Date

Attendees

Goals

  • Assess if E2 Simulator can be enhanced to support Traffic Steering use case

Discussion items

TimeItemWhoNotes
5minE2 Simulator current status@all
  • Current E2 Simulator capabilities:
    •  setup
    • subscription
    • indication
 5minEnhancing E2 Simulator @all 
  •  Before specific enhancements for Traffic Steering use case:
    • WG3 alignment for E2 Simulator
      • Harry estimates 2-3 weeks in his case
      • we need to find another resource to work on this
    • E2 Service Model - need sample message from production for integration in Simulator
10minNew resource needed for E2 Sim development@all
  • We need to define work items for the resource
  • We need to find a new resource to work on the enhancement of E2 Sim
  • The new resource can align with Harry wrt the code and details
10minUE Simulator in OSNL (Berlin lab)@all
  • Viavi UE Simulator (TM500) is present in OSNL
  • Need to check if UE Sim handles RF measurements
  • Assess if flat files can be generated by the UE Sim
  • Generate flat files with RF reports
    • define 7-8 cells
    • define concentration of users - static users in first phase
    • start RAN simulation 
    • generate RF reports
5minE2 Simulator flat file replay@all
  • After flat file with RF reports is available, E2 Simulator will be able to feed the data to the RIC xApps 

Action items

  • @harrytran define work items for new developer  
  • Alex Stancu send out email requesting for a new resource to the O-RAN-SC mailing list  
  • Alex Stancu check with Martin Skorupski the details wrt the Viavi UE Simulator in OSNL