You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 291 Next »

Meeting Info

RIC project meetings are open to the public and held on Tuesdays at 1pm UTC.  World Time Zone Map

Zoom 1 Info:

UTC-timeevery 2nd Tuesday, check from calendar

https://zoom.us/j/9644759813

New York (EDT / UTC-4 during DST (-5 in the winter))every 2nd Tuesday, check from calendar+1 669 900 6833 // +1 646 558 8656 // 855 880 1246 (Toll Free) // 877 369 0926 (Toll Free)
Paris (CEST / UTC+1)every 2nd Tuesday, check from calendar+33 7 5678 4048 // +33 1 8288 0188 // 805 082 588 (Toll Free)
Beijing (CST / UTC+8)every 2nd Tuesday, check from calendar+86 10 87833177 // +86 10 53876330 // 400 616 8835 (Toll Free) // 400 669 9381 (Toll Free)
Tokyo (JST / UTC+9) every 2nd Tuesday, check from calendar+81 524 564 439 // +81 3 4578 1488 // 0 800 100 5040 (Toll Free)
Helsinki  (EEST / UTC+2 in the winter (+3 during DST))every 2nd Tuesday, check from calendar

+358 341092129

Other international numbersWorld Time Zone Map

International numbers available: https://zoom.us/u/acyy3hylQi


2021-04-27

Recording: TODO

  1. Every time: Check that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
    1. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/5848 (ok, exceptional) "Add ability to save route table updates to disk". Actual code lines changed is "only" 96 in an area that supports debugging. Wrote a note to Scott, but no expectation to add test cases.
    2. https://gerrit.o-ran-sc.org/r/c/ric-plt/xapp-frame/+/5856 (ok, includes unit test)
    3. https://gerrit.o-ran-sc.org/r/c/ric-plt/vespamgr/+/5864 (ok, actually only test cases for coverage improvements)
    4. https://gerrit.o-ran-sc.org/r/c/ric-plt/xapp-frame/+/5865 (ok, adds HTTP port in subscription, test case was adapted)
    5. https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/5897 (ok, unit testing coverage improvements)
    6. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/5909 (ok,. test case was added)
    7. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/5925 (ok, new test cases)
    8. not yet merged: https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/5933
    9. not yet merged: https://gerrit.o-ran-sc.org/r/c/ric-plt/ric-dep/+/5826
  2. every second time: Review code coverage stats. (Sunil checks if this next step (overview page) is on HCL or on Thoralf's side as next action) - will discuss with Thoralf next time or by email.
  3. demos again?

2021-04-13

Recording: link to zoom recording

  1. Every time: Check that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
    1. not done this time, but will do next meeting.
  2. every second time: Review code coverage stats. (Sunil checks if this next step (overview page) is on HCL or on Thoralf's side as next action) - will discuss with Thoralf next time or by email.
  3. Samsung: Naman replacement for Rahul - will focus on E2AP 1.1 in E2 Manager
    1. A1-EI: Building infrastructure and dev setup - initial implementation this month.
    2. py xapp framework (Heewon Park - reported one issue on missing API in E2AP library) - RIC-773 - Matti will followup.
  4. RIC-184 - [Adapt to latest K8S and helm (testing in OSC labs)] - completed

  5. RIC-762- Code is merged by Felix. - Closed

    1. Subtask: RIC-746 Run nanobot based test automation from - it/test repository on RIC with k8 1.18/helm3 in OSC Lab Nanobot testing completed on top of helm 3 and k8s v1.18 version.   Closed this subtask. Created a new subtask RIC-755, to do nanobot testing in OSC lab with steps provided. As suggested by Thoralf.

