  1. Thoralf-TODO-cross-check with A. if he has updated the instructions to point to helm3.
    1. A. can look on this on Jan-31 and update here: new section here - https://docs.o-ran-sc.org/projects/o-ran-sc-it-dep/en/latest/installation-guides.html
  2. Every time: Check rule RC-4 (link) that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
    1. https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/7450 ok
    2. https://gerrit.o-ran-sc.org/r/c/ric-plt/alarm-go/+/7465 ok
    3. https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/7481 ok
    4. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/7515 ok
    5. https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/7592 ok (note this is the E2APv2.0 support in submgr in subbranch "e2ap-02.00" - only to be merged with other E2APv2.0 changes)
    6. https://gerrit.o-ran-sc.org/r/c/ric-plt/sdlgo/+/7587 ok
    7. https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/7610 ok
  3. every second time: Review code coverage stats and blocker code smells
    1. We take a look at the two links in the beginning of this page: Code coverage reports..
    2. The list below is only working reports // Anybody volunteering to work with LF on making the code coverage CI to work again (there's still the old JVM version)
    3. ric-plt/alarm-go 0,0 // no bugs (2021-11-22 → 2022-01-30 )
    4. ric-plt/appmgr 17,5 → 19,3 // 1 major bug (2021-11-22 → 2022-01-30)
    5. ric-plt/e2mgr 88,6 // no bugs (2021-11-18 → 2022-01-30)
    6. ric-plt/lib/rmr 70,4 → 86,2->70,4 // no bugs (2021-11-23 → 2022-01-25)
    7. ric-plt/sdlgo 47,4 → 32.4 → 25,2 // no bugs (2021-11-23 → 2022-01-31) → raise bug
    8. ric-plt/submgr 44,8  → 47,4 → 51,2 // no bugs (2021-11-22 → 2022-01-30)
    9. ric-plt/tracelibcpp 0,0 // 1 major bug (2021-11-16 → 2022-01-25)
    10. ric-plt/tracelibgo 94,7 → 96,2 //0 bugs (2021-11-22 → 2022-01-30)
    11. ric-plt/xapp-frame 0,0 // no bugs (2021-09-30 → 2021-11-22) - same as before.
    12. ric-plt/xapp-frame-cpp 96,3 → 95,6 // still 2 blocker bugs → 0 blocker bugs (fix) (2021-11-17 → 2022-01-26)
  4. Every time: Check if there are new bug reports in JIRA: link
    1. new: RIC-872 needs someone to fix. → Alexandre working it. Discussion in revies
    2. RIC-864 xapp-frame-cpp CI does not use Dockerfile and therefore uses Ubuntu18.04 (not 20.04) in build
    3. RIC-857 sporadically RMR takes multiple minutes before being "ready"
    4. RIC-835 → 2021-12-07 news from Viktor
    5. RIC-837 RMR is not forwarding messages from E2T to E2M
    6. RIC-840 Unable to deploy E2Term on Dawn release
    7. RIC-852 Intermittent Issue with E2T: While setting up E2 setup request and response.
      1. 2021-12-21: Trying to get bandwidth for this during F release.
    8. fixed: RIC-880, RIC-875, RIC-873, RIC-869, RIC-862
    9. anybody would like to get more familiar with RMR?
  5. F release
    1. schedule
      1. Sprint F release dev sprint 1: Feb-21 to Mar-13 (as per Releases)
      2. Sprint F release dev sprint 2: Mar-14 to Apr-3
      3. Sprint F release dev sprint 3: Apr-4 to Apr-24
      4. Sprint F release dev sprint 4: Apr-25 to May-15 (last planned development sprint)
      5. Sprint F release dev sprint5: May-16 to Jun-5 (only for unplanned last-minute development items)
    2. Filter All RICP items: F release only (links copied from Jira usage conventions)
      1. committed (90% sure) and tentative (90...30% sure) items: subteam-n, subteam-h, subteam-s and all teams.
      2. committed items only: all teams (committed)
      3. items that are known to require work, but are currently not in F release: link
    3. update xApps that use the old RMR to-be-removed xapp subscription interface - Thoralf asking Sunil to coordinate xapp-side adaptation to REST interface - see RIC-375
      1. kpimon
      2. bouncer
      3. all hello-world xapps (hw-go already uses submgr REST ifc)
      4. update simulators (discuss with Subhash if needed) do we have two simulators we have to update?
    4. Sunil still to discuss with other team members for other items from subteam-h
    5. James: RSAC recommended incorporating OTF in testing (David K. can help)- Thoralf to start mail thread with HCL (sunil, Sangeetha) and David on this plus James. 2022-01-27 (Mail sent)
  6. James had a meeting with Powderlab in UofU on using their lab setup for testing. They have earlier tested OSC D release (and others). James is thinking about using this. Low hanging fruit would be to see if we can run our end-2-end robot test cases in this lab.
    1. POWDER testbed ORAN demo submission at MWC 2022: https://oranalliance.atlassian.net/wiki/spaces/OAH/pages/2330100360/PROCESSING+MWC-B-22-14+University+of+Utah
  7. Needed: overview of what is in golang and what in python and what in c++ and what is missing →
    1. Added this as RIC-882 (F release)
  8. RICAPP agenda: RICAPP Meetings.

...