This page will contain the schedule, agenda, and minutes summary/details for meetings of the O-RAN SC Requirements and Software Architecture Committee.
Weekly Meeting Notes
Date/Time | Comments | Doc | Recording |
---|---|---|---|
9/28/21 | Lab Status
Slicing Use Case
| Pending... | |
9/9/21 9AM EDT | VES Improvements
Scorecard
| https://wiki.o-ran-sc.org/download/attachments/35881444/VES-Collector-Flow-Diagram-V6.pptx?api=v2 | https://zoom.us/rec/share/ggg96yruOV5QYeqXhm_KLok2BvgF-LYG9u_HqAfYTiTmGOw0McgXG1vgtuGgu3yw.GKsYNbN9T7L3c4mQ?startTime=1631192770000 |
8/12/21 9 AM EDT | Reviewed Slicing End-to-End call flows presented by user-30c9d. Need verification from Viavi on pre-configuration of Slices within Core and UE simulator to request admission to a Slice. Reviewed VES Project to EPIC list presented by David Kinsey, need to work on iteration and resource mapping. Need OAM, SMO, and SIM PTLs Discussed PTP Grand Master availability in the lab. David Kinsey to reach out to Nokia for status on FHG and how it provides/interfaces to PTP. E-mail sent today. Discussed using format of ODU-HIGH Release "E" plan to formulate a release plan with one for each project. David Kinseyto send that. E-Mail sent with proposed template. This would replace the single 9MB growing powerpoint with a per-release plan. | https://zoom.us/rec/share/DfNh8uXm-Y4dEu28INBRqBNGpQtOum2wbveezeDBax9AkhoqflbNoetP6z7dpp2R.Q9ENxTOcereld7YM?startTime=1628773650000 | |
7/22/21 9 AM EDT | Meeting Held for discussion on Release "E" Disaggregated VES Reviewed proposal and discussed options. No Conclusions yet as this was more informatory. Next Meeting will try to work on specific deliverables by project. The attached presentation includes comments and on-going work between David Kinsey and Martin Skorupski which will be reviewed with the larger team at the next RSAC call. | https://zoom.us/rec/share/ENNFTIViSpkG6rBCzF-myIbR2i9WPzje9v7dBL0fGAI2ZM0uveyHqqBP0SkLGa3s.GQS0sL3rPgPErPsc?startTime=1626959214000 | |
4/13/21 9 PM EST | Discussed 5G super blueprint for E release DU - RU message interaction blockers TM500 equipment preparation by Viavi for delivery to OSC lab NJ | Meeting recording: https://zoom.us/rec/share/DuzSNJy8-iAE-ll5JAh-GR4LEgHH4N3_J6on5A3p2O0TqShiW4Lfp5v1WwZhRRmk.O1sBLrdw6K86qN-E | |
4/8/2021 | Meeting recording to be listed to the right once it is available. Went through Release "D" Flow:
| ||
3/11/21 9am EST | Meeting recording listed to the right. Went through Release "D" Control Loop:
| ||
3/1/21 9 PM EST | user-165cfto share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation | Meeting recording https://zoom.us/rec/share/B4mbnreNFgtNSndiu54gVkpx_C-89rO5ofRQ8hAbSjSx8jEOdAUrbaKVD1n2wJA3.Hdvyxfpw6i0lj6To | |
2/25/21 9 AM EST | Discussed RU failure recover use case Zhe Huang to provide DHCP and CA server in OSC lab to bootstrap RU startup Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup user-165cfto check steps 12-23 in 3. ODU Startup – implementation task | Meeting recording | |
1/14/21 9 AM EST | Discussed RU failure and recovery use case (ppt attached) user-59b16 to create call flow for use case | Meeting Recording | |
11/19 9 AM EST | Discussed O1/A1 use case for Dawn | Meeting Recording https://zoom.us/rec/share/VFSBeQa7lt1AlmAR3VIm4Sc8ooVaIOeMNiVbBKcB3MUOj3OCmK1hMozwT8PjFfpo.ATGZ99NFppAp5jbo Passcode: 5aKgaDF= | |
9/15 9 PM EST | Intel servers configured in OSC lab for O-DU testing Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; user-165cfto reach out to Rich for help Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source) Ron Shacham to provide simulated trace files to Alex Stancu from Viavi sim into SIM repo user-59b16 David Kinsey to draft preliminary plan for D release; Requesting All PTLs to start thinking about D release work epics and Cherry flow over items | Meeting Recording: https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb | |
9/1 9 PM EST |
| ||
8/18 9 PM EST |
| TIFG-OSC meeting slides | Meeting Recording: Access Password: zYN&Hv3s |
7/28 9 PM EST |
| O-DU High status (PPT attached) |
|
7/16/2020 9 AM EDT |
| Meeting Recording: Access Password: y$SNs?w7 | |
6/18 | Sachin Srivastava Zhimin Yuan to discuss on bronze maintenance release testing (P5 msg exchange, etc.) Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver user-59b16 user-d3360 to check on OSC lab status for L1 stack by 6/30 ENGWEI KOO to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30 ENGWEI KOO to share common config file IOT profile between O-RU, DU-Low and DU-high | Common IOT profile | |
5/26 | INF project cherry epics
| ||
5/12/2020 9 PM EDT | Topic: Cherry release planning RSAC requesting PTLs to start suggesting EPICS for Cherry | Meeting Recording: https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC | |
4/28/2020 9 PM EDT | Meeting Recording: rsac-20200428.mp4 | ||
4/9/2020 9 am EDT | ENGWEI KOO to setup meeting with user-59b16 Ron Shacham to discuss Viavi simulation parameters for traffic steering Sachin Srivastava Ganesh Shenbagaraman to setup meeting with ENGWEI KOO to discuss Viavi testing with O-DU HIGH Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement | Meeting Recording: https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_ | |
3/26/2020 9 am EDT |
Viavi's short term and long term proposal for OSC | Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E | |
3/10/2020 9 pm EDT | Bronze rel. – PTL reports from ODU LOW, INT | Recording: https://zoom.us/rec/share/4OFfdZDh-FJLeInJslP2Zq94RJy9eaa803UdqfVYyS1yYKZBLNg2trHEvI1-dNQ?startTime=1583888670000 | |
3/3/2020, 9 am EST | Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH O-CU | Recording: https://zoom.us/rec/share/3-Z5A7P6xD1LWY3A-WfueZU7F4Haeaa80XcZr_UJz4r4zGY2XeS31gnPK9QG9tA?startTime=1583287601000 | |
2/19/2020, 11pm EST | Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides - Action: Discuss in OSC TOC meeting regarding Viavi | ||
1/7/2020, 9pm | Epics spreadsheet: RSAC_Bronze_release_planning.xlsx Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx | Recording: https://zoom.us/rec/share/_OxuJb3Z8mdOSa_xwR_UQoIzMrTmaaa8h3Ie_KUMzRvkdqfAxahEtx8_Z-VE0OmU?startTime=1578448750000 | |
9/26/19, 9am | OSC and WG review meeting 1 | WG review meeting 1 recording | |
8-1-19, 9 am | Reviewed Epics Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc? Move Release planning cadence to once a week. Alternate between evening and day every other week. Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with John Murray
| ||
7-30-19, 9 pm | Reviewed epics
| O-RAN SC Ver A SW Requirements 20190730a.docx | |
6-4-19, 9 pm Eastern | Reviewed and addressed comments
| O-RAN SC Ver A SW Requirements 20190604a.docx |