  6. RIC-723 - [Study performance overhead of latest open-tracing solutions] – InProgress

    1. Able to generate sampling data after getting some help from Thoralf. Continue to work with other scenarios to compare with previous results.Work in progress

  7.  RIC-731- [Static code and test coverage for E2T] -  90% Completed. // Blocked on RIC-760 for test coverage.

  8. RIC-671 [Achieve level "passing" in CII] Requested Thoralf for submitting application for ORAN project onboarding on LFN security. Work in progress

  9. RIC-150 - Perform e2e RIC benchmarking

    1. Subtask: RIC-740, 741 & 742Code committed. Addressed the review comments provided by Dave. Job build failed issue resolved.  The tickets can now be closed

    2. Subtask: RIC-754 KPIMON xapp validation using nanobot with SDL // SDL database query validation using robot and Testing part done. Updated the steps in readme file. // Code commit – InProgress.

  10. RIC-743 Create multiple e2sim for RIC benchmarking // E2term pod restart issue – Work in progress - waiting for meeting with Nokia.

  11. RIC-744 Verify the E2E communication for multiple e2sim // Multiple RIC indication messages is working fine with the connected E2 Nodes. Tested with 100+ E2 nodes.

  12. HCL account request still in progress - both account and VM is missing - Matti will keep on reminding Felix.
  13. RICAPP agenda: RICAPP Meetings.

2021-03-30

Recording: link to zoom recording with audio transcript

  1. Every time: Check that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
    1. https://gerrit.o-ran-sc.org/r/c/ric-plt/appmgr/+/5816 test cases were added separately via: https://gerrit.o-ran-sc.org/r/c/ric-plt/appmgr/+/5820
  2. every second time: Review code coverage stats. (Sunil checks if this next step (overview page) is on HCL or on my side as next action)
  3. Thoralf on holiday: Apr-02 to Apr-13. Matti to host the next meeting
  4. Time changed to 1pm UTC. I.e., locations without daylight savings time the meeting starts now one hour earlier
  5. CII badging: https://bestpractices.coreinfrastructure.org/en/projects?q=oranand not yet public: https://security.lfx.linuxfoundation.org/#/my-projects (near-RT RIC)
  6. RIC-184 - [Adapt to latest K8S and helm (testing in OSC labs)] - InProgress // VPN access enabled waiting for Felix to create VM in T-lab & share details.  – Pending // Subtask: RIC-746 Run nanobot based test automation from - it/test repository on RIC with k8 1.18/helm3 in OSC Lab // Nanobot Testing done on latest helm version and k8s. Found issue in submgr,  we got decode failed due to RECIPE.yaml which is not having the latest versions of ricplt components. We internally changed with latest tag of submgr and completed the testing. Once we get the updated RECIPE.yaml we will test this one more time and close the ticket.

  7. RIC-723 - [Study performance overhead of latest opentracing solutions] – InProgress // Able to generate sampling data after getting some help from thoralf. Continue to work with other scenarios to compare with previous results. Shared the progress with Thoralf in a dedicated session. Need to  study cpp based library of opentracing to modify existing artifacts. Work in progress.

  8. RIC-731- [Static code and test coverage for E2] -  90% Completed. Blocked on RIC-760 for test coverage. Dhiraj waiting for prioritisation of this task by project management. For now this is blocked.

  9. RIC-671 [Achieve level "passing" in CII] // Requested Thoralf for submitting application for ORAN project onboarding on LFN security. Waiting for the reply from LFN to move further. (see item 5 above)

  10. RIC-150 - Perform e2e RIC benchmarking

    1. Subtask: RIC-740, 741 & 742 Code committed. Addressed the review comments. Job build failed. working in progress.

    2. Subtask: RIC-754 KPIMON xapp validation using nanobot with SDL // Manually checked the database entry from Kpimon and adding up code for checking via SDL. Waiting for the mail response from Matti and Ron on clarifications. The question is related to the simulator. Ron should answer today or tommorrow.

  11. RIC-743 Create multiple e2sim for RIC benchmarking // Mail is send with the detailed information on multi e2sim e2 connection status for Jira ticket. Checked the e2term pod for memory issue at the time of restart. It seems there is no issue in pod memory and CPU configuration. pod restart due to e2term application error only. Currently trying to capture the application log (remember to change config file and restart binary from within the pod) at the time of restart.

