You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 267 Next »

Meeting Info

RIC project meetings are open to the public and held on Tuesdays at 2pm UTC.  World Time Zone Map

Zoom 1 Info:

UTC-timeevery 2nd Tuesday, check from calendar

https://zoom.us/j/9644759813

New York (EDT / UTC-4 during DST (-5 in the winter))every 2nd Tuesday, check from calendar+1 669 900 6833 // +1 646 558 8656 // 855 880 1246 (Toll Free) // 877 369 0926 (Toll Free)
Paris (CEST / UTC+1)every 2nd Tuesday, check from calendar+33 7 5678 4048 // +33 1 8288 0188 // 805 082 588 (Toll Free)
Beijing (CST / UTC+8)every 2nd Tuesday, check from calendar+86 10 87833177 // +86 10 53876330 // 400 616 8835 (Toll Free) // 400 669 9381 (Toll Free)
Tokyo (JST / UTC+9) every 2nd Tuesday, check from calendar+81 524 564 439 // +81 3 4578 1488 // 0 800 100 5040 (Toll Free)
Helsinki  (EEST / UTC+2 in the winter (+3 during DST))every 2nd Tuesday, check from calendar

+358 341092129

Other international numbersWorld Time Zone Map

International numbers available: https://zoom.us/u/acyy3hylQi


2021-03-16

Recording: todo-record-to-cloud

  1. record-to-cloud. Note we change the recording format and I will post after the meeting in the meeting minutes a publicly available link like this one: link. This allows reading the audio transcript and fast-forward to places in the video that are highly-relevant. The transcript usually take a few hours before available. The video is available immediately.
  2. Regular items:
    1. Every time: Check that all large or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
      1. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/5748 OK
      2. https://gerrit.o-ran-sc.org/r/c/ric-plt/rtmgr/+/5743 NOK - Thoralf contacts committers. Bug report RIC-764.
      3. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/5681 OK
      4. https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/5640 OK
      5. https://gerrit.o-ran-sc.org/r/c/ric-plt/libe2ap/+/5617 OK as documentation commit
    2. every second time: Review code coverage stats.
  3. Snapshot (2021-03-16) jira_dawn_near_rt_ric.xlsx  // Always latest view from JIRA: Content of Dawn: 31 items planned: link and 15 "stretch goals": link
  4. RIC-671 (Alok) Who did originally pointed us to the “LF security” service? Which security issues it actually discovers that we do not already cover with Sonarcube? Does it actually address “container scans” for vulnerabilities? Does it cover scanning for including of vulnerable libraries or modules, like go modules? If we decide to go forward, we need to … (1) decide if we create a “meta project” entry similar to, e.g., CNCF? Like “O-RAN software community (O-RAN SC)” under which we then have separate projects, like, Near-RT RIC, which in turn will include a certain number of repositories?

        1. RIC-671 [Achieve level "passing" in CII]  Requested Thoralf for submitting application for ORAN project onboarding on LFN security. // Also explored LFN inputs using nexus IQ. The example jobs failed into sandbox. Will continue to work on it.
  5. Initial discussion on alpine base images.
  6. HCL Items:
    1. RIC-184 - [Adapt to latest K8S and helm (testing in OSC labs)] - InProgress VPN access enabled waiting for Felix to create VM in T-lab & share details.  – Pending In the absence of VM provisioned in Tlab, VM was created in HCL Lab & tested with k1.18 with helm3. The logs were shared with Thoralf & two minor bugs reported ( RIC-761 for dbaas & RIC-762 for helm3). The fix for both bugs have been submitted into Gerrit review by respective owners.
      1. Subtask: RIC-746 Run nanobot based test automation from - it/test repository on RIC with k8 1.18/helm3 in OSC Lab  // Nanobot Testing in progress on latest helm version and k8s.
    2. RIC-723 - [Study performance overhead of latest opentracing solutions] – InProgress // Able to generate sampling data after getting some help from thoralf. Continue to work with other scenarios to compare with previous results.
    3. RIC-731- [Static code and test coverage for E2] -  90% Completed. Blocked on RIC-760 for test coverage.


