Welcome to the D release page for the O-RAN Software community
Near-Real-time RIC X-APPs (RICAPP) |
---|
Primary Goals: Expand the community working on open source xApps for O-RAN SC. Enhance the set of open source xApps in support of the R-SAC use cases (traffic steering, health check, life cycle management) as well new use cases. Update and enhance existing xApps to take advantage of the new features in xApp SDK (implemented by the xApp frameworks in C++, go, and python). |
D release highlights (12-08-20):
|
PTL: Matti Hiltunen |
Jira: Count of Epics, User Stories, Tasks, and Issues: 165 issues |
Status (3-1-21): |
Near-Real-time RAN Intelligent Controller Platform (E2 Interface) (RICPLT) |
---|
Mission: Update to newer O-RAN specs (E2,A1,O2,O1) and related features. Primary Goals: Update to E2APv1.1 (E2 Node configuration transfer in E2 Setup and E2 Configuration Update (even if likely changing again in E2APv2.0) and E2SM OID support in internal E2SM function query interfaces) // support for A1-EI (as per A1APv3.0) // support for O2 as per WG6 use cases // support for RIC-708 O1-CM to xApps // RIC-734 Include time series database into RIC platform (InfluxDB) for usage by xApps // RIC-421 O1 mediator graceful restart with O1 data being persisted over restarts // Concrete alarms from RIC platform (related to message overload): RIC-204, RIC-203 // SDK package, well documented interfaces to be used by xApps via xApp frameworks // Portability SDK (in xApp project) // REST interface for subscription management. 35 Epics planned: link and 11 items as stretch goals: link |
D release highlights (date): to be filled in at end of release (all primary goals hopefully realize) |
PTL: Thoralf Czichy |
Status 2021-03-03: Work started on many items. 31 Epics planned: link and 15 items as stretch goals: link. Start of release snapshot (MS Excel): link For CII compliance (link)we now do some checks every two weeks in the status meeting and have started a Release criteria checklist template that we go through before releasing, Note that we update to E2APv1.1 |
Non-Real-time RIC (A1 Interface) (NONRTRIC) |
---|
Primary Goals:
|
D Feature Scope:
|
PTL: John Keeney |
Jira: Count of Epics ( 20 issues ), User Stories, Tasks, and Issues: 455 issues |
Operation and Maintenance (OAM) |
---|
Primary Goals:
|
D Feature Scope:
|
PTL: Martin Skorupski |
Status: Jira: Count of Epics ( 15 issues ), User Stories, Tasks, and Issues: 166 issues |
Demo of OAM use cases |
O-RAN Central Unit (OCU) |
---|
Primary Goals:
|
Cherry Feature Scope: |
PTL: |
O-DU High |
---|
Primary Goals:
|
D Feature Scope: . 1. Achieve UL and DL data flow using FDD mode on 20 MHz Bandwidth, Numerology = 0 2.Support for static TDD mode with pattern “DDDDDDDSUU” on 100 MHz Bandwidth, Numerology = 1
3.Development activity for Closed Loop Automation use-case
4.Integration
5.End to end testing support (O-RU<->O-DU-LOW<->O-DU-HIGH<->RSYS CU<->Viavi 5G Core ) 6.O1 enhancements - by HCL
|
PTL: Sachin Srivastava |
Jira: Count of Epics ( 11 issues ), User Stories, Tasks, and Issues: |
O-DU Low |
---|
Primary Goals: —Continue O-DU low and O-DU high pairwise test. —FAPI P7 massage integration -> Ongoing —Continue O-DU Low and O-RU emulator test. —Further CU plane testing -> Ongoing —Continue E2E test with UE simulator. —Support the UE attachment test —Development activity for Closed Loop Automation use-case —Support and test for cell stop and restart within O-DU High layers |
D Release Feature Scope: |
PTL: @Zhimin Yuan |
|
Simulators (SIM) |
---|
Primary Goals:
|
Cherry Feature Scope: |
PTL: Alex Stancu |
Jira: Count of Epics, User Stories, Tasks, and Issues: 5 issues |
Status (07 Oct. 2020): |
Infrastructure (INF) |
---|
Primary Goals:
|
D Feature Scope:
|
PTL: Xiaohua Zhang |
Jira: Count of Epics, User Stories, Tasks, and Issues: |
Integration and Test (INT) |
---|
Primary Goals: To support OSC project CI pipeline. To test and validate the components and use cases |
Cherry Feature Scope:
|
PTL: Zhe Huang |
Jira: Count of Epics, User Stories, Tasks, and Issues: 54 issues |
Status (28 Oct. 2020): |
Documentation (DOC) |
---|
Primary Goals: TODO |
Bronze Feature Scope: TODO |
PTL: weichen ni |
Jira: Count of Epics, User Stories, Tasks, and Issues: |
Service Management and Orchestration (SMO) |
---|
Primary Goals: The primary goal of the SMO project is to integrate different software artifacts of existing open-source projects creating a fully functional open-source Service Management and Orchestration (SMO). |
D Feature Scope: |
PTL: Mahesh Jethanandani |
Status: For a detailed workflow and end-to-end test manual of the two parts, refer to Cherry Release Test Plans for SMO. Jira: Count of Epics ( 0 issues ), User Stories, Tasks, and Issues: 6 issues |