H-Release - Highlights:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H Release - Tasks: Count of Epics (20 issues), User Stories, Tasks, and Issues: (455 issues) Relevant Epics:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PTL: John Keeney | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Wiki: https://wiki.o-ran-sc.org/display/RICNR Latest Architecture: Release H Architecture Components: Release H Components Tasks / Backlog / JIRA: https://jira.o-ran-sc.org/projects/NONRTRIC/issues Gerrit / Source Code:
Sonar / Test Coverage Reports
Docs:
Testing: Studies
Weekly Meetings: Demos:
H release: Container images H release: Deployment Instruction |
Near-Real-time RIC X-APPs (RICAPP) |
---|
Primary Goals: Expand the community working on open source xApps for O-RAN SC. Update and maintain the existing xApps to latest releases. Enhance the set of open source xApps in support of the RSAC use cases (traffic steering, network slicing) and add new xApps. New RUST framework xApp hw-rust will be added in this release. |
H release plan:
|
PTL: SUNIL SINGH |
Jira: Count of Epics, User Stories, Tasks, and Issues: 165 Total (216 issues) Completed Epics: |
H release highlights/accomplishments:
Gerrit Reviews |
Near-Real-time RAN Intelligent Controller Platform (E2 Interface) (RICPLT)
Original primary goals based on contributions from Nokia, Samsung, HCL, Capgemini, Parallel Wireless, Alexandre Huff (UTFPR) and Abhijit G:
We will deprecate the RMR-based E2 subscription interface and H-release xApps need to use the REST based interface already supported by the the C++, go, and python xApp frameworks (RIC-375). The subscription manager should handle subscriptions for failing xApps (RIC-929) and provide a callback on subscription delete success/failure (RIC-928).We plan to implement the RIC subscription delete required procedure (RIC-851)- Update to newer golang version of all components (RIC-881)
We will develop a CRD, i.e., a K8S operator on top of the DMS REST API to simplify xApp deployment (RIC-715). Also the DMS Rest interface gets the missing delete API (RIC-954). RIC-717 allows to deploy multiple cooperating xApps together.- On E2 side we will implement the E2 Reset procedure from RAN to RIC (RIC-949) and the RIC Subscription Delete procedure (RIC-851).
We also implement robustness improvements (RIC-932 for reconnect cases) andtroubleshooting improvements (RIC-813, RIC-814). - There's work planned to deploy the kserve-based model provisioning from the AI/ML project into the RIC platform (RIC-955)
The xapp frameworks for Golang (RIC-930), C++ andRust (RIC-951) will get some enhancements that are already implemented in the other languages,incl. support for xApp registration in the xapp-framework-cpp (RIC-705).- E2T (RIC-813) and E2Mgr (RIC-814) support dynamic changing of log levels for better troubleshooting
- RIC-953 A1 testing improvements and bug fixes
- Added to plan during H:
- Support for policy status notifications in A1 (RIC-973 (incl. RIC-975))
- Faster timeout in SCTP heartbeats (E2) (RIC-976)
- IPv6 support in RMR (RIC-985)
RICAPP-216:Bouncer xApp upgraded to E2AP 2.0, E2SM KPM 2.0, E2SM RC 1.0.3 RICAPP-215: Anomaly Detection xApp (H-Release) - listens to RMR port and expect A1 policy from non-RT RIC & Process A1 policy message. Bug: RICAPP-214 OSC RIC - e2mgr X1 Configuration Update problem - Moved to RICP Epics moved to next release. |
H release highlights/accomplishments:
Gerrit Reviews https://gerrit.o-ran-sc.org/r/gitweb?p=ric-app%2Fbouncer.git;a=shortlog;h=refs%2Fheads%2Fh-release Release 1.0.1 (Ie8fc46d2) · Gerrit Code Review (o-ran-sc.org) |
H release source code, container images and deployment instructions The list of container images for the H release: The list of container images for the release (link). Code Coverage Reports : Latest reports can be found at the following Link: Projects - O-RAN Software Community (sonarcloud.io). |
Near-Real-time RAN Intelligent Controller Platform (E2 Interface) (RICPLT) |
---|
Original primary goals based on contributions from Nokia, Samsung, HCL, Capgemini, Parallel Wireless, Alexandre Huff (UTFPR) and Abhijit G:
|
Achieved H release highlights = high-level release notes (2023-06-20) below (note that the release image list is here: link)
For the H release of the near-RT RIC we do only limited integration testing: only the use cases: deploy RIC, deploy xApp, make E2 connection, get list of A1 policies has been tested. Filled in end-of-release checklist: link |
PTL: Thoralf Czichy |
Status 2023-06-20: From the 23 epics planned (link) we implemented 11 (link). 12 items have been moved out of the H release, e.g, because of implementation delays (link). Incomplete items: 0 (link). Additionally we fixed 10 bugs and small implementation tasks (link) |
H release source code, container images and deployment instructions The list of container images for the release (link). A demo video for the H release deployment is available at the top of the demo page and shows
Code coverage: Code coverage reports (current coverage and list of components that need to set up Jenkins job for auto-generation of the reports as part of CI) |
Operation and Maintenance (OAM) |
---|
Primary Goals:
|
H release Feature Scope: |
- Link to planned Jira work items: all teams
Achieved H release highlights = high-level release notes (2023-06-20) below (note that the release image list is here: link)
- E2 reset (from E2 node to RIC), E2 subscription delete required, A1 policy status notifications
- Preparation of feature for I release, e.g., include xApps in subscription delete required decision
For the H release of the near-RT RIC we do only limited integration testing: only the use cases: deploy RIC, deploy xApp, make E2 connection, get list of A1 policies has been tested.