RIC-150 - Perform e2e RIC benchmarking

                Subtask: RIC-741   Verify Subscription flow using RMR API

                                Code committed and sent for review

                Subtask: RIC-742 Verify Indication flow using RMR API

                                Code committed and sent for review

                Subtask: RIC-754 KPIMON xapp validation using nanobot with SDL

                                KPIMON deployed and it is running. Validating the packet flow between KPIMON & E2SIM. – InProgress

RIC-743 Create multiple e2sim for RIC benchmarking

               Able to connect 800 e2sim nodes to the ric platform. Number of connected nodes drops after scaling. Tested with  1500 E2 node iterations.  

                Collecting the logs and document the observation in a Jira Ticket

RIC-744 Verify the E2E communication for multiple e2sim

Debugging the issue on subscription response messages with multiple e2simulator – For 10 E2 SIM, RIC subscription Request and response is working fine.

Now scaling it for 800+ RIC Subscription request/response.


  1. RICAPP agenda: RICAPP Meetings.

2021-03-02

Recording:near_rt_ricplatform_and_ricapp_meeting_2021_03_02.mp4

  1. Thoralf to figure out how to publish zoom recording
  2. for CII compliance improvements we should do this from now on
    1. check that all large or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
    2. add a regular item in the meeting (once per month) to check code coverage
  3. in context of CII, pls. note this convention in section "security bugs":  Tools (mailing list, JIRA, Gerrit)
  4. Release criteria checklist template
  5. If you raise issues to LF support that are sensible to make visible to others, pls. first raise a ticket to join "ORAN" organization in the support tool: "When these organizations (ORAN) were created in the beginning, we added by default all members from the committer groups into the organization. If at that time a particular user was not part of any group or just joined the community, then they will not be automatically added into the oran organization. Going forward, the new user will need to create a support ticket to be added to the organization."
  6. HCL items:

    1. RIC-184 - [Adapt to latest K8S and helm (testing in OSC labs)] - InProgress VPN access enabled waiting for Felix to create VM in T-lab & share details. Sent the reminder on Thu (25th Feb). VM in T-lab still needed from Felix.

    2. RIC-723 - [Study performance overhead of latest opentracing solutions] – InProgress Able to generate sampling data after getting some help from thoralf. Continue to work with other scenarios to compare with previous results. sampling data now available. Numbers seem to be different than from previous PDF. Alok to schedule meeting with Thoralf once enough new information is available.

    3. RIC-731- [Static code and test coverage for E2] -  90% Completed. Had a debug session with E2 dev team today (2nd March) & we were able to get the blocker issue resolved. Looking forward to close the issue by this week & ready for submitting Gerrit changes to ci-management repo.

    4. RIC-671 [Achieve level "passing" in CII] Received information from LFN on queries on dynamic code analysis & CLM.  Going through it.

    5. RIC-150 - Perform e2e RIC benchmarking

      1. Subtask: RIC-741 Verify Subscription flow using RMR API Done – Still need to commit the code

      2. Subtask: RIC-742 Verify Indication flow using RMR API Done – Still need to commit the code

      3. Subtask: RIC-754 KPIMON xapp validation using nanobot with SDL : KPIMON Xapp deployment got crashloopbackoff state. Sent mail to the committer (Jinwei.fan@samsung.com) to confirm on this.

    6. RIC-743 Create multiple e2sim for RIC benchmarking Able to connect 800 e2sim nodes to the ric platform. Number of connected nodes drops after trying to scale >800 (Tests fail with 1500 E2 node iterations).   

    7. RIC-744 Verify the E2E communication for multiple e2sim Transaction ID issue has been resolved. Now debugging the issue on subscription response messages with multiple e2simulator.

  7. 1.5 slides from Rahul (if no time, by e-mail). Rahul to send mail. include Matti, Thoralf, Abukar, Alok. Ramesh, Sunil (if you don't have the address, I can add them to the mail later) → Slide E2APDesign 2.0.pptx
  8. RICAPP agenda: RICAPP Meetings.

Older meeting minutes

check from here: Project meetings (old)

  • No labels