Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Release E planning:
    • HW (python, go, C++):
      • Do they need to use the REST interface for E2 subscription? (dependency on xApp framework work - under discussion)
      • Add new features (python JIRA tickets already there, go to be added).
      • Document now showing in readthedocs - Matti will send email
    • RC:
      • Talks underway about Mavenir contributing a new xApp that implements the E2SM RC CONTROL message for UE handover request
      • The current TS xApp would call the new RC xApp (jnstead of the REST call to the Viavi E2 simulator)
    • LP:
      • Consume data from inFlux (done?) and create a new name space for predictions
      • Implement AI model for video related prediction (VM size got very large)
    • QP/AD:
      • Integrate load prediction with QP ?- let's discuss
      • Integration with Viavi simulator - TBD.
    • Bouncer:
      • Robustness of platform and additional E2 messages
      • Possible use of REST interface for subscription
    • Possible other contributions
      • Geo-location (Viavi) - need to get the final word from Viavi
      • Network slicing: Multiple interested parties but what needs to be implemented still unclear - Matti will reach out to Rittwik
    • Integration (Viavi simulator, KPIMON, AD, QP, LP, TS, RC)
      • Coordinate between Viavi simulator and KPIMON xApp on which metrics and how are communicated using E2SM KPM
      • Need to discuss with E2SM KPM experts on the intended way of communicating signal strength measurements
      • Enhancement of the Anomaly detection and traffic steering use case with potentially geo-location to be determined
  • RICAPP PTL role: Some folks have expressed interest - Matti will find out about the process.
  • Open networking presentation - input

2021-07-06:

Status:

  • OSC lab: Decision - Dawn release will not require integration testing in the OSC lab but let's try and see if we can integrate there for the maintenance release
    • Any remaining access problems? No.
  • Dawn status:
    • All set: Bouncer, TS, MC, HW-go, HW-python, LP (need to very docker image),
    • AD/QP (code checked, branch to be created, image to be created in release)
    • HW-C (image?), KPIMON (no response from Samsung Korea/China teams) - Matti will send email
    • Documentation of the Anomaly detection and traffic steering execution? (osc wiki page) - Sunil will check with Deepanshu
  • Release E planning:
    • Need to coordinate between Viavi simulator and KPIMON xApp on which metrics and how are communicated using E2SM KPM
    • Need to discuss with E2SM KPM experts on the intended way of communicating signal strength measurements
    • Viavi still considering providing a simple open source geo-location xApp
    • Interest on RAN slicing xApp from HCL and academic partners
    • Enhancement of the Anomaly detection and traffic steering use case with load prediction and potentially geo-location to be determined
  • RICAPP PTL role: Anybody interested in taking over?

...