheme in DL
- https://jira.o-ran-sc.org/browse/ODUHIGH-187 - WIP
- As an O-DU L2 developer, I want to add support for 16QAM modulation scheme in UL
- Basic code changes complete. Testing to be done for data path
- As an O-DU L2 developer, I want to add support for 16QAM modulation scheme in UL
- https://jira.o-ran-sc.org/browse/ODUHIGH-264 - WIP
- As an O-DU L2 developer, I want to add support for Mu1
- Code changes at DU APP completed.
- Resource allocation for SSB to msg5 completed
- Code changes for UE registration flow in progress
- Updates to k0, k1, k2 in progress
- As an O-DU L2 developer, I want to add support for Mu1
- https://jira.o-ran-sc.org/browse/ODUHIGH-265 - WIP
- As an O-DU L2 developer, I want to add support for 100 MHz Bandwidth
- Code changes at DU APP completed.
- Resource allocation for SSB to msg5 completed
- Code changes for UE registration flow in progress
- Updates to k0, k1, k2 in progress
- As an O-DU L2 developer, I want to add support for 100 MHz Bandwidth
- https://jira.o-ran-sc.org/browse/ODUHIGH-266 - WIP
- As an O-DU L2 developer, I want to add support for TDD mode
- Code changes at DU APP completed.
- Resource allocation for SSB to msg5 completed
- Code changes for UE registration flow in progress
- Updates to k0, k1, k2 in progress
- As an O-DU L2 developer, I want to add support for TDD mode
- https://jira.o-ran-sc.org/browse/ODUHIGH-299 - WIP
- As an O-DU L2 developer, I want to develop O-DU High Layers to support Closed Loop Automation Use-case
- Yang modules to be supported by O-DU to ensure the end-to-end functionality of the use case "Closed loop" is in progress. Basic configuration is agreed to support CLA use case.
- Internal call flow/message sequence between O-CU and O-DU for cell activation and deactivation is clarified. Call flow updated at
https://wiki.o-ran-sc.org/display/RSAC/Closed+Loop+Automation+Call+Flow+-+O-DU+High+APIs.
- UE delete functionality complete
- Cell delete functionality complete
- Issue with mis-coordination between cell delete and DL RRC message, resolved.
- Code changes for CU Interaction under review
- As an O-DU L2 developer, I want to develop O-DU High Layers to support Closed Loop Automation Use-case
- https://jira.o-ran-sc.org/browse/ODUHIGH-267 - WIP
- As an O-DU L2 developer, I want to integrate O-DU High with O-DU Low in Radio Mode
- SSB transmission successful
- Debugging issue with Sib1 transmission , PDCCH is received but no PDSCH seen at O-DU low.
- Awaiting inputs from Intel
- As an O-DU L2 developer, I want to integrate O-DU High with O-DU Low in Radio Mode
- https://jira.o-ran-sc.org/browse/ODUHIGH-268 - WIP
- As an O-DU L2 developer, I want to integrate O-DU High with O-CU
- Using Radisys commercial CU as a test fixture
- New VM to be configured as per H/W and S/W requirements of Radisys CU
- As an O-DU L2 developer, I want to integrate O-DU High with O-CU
- https://jira.o-ran-sc.org/browse/ODUHIGH-269 - WIP
- As an O-DU L2 developer, I want to support End to End testing scenarios
- Testing of broadcast messages at O-RU emulator set to begin
- Viavi confirmed receiving at O-RU. Needs verification from UE sim.
- As an O-DU L2 developer, I want to support End to End testing scenarios
Updates from HCL:
- https://jira.o-ran-sc.org/browse/ODUHIGH-247 - Done
- As an O-DU L2 developer, I want to Establish Netconf session for O1 interface for CM
- https://jira.o-ran-sc.org/browse/ODUHIGH-297 - Done
- As an O-DU L2 developer, I want to Establish Netconf session for O1 interface for CM
- https://jira.o-ran-sc.org/browse/ODUHIGH-322 - Done
- As an O-DU L2 developer, I want to develop O-DU High Layers to support Closed Loop Automation Use-case
- https://jira.o-ran-sc.org/browse/ODUHIGH-327 - Done
- As an O-DU L2 developer, I want to develop O-DU High Layers to support Closed Loop Automation Use-case
- https://jira.o-ran-sc.org/browse/ODUHIGH-328 - WIP
- As an O-DU L2 developer, I want to develop O-DU High Layers to support Closed Loop Automation Use-case
- Edit-config implementation for o-ran-sc-du-hello-world YANG (admin state changes), is done.
- Integration with O-DU code for cell down and up scenario in progress
- Integration testing with OAM in progress
- As an O-DU L2 developer, I want to develop O-DU High Layers to support Closed Loop Automation Use-case
Dependency/Blockers:
- O1 configuration for day-1 shall need to be completed to start with CLA. However basic configuration e.g. cell state/operational state/admin state shall be supported initially. Use admin state as unlocked to validate the RU link failure.
- Server(VM) configuration (H/W and S/W) to mount Radisys CU as a test fixture.
- Unable to use valgrind with Intel libraries. Debugging must be carried out with Alternate methods.
- SIB1 PDSCH reached L1 but cannot be observed in logs. Awaiting response from Intel.
- Viavi to confirm successful decoding of SSB at UE sim (TM500).
Updated: 26th May 2021
JIRA: Epics Status below:
...