Filled in end-of-release checklist: link
PTL: Thoralf Czichy
Status 2023-06-20: From the 23 epics planned (link) we implemented 11 (link). 12 items have been moved out of the H release, e.g, because of implementation delays (link). Incomplete items: 0 (link). Additionally we fixed 10 bugs and small implementation tasks (link)
H release source code, container images and deployment instructions
The list of container images for the release (link). A demo video for the H release deployment is available at the top of the demo page and shows
- how to deploy the near-RT RIC platform,
- compile connect the E2 (e2 node) simulator from the OSC simulator project and
- compile the hw-go xapp from the xapp project and use the dms_cli to deploy it and check the E2 subscriptions the xApp created.
Code coverage: Code coverage reports (current coverage and list of components that need to set up Jenkins job for auto-generation of the reports as part of CI)
Operation and Maintenance (OAM) |
---|
Primary Goals:
|
H release Feature Scope:
Please see also project wiki for further details: H-Release |
PTL: Martin Skorupski |
H release highlights/accomplishments (2023-06-22):
Please see also project wiki for further details: H-Release |
PTL: Martin Skorupski |
H release highlights/accomplishments (2023-06-22):
Please see release details: H release source code, container images and deployment instructions (and status) Jira: Count of Epics ( 15 issues ), User Stories, Tasks, and Issues: 166 issues Source Code: Integration: |
...
O-RAN Central Unit (OCU) |
---|
Primary Goals:
|
H release Feature Scope: H Release Feature Scope:
|
PTL: |
TODO-deployment instructions (and status)NA |
O-DU High |
---|
Primary Goals: 1. Alignment to the ORAN WG8 AAD specification O-RAN.WG8.AAD-v07.00 2. New design with multi-scheduler algorithm support 3. Inter CU Handover 4. E2 interface enhancement 5. End-to-end integration |
H release Feature Scope:
|
PTL: Ankit Barve |
Status on |
H release highlights/accomplishments ( ):
H release source code, container images, and deployment instructions (and status) source code: https://gerrit.o-ran-sc.org/r/gitweb?p=o-du%2Fl2.git;a=shortlog;h=refs%2Fheads%2Fh-release |
O-DU Low |
---|
Primary Goals: TODOImplementation of the O-DU Low Physical Layer functions for a 5G Open Access Radio Network allowing the flexibility of a software implementation coupled with the ability of incorporating hardware accelerators on a selective basis and meets the O-RAN architecture goals of scalability, mix and match multi-vendor modules that are interoperable and that can be upgraded as the standards evolve by software updates. The O-DU Low physical layer functions follow the 3GPP TS 38 series recommendations for 5G and the 3GPP TS 36 series recommendations for LTE with the 3GPP 7.2 functional split between O-DU Low and O-RU. In 3GPP terms the O-DU Low is referred to HIGH-PHY in the functional split for 5G. Implementation of the Open Front Haul interface to the O-RU per O-RAN WG4 CUS specifications. Integration of this component with multi-vendor implementations of O-DU High and O-RU modules for end to end interoperability and compatibility verification. |
H release Feature Scope: The O-DU Low H release is the same as the F Release and G Release that added support for Massive MIMO, URLLC and it is based on the commercial FlexRan 21.11 release. The O-DU Low H, G and F Release code is an Intel contribution in collaboration with Tieto Poland for the source code releases in the O-RAN gerrit and for the binary blobs contributed via GitHub. For the documentation preparation of the H, F and G release Intel worked with collaboration from Fransiscus Bimo and Professor Ray-Guang Cheng from National Taiwan University of Science and Technology (NTUST). The H, G and F release are being used for end to end testing and it is based on the E maintenance release that was used for the 2021 November US O-RAN Plugfest and tested in conjuction with 2 stack partners and 2 different Test equipment vendors. The Front Haul Interface was also tested for compliance using Keysight's Front Haul Test equipment. Container images and deployment instructions are to be provided later H release Feature Scope: TODO |
PTL: Luis Farias , Alternate: @Chenxi Yue |
H release highlights/accomplishments ( ): H release includes a patch to our previous F & G Releases with a fix for a PRACH detection bug found by LNT. H release source code, container images, and deployment instructions (and status) source code: https://gerrit.o-ran-sc.org/r/gitweb?p=o-du%2Fphy.git;a=summary |
...