  12. RIC-744 Verify the E2E communication for multiple e2sim  // Verified the E2E communication with more that 120+ E2 nodes connections with Multiple RIC indication messages. Observed 2-3 RIC subscription delete request everytime. E2Term is randomly restarted. Multiple RIC indication messages is working fine with the connected E2 Nodes. Tested with 100+ E2 nodes.

  13. Influx helm charts - work in progress in ric-dep (no review yet)
  14. update from Samsung
    1. design aspects for E2APv1.1 (Rahul to upload) design should be ready.
    2. A1 (Subhash to upload)
    3. R. to be replaced with someone new.
  15. RICAPP agenda: RICAPP Meetings.

2021-03-16

Recording: link to zoom recording with audio transcript

  1. record-to-cloud. Note we change the recording format and I will post after the meeting in the meeting minutes a publicly available link like this one: link. This allows reading the audio transcript and fast-forward to places in the video that are highly-relevant. The transcript usually take a few hours before available. The video is available immediately.
  2. Regular items:
    1. Every time: Check that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
      1. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/5748 OK
      2. https://gerrit.o-ran-sc.org/r/c/ric-plt/rtmgr/+/5743 OK - Thoralf contacted committers. Bug report RIC-764. The commit included a lot of formatting changes that made it large. Remember to separate such changes from functionality commits.
      3. https://gerrit.o-ran-sc.org/r/c/ric-plt/lib/rmr/+/5681 OK
      4. https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/5640 OK
      5. https://gerrit.o-ran-sc.org/r/c/ric-plt/libe2ap/+/5617 OK as documentation commit
    2. every second time: Review code coverage stats.
  3. Snapshot (2021-03-16) jira_dawn_near_rt_ric.xlsx  // Always latest view from JIRA: Content of Dawn: 31 items planned: link and 15 "stretch goals": link
  4. RIC-671 (Alok) Who did originally pointed us to the “LF security” service? Which security issues it actually discovers that we do not already cover with Sonarcube? Does it actually address “container scans” for vulnerabilities? Does it cover scanning for including of vulnerable libraries or modules, like go modules? If we decide to go forward, we need to … (1) decide if we create a “meta project” entry similar to, e.g., CNCF? Like “O-RAN software community (O-RAN SC)” under which we then have separate projects, like, Near-RT RIC, which in turn will include a certain number of repositories?

    1. RIC-671 [Achieve level "passing" in CII] Requested Thoralf for submitting application for ORAN project onboarding on LFN security. // Also explored LFN inputs using nexus IQ. The example jobs failed into sandbox. Will continue to work on it.
    2. Alok to schedule a meeting on this
  5. Initial discussion on alpine base images. We handle by e-mail. At least QP xApp uses alpine (the same was as A1)
  6. HCL Items:
    1. RIC-184 - [Adapt to latest K8S and helm (testing in OSC labs)] - InProgress VPN access enabled waiting for Felix to create VM in T-lab & share details.  – Pending In the absence of VM provisioned in Tlab, VM was created in HCL Lab & tested with k1.18 with helm3. The logs were shared with Thoralf & two minor bugs reported ( RIC-761 for dbaas & RIC-762 for helm3). The fix for both bugs have been submitted into Gerrit review by respective owners.
      1. Subtask: RIC-746 Run nanobot based test automation from - it/test repository on RIC with k8 1.18/helm3 in OSC Lab  // Nanobot Testing in progress on latest helm version and k8s.
    2. RIC-723 - [Study performance overhead of latest opentracing solutions] – InProgress // Able to generate sampling data after getting some help from thoralf. Continue to work with other scenarios to compare with previous results.
    3. RIC-731- [Static code and test coverage for E2] -  90% Completed. Blocked on RIC-760 for test coverage.
    4. RIC-150 - Perform e2e RIC benchmarking
      1. Subtask: RIC-741   Verify Subscription flow using RMR API // Code committed and sent for review
      2. Subtask: RIC-742 Verify Indication flow using RMR API // Code committed and sent for review
      3. Subtask: RIC-754 KPIMON xapp validation using nanobot with SDL // KPIMON deployed and it is running. Validating the packet flow between KPIMON & E2SIM. – InProgress
    5. RIC-743 Create multiple e2sim for RIC benchmarking // Able to connect 800 e2sim nodes to the ric platform. Number of connected nodes drops after scaling. Tested with 1500 E2 node iterations.  // Collecting the logs and document the observation in a Jira Ticket (still pending)
    6. RIC-744 Verify the E2E communication for multiple e2sim // Debugging the issue on subscription response messages with multiple e2simulator – For 10 E2 SIM, RIC subscription Request and response is working fine. // Now scaling it for 800+ RIC Subscription request/response.
      1. Thoralf asked Himesh: Could you provide a description of what you did and what happened in the failure case and where we currently are.
  7. InfluxDB issue (simple single-instance should be enough).
  8. configuration handling in E2AP seems to settle down. Rahul (not in meeting today) will finalize via e-mail.
  9. Subhash (Samsung) asked about t-lab access. About VMs OSC Community Lab Note that HCL is also working on this. Matti looking for someone from ATT to help (Felix busy).
  10. RICAPP agenda: RICAPP Meetings.

