Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Every time: Check rule RC-4 (link) that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
    1. https://gerrit.o-ran-sc.org/r/c/ric-plt/nodeb-rnib/+/7974 ok, protobuf definitions only
    2. https://gerrit.o-ran-sc.org/r/c/ric-plt/e2/+/8037 ok, generated asn.1 encoder/decoder files.
  2. every second time: Review code coverage stats and blocker code smells
    1. We take a look at the two links in the beginning of this page: Code coverage reports..
    2. The list below is only working reports // Anybody volunteering to work with LF on making the code coverage CI to work again (there's still the old JVM version)
    3. We did not do this today.
  3. Every time: Check if there are new bug reports in JIRA: link
    1. RIC-905 new (from PW) Issue in reporting the CLEAR ALARM as VES EVENT
    2. RIC-903 new (from PW) DefaultUser setup fails when authentication is enabled for InfluxDB
    3. RIC-901 new (from PW) BUG FIX IN 'Get ALARM INFO’ NETCONF COMMAND
    4. RIC-897 SCTP connection fails with Viavi // update with workaround
    5. RIC-894 long idle period (days) causes RMR connection breaks // update with more information
    6. RIC-896 xapps sending same msg type and sub id fails - details to be clarified
    7. RIC-890, RIC-891, RIC-892: build of xapp-ccp framework seems to fail.
      1. could be staging repo related (10004) vs release repo (10002) for the base image
    8. RIC-864 xapp-frame-cpp CI does not use Dockerfile and therefore uses Ubuntu18.04 (not 20.04) in build
    9. RIC-857 sporadically RMR takes multiple minutes before being "ready"
    10. RIC-835 → 2021-12-07 news from Viktor
    11. RIC-837 RMR is not forwarding messages from E2T to E2M
    12. RIC-852 Intermittent Issue with E2T: While setting up E2 setup request and response.
      1. 2021-12-21: Trying to get bandwidth for this during F release.
    13. fixed: RIC-895 (routes in routing mgr for service update messages) 
    14. anybody would like to get more familiar with RMR?
  4. Sunil still to discuss with other team members for other items from subteam-h
    1. Other tickets CI/CD and Code coverage tickets? Sunil: I am still looking for the resources to work on that.2022-03-01_
      1. Sangeetha working on RIC-860, done, but code still to be checked in.
      2. Sangeetha working on RIC-878, status see Jira item, code still to be checked in.
      3. O1 testing is also being worked on. 2022-03-29 Sangeetha to raise Jira ticket
      4. Subhash asked for documentation of nanobot from Sunil. almost Almost done. 2022-
      03
      1. 04-
      15: status Sangeetha?
      1. 12: Still open
  5. James: RSAC recommended incorporating OTF in testing (David Kinsey can help)- Thoralf to start mail thread with HCL (sunil, Sangeetha) and David on this plus James.
    1. 2022-01-27 (Mail sent)
    2. 2022-02-15: resending with the right David
    3. 2022-03-01:
      1. workshop to be planned (James in discussion with David)
      2. in last weeks SMO+RSAC meeting this was discussed as well. It would be good to have a test case that just verifies successful deployment of the RIC platform, workshop still to be scheduled.
      3. James ran O-ran profile in powder lab. Seemed to work and deploy Dawn. Working with David Jo. (UoU) to update to E release.
      4. 2022-03-15: James creating a E release profile for powder
    4. 2022-03-15: workshop still to be held (was moved by two weeks (Mar-24))
    5. 2022-03-29: OTF workshop planned for April-7 9am EDT https://lists.o-ran-sc.org/g/discuss/message/487
    6. 2022-04-12
      1. last Thursday RSAC call was used for preparing OTF installation of the three microservices into O-Cloud (WR k8s with O2 IMS/DMS) to avoid firewall issues
      2. actual workshop planned for RSAC on Apr-21 9am EDT.
      3. Taking OTF into use in E release might be only partially done in E release (also discussed in last week's TOC)
  6. Progress on Progress on E2APv2.0?
    1. in ric platform and simulators?
      1. 2022-03-29
        1. AP: Subhash to present he E2AP2.0 slides (15min) from here: E2AP 2.0 Design
        2. Simulator code updated to E2APv2.0: https://gerrit.o-ran-sc.org/r/c/sim/e2-interface/+/7971 (incl. asn1c generated files) config transfer message coming soon
        3. protobuf definitions for configuration components under re-work
        4. /e2-interface/+/7971 (incl. asn1c generated files) config transfer message coming soon
        5. protobuf definitions for configuration components under re-work
        6. E2APv2-0 branches? nodeb-rnib already branched.
      2. 2022-04-12
        1. E2M patch for E2 Setup as per new version (Dhiraj/Arun to review). Octet sequence for config request/repsonse within E2 setup not yet correctly handled
        2. next step is config update message (1-2 weeks)
        3. transaction id handling should be in same patch as wellE2APv2-0 branches? nodeb-rnib already branched.
    2. in xapps? E2APv2.0 update in xApps that use the old RMR to-be-removed xapp subscription interface - Thoralf asking Sunil to coordinate xapp-side adaptation to REST interface - see RIC-375
      1. kpimon
      2. bouncer (working on rest based submgr API if that means HCL is working RIC-641, please inform Alexandre about this.
      3. all hello-world xapps (hw-go already uses submgr REST ifc)
        1. hw-go issue with old xapp frame lib used. - needs to be updated.
      4. update simulators (discuss with Subhash if needed) do we have two simulators we have to update?
        1. done, but not yet open for review.
    3. in DU
      1. 2022-02-23 user-30c9d reported in TOC that this work is done.
  7. RIC-641 Sandeep (HCL) is working on this. Work is progressingHCL) is working on this. Work is progressing.
    1. 2022-04-12: framework changes done. Now integrating with Bouncer xApp. The reviews are coming.
  8. New contribution proposals: Thoralf created JIRA items for the items in c and d and b: Link =https://jira.o-ran-sc.org/issues/?jql=labels%20%3D%20subteam-p
    1. Meeting on E2 Reset scheduled for Apr-13->Apr-20 9:30am IST
    2. Thoralf (near-RT RIC) proposed a new repo ric-plt/stslgo . Details: https://lists.o-ran-sc.org/g/toc/message/674
  9. RICAPP agenda: RICAPP Meetings.

...