You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Welcome to the Amber release page for the O-RAN Software community          

The press release is planned for Dec 3rd 2019. The code freeze is Nov 30th

This page will contain all the information specific to the Amber release and frozen code and documentation. The main truck will continue on to support future releases.

This release is the first release and is in partnership with the O-RAN Alliance. The specification and software are being worked at the same time and the software is considered pre-specification software.

The projects have limited capabilities which will increase over future releases. Initial release capabilites include:

  • Non-Real-time RIC (A1 Interface)
  • near real-time RIC (X2 Interface)
  • X-APPs
  • OAM (O-1 Interface)
  • Simulators
  • Dashboard (OAM)


Link to press Release (Pending)

Documentation

 https://docs.o-ran-sc.org/en/latest/

Table of Projects



  • No labels