2021-03-02

Recording:near_rt_ricplatform_and_ricapp_meeting_2021_03_02.mp4

  1. Thoralf to figure out how to publish zoom recording
  2. for CII compliance improvements we should do this from now on
    1. check that all large or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
    2. add a regular item in the meeting (once per month) to check code coverage
  3. in context of CII, pls. note this convention in section "security bugs":  Tools (mailing list, JIRA, Gerrit)
  4. Release criteria checklist template
  5. If you raise issues to LF support that are sensible to make visible to others, pls. first raise a ticket to join "ORAN" organization in the support tool: "When these organizations (ORAN) were created in the beginning, we added by default all members from the committer groups into the organization. If at that time a particular user was not part of any group or just joined the community, then they will not be automatically added into the oran organization. Going forward, the new user will need to create a support ticket to be added to the organization."
  6. HCL items:

    1. RIC-184 - [Adapt to latest K8S and helm (testing in OSC labs)] - InProgress VPN access enabled waiting for Felix to create VM in T-lab & share details. Sent the reminder on Thu (25th Feb). VM in T-lab still needed from Felix.

    2. RIC-723 - [Study performance overhead of latest opentracing solutions] – InProgress Able to generate sampling data after getting some help from thoralf. Continue to work with other scenarios to compare with previous results. sampling data now available. Numbers seem to be different than from previous PDF. Alok to schedule meeting with Thoralf once enough new information is available.

    3. RIC-731- [Static code and test coverage for E2] -  90% Completed. Had a debug session with E2 dev team today (2nd March) & we were able to get the blocker issue resolved. Looking forward to close the issue by this week & ready for submitting Gerrit changes to ci-management repo.

    4. RIC-671 [Achieve level "passing" in CII] Received information from LFN on queries on dynamic code analysis & CLM.  Going through it.

    5. RIC-150 - Perform e2e RIC benchmarking

      1. Subtask: RIC-741 Verify Subscription flow using RMR API Done – Still need to commit the code

      2. Subtask: RIC-742 Verify Indication flow using RMR API Done – Still need to commit the code

      3. Subtask: RIC-754 KPIMON xapp validation using nanobot with SDL : KPIMON Xapp deployment got crashloopbackoff state. Sent mail to the committer (Jinwei.fan@samsung.com) to confirm on this.

    6. RIC-743 Create multiple e2sim for RIC benchmarking Able to connect 800 e2sim nodes to the ric platform. Number of connected nodes drops after trying to scale >800 (Tests fail with 1500 E2 node iterations).   

    7. RIC-744 Verify the E2E communication for multiple e2sim Transaction ID issue has been resolved. Now debugging the issue on subscription response messages with multiple e2simulator.

  7. 1.5 slides from Rahul (if no time, by e-mail). Rahul to send mail. include Matti, Thoralf, Abukar, Alok. Ramesh, Sunil (if you don't have the address, I can add them to the mail later) → Slide E2APDesign 2.0.pptx
  8. RICAPP agenda: RICAPP Meetings.

Older meeting minutes

check from here: Project meetings (old)

  • No labels