Infrastructure (INF) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Primary Goals:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H release Feature Scope:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PTL: Jackie Huang | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H release highlights/accomplishments ( ):
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Jira: Status of Epics, User Stories, Tasks, and Issues: Update at
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Test status: Code coverage:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Release Note: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Test status: Code coverage:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Release Note: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H release source code, images and deployment instructions
H release source code, images and deployment instructions
|
Integration and Test (INT) |
---|
Primary Goals: Make each OSC projects to adopt XTesting framework and contribute test cases that can be run at release time for validation. Stretch goal would be to write additional integration test cases based on across project interactions. |
H Feature Scope / Achievements:
|
PTL: James Li |
H release highlights/accomplishments (6/29/2023):
|
Integration and Test (INT) |
Primary Goals: Make each OSC projects to adopt XTesting framework and contribute test cases that can be run at release time for validation. Stretch goal would be to write additional integration test cases based on across project interactions. |
H Feature Scope / Achievements:
|
PTL: James Li |
H release highlights/accomplishments (<date>): H release source code, container images and deployment instructions gerrit (look for the latest changes for H release from the following repositories): https://gerrit.o-ran-sc.org/r/it/dep |
AIML Framework (AIMLFW)AIMLFW) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Primary Goals:
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H release highlights/accomplishments | Primary Goals:
| for Near-RT RIC
EPICs considered for H-release:
| H release highlights/accomplishments:
EPICs considered for H-release:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PTL: Joseph Thaliath | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Wiki: AI/ML Framework Tasks / Backlog / JIRA: https://jira.o-ran-sc.org/projects/AIMLFW/issues Gerrit / Code:
Sonar / Test Coverage Reports:Coverage Reports:
Documentation: https://docs.o-ran-sc.org/en/latest/projects.html#ai-ml-framework Installation/Demo guides: AIMLFW: https://docs.o-ran-sc.org/projects/o-ran-sc-aiml-fw -athp-data-extraction-aimlfw-dep/en/latest/installation-guide.html Kserve adapter: sonarcloud.io/project/overview?id=docs.o-ran-sc.org/projects/o-ran-sc _awmf-tmDocumentation: https://docsDemo videos: Release Container images:
Installation/Demo guides: AIMLFW:
Demo videos: Release Container images:
|
Features Implemented Mapping to O-RAN Spec by Project
Project Name | O-RAN spec | Additional Notes |
---|---|---|
Non RT RIC | O-RAN.WG2.Non-RT-RIC-ARCH-TS-v02.01 ORAN.WG2.R1GAP-v02.00 O-RAN.WG2.A1GAP-v03.00 O-RAN.WG2.R1 Use Cases and Requirements.v02.00 | |
RICAPP | O-RAN.WG3.E2SM-KPM-v02.03 O-RAN.WG3.E2SM-RC-v01.03 O-RAN.WG3.E2AP-v02.03 | |
RICPLT | O-RAN.WG3.RICARCH-R003-v04.00 O-RAN-WG3.RICAPI-R003-v01.00 O-RAN.WG3.E2AP-v02.03 O-RAN.WG3.UCR-v02.00 | |
OAM | O-RAN.WG10.O1-Interface.0-v08.00 | |
O-DU High | O-RAN-WG3.RICAPI-R003-v01.00 | |
SIM | ||
SMO | ||
INF | O-RAN.WG6.O2IMS-INTERFACEv04.00 O-RAN.WG6.O2DMS-INTERFACE-K8S-PROFILE-v02.00 | O-RAN_O2_IMS_Spec_Compliance_v3v4_v01.xlsx |
AIMLFM |