  1. QP: dealing with some issue with tox and image build, HCL: QP-D → QP communication is not working, images of components not available - Matti will check with Felix which versions he is using for e2e testing
  2. KPIMON: Ron working on E2 simulator to generate payloads accepted by KPIMON - traffic steering use case test flow documented Traffic Steering Flows
  3. AD xApp: Test flow documented AD xApp Flows - Integration and Testing - Confluence (o-ran-sc.org), in review stage (Matti/Ron)
  4. HW health check flow to be documented (Matti)
  5. LP xApp: Problems with committing code
  6. HW (Python/go): HW go issue resolved with Nune, python issue with JJB - will reach out to LF
  7. SSP xApp: ?
  8. Bouncer xApp: Matti will have to request the repo. RTT 1sec, E2T to xApp taking almost 1 sec.


2020-12-08

Cherry target: KPIMON, QP-D, QP, TS, HW (C++), AD, MC

Dawn: Cherry + LP, SSP, HW (Python/go), Bouncer in its own repo

Status:

Cherry items:

  • Traffic steering: Ron has succeeded in getting the traffic steering use case working (E2 SIM, nRT RIC platform, KPIMON, TS, QP-D, QP) with small fixes to KPIMON, TS, and QP. Unfortunately the ML-based QP did not make it to the repo in time.
  • Some fixes to KPIMON hoped in Cherry Maintenance (move from direct Redis to SDL).
  • Anomaly Detection: HCL had a meeting with Felix on testing the use case on Monday - result:?

Dawn items:

  • LP xApp (ChinaMobile): CCLA issue delaying commits but development continues
  • HW (Python/go - Samsung): Any issues?
  • SSP (Samsung): Trying to set up a meeting with Jun Song to discuss details for Dawn.
  • Bouncer xApp (HCL): Matti still to request a repo
  • QP: Maybe HCL could take over the QP xApp?
  • AD xApp: What are the Dawn plans?
  • TS xApp: Some kind of pre-spec E2 CONTROL message to E2 SIM and from there to Viavi simulator.
  • Any new use cases: A1-EI, network slicing?