Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

O-DU High

Primary Goals: 

New Feature Development

Feature Verification

End to End Integration Support

  • Support for Multi UE (Connected = 16, Active =4, Per Slot = 1)

  • Only slot based round robin scheduling support for multi UE scheduling
  • Support for Multi Bearer

  • Basic RAN slicing support
  • Support for HARQ
  • End to End Integration Support (TDD and FDD stack validation)
  • Closed Loop Automation Feature Verification

E Feature Scope: 

  • Support for Multi UE (Connected = 16, Active =4, Per Slot = 1)

  • Only slot based round robin scheduling support for multi UE scheduling
  • Support for Multi Bearer

  • Basic RAN slicing support
  • Support for HARQ
  • End to End Integration Support (TDD and FDD stack validation)
  • Closed Loop Automation Feature Verification

Status:

Updated:  15th Sept 2021

JIRA: Epics Status below:

Updates from HCL:

Dependency/Blockers:


D release source code, container images and deployment instructions

Release-Notes — o-du-l2 master documentation (o-ran-sc.org)

...

O-DU Low

Primary Goals:  

—Continue O-DU low and O-DU high pairwise test.

—FAPI P7 massage message integration -> Ongoing

—Continue O-DU Low and O-RU emulator test.

—Further CU plane testing -> Ongoing

—Continue E2E test with UE simulator.

—Support the UE attachment test

—Development activity for Closed Loop Automation use-case

—Support and test for cell stop and restart within O-DU High layers


E Release Feature Scope: 


PTL: @Luis Farias
  • Status

E release source code, container images and deployment instructions

TODO

...