You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

OSC Community Lab in Bedminster, New Jersey (AT&T)

Current Lab Setup:

Proposed Release "E" Lab Setup:

Status:

  • Full compute, storage and networking support.
  • Pair-wire testing happening between OSC subprojects in the first 4 OSC releases.
  • PTP GM and IXR Switch under installation.
  • On going full integration test:
    • NR registration and PDU session establishment with the UE (FDD stack integration and end to end attach/PDU session procedure validation), and
    • Basic close loop RAN slicing for two UE slices in gNB system (manual validation).
  • More details on Lab Access Request, Diagrams, and Resource Trackers in this page.

INT lab under construction in Silicon Valley, California (CMTI)

Current Lab Setup:

Status:

  • Already supporting the testing for RIC platform and xApp.
  • Phased plan: 
    1. Deploy various simulators to meet the end-to-end testing requirements for various OSC modules;
    2. Support integration and interoperability testing to the OSC Community; and
    3. Serve as full capacity OSC Community Lab.
  • Access and resource sharing: not available yet.

OSC lab under construction in Taiwan

Lab Setup Plan:

Status:

  • Initial target to duplicate the OSC Lab in Bedminster, currently waiting for hardware delivery.
  • O-DU already set up and connected to RU Simulator.
  • Non-RT RIC and Near-RT RIC Integration Rel. D built and connected.
  • Access and resource sharing: not available yet.


  • No labels