Meeting Info
RIC project meetings are open to the public and held on Tuesdays at 2pm UTC (winter) and 1pm UTC (summer). World Time Zone Map
Zoom 1 Info:
- Join from PC, Mac, Linux, iOS, or Android: https://zoom.us/j/9644759813
- Meeting ID for dial-in: 9644759813
UTC-time | every 2nd Tuesday, check from calendar | |
New York (EDT / UTC-4 during DST (-5 in the winter)) | every 2nd Tuesday, check from calendar | +1 669 900 6833 // +1 646 558 8656 // 855 880 1246 (Toll Free) // 877 369 0926 (Toll Free) |
Paris (CEST / UTC+1 in the winter (+2 during DST)) | every 2nd Tuesday, check from calendar | +33 7 5678 4048 // +33 1 8288 0188 // 805 082 588 (Toll Free) |
Beijing (CST / UTC+8) | every 2nd Tuesday, check from calendar | +86 10 87833177 // +86 10 53876330 // 400 616 8835 (Toll Free) // 400 669 9381 (Toll Free) |
Tokyo (JST / UTC+9) | every 2nd Tuesday, check from calendar | +81 524 564 439 // +81 3 4578 1488 // 0 800 100 5040 (Toll Free) |
Helsinki (EEST / UTC+2 in the winter (+3 during DST)) | every 2nd Tuesday, check from calendar | +358 341092129 |
Delhi (IST // UTC +5:30 | every 2nd Tuesday, check from calendar | TODO |
Other international numbers | World Time Zone Map | International numbers available: https://zoom.us/u/acyy3hylQi |
2021-11-23
Recording: link to zoom recording
- Anybody new who wants to introduce him/herself?
- Every time: Check rule RC-4 (link) that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
- ...
- every second time: Review code coverage stats and blocker code smells
- We take a look at the two links in the beginning of this page: Code coverage reports..
- Anybody volunteering to work with LF on making the code coverage CI to work again (there's still the old JVM version)
- Anybody willing to work on them?
- Every time: Check if there are new bug reports in JIRA: link
- Action items
- SCCL update - Matti will check with Tracy
- still discussion within O-RAN-SC still ongoing
- publication of O-RAN specs of July train should happen any time now.
- E2 simulator seeing E2 setups not passing through: Wiki page updated but no word from Nokia - trying 100 subscriptions - testing still in progress, will check with Amit if bug has been filed (nokia waiting for test case being run in newer cloud environment). Amit raised RIC-852 for this.
- James (INT PTL): Sent email to PTLs on what is needed. Need automation of testing for all projects.
- Any comments?
- VES alarm events, for example (James)
- James: non-rt RIC - near-RT RIC integration A1. Discuss With Sunil/Matti/James, e.g. TS xApps has disabled code for this.
- A1-EI could also be integrated (Subhash raised this)
- Ramesh - resue E2 simulator
- TODO thoralf to start mail thread on this.
- SCCL update - Matti will check with Tracy
- Expected that we stop development end of November. In Dec-7 meeting we will do status check and after this only exceptional (specially managed) commits to near-RT RIC for the rest of December.
- Preliminary planning for the F release
- likely not completed in E release (spill over into F): RIC-647, and all from this list.
- Candidate list for F release (priority column as per Thoralf's best understanding) https://jira.o-ran-sc.org/issues/?jql=(fixVersion%20in%20(ZZZ_future)%20or%20fixVersion%20in%20(F)%20)AND%20project%20%3D%20%22Near%20Realtime%20RAN%20Intelligent%20Controller%22%20%20ORDER%20BY%20component%20ASC
- we will discuss this again in two weeks from now.
- Do we update to golang 1.16 (in go.mod) in all repos? Juha now updated golang version in Ubuntu base image along with Ubuntu image update to 20.04.
- A1-Med is using 1.16; others need to be checked
- RICAPP agenda: RICAPP Meetings.
2021-11-09
Recording: link to zoom recording
- Anybody new who wants to introduce him/herself?
- GG (Parallel Wireless): wants to participate and possible contribute
- Viktor (contractor for globallogic/ARM) working on the ARM64 port
- Every time: Check rule RC-4 (link) that all L or XL commits of the last two weeks have also new unit tests. This is our policy. link-to-reviews (gerrit filter instructions // gerrit t-shirt-sizing).
- https://gerrit.o-ran-sc.org/r/c/ric-plt/sdlgo/+/6887 ok
- https://gerrit.o-ran-sc.org/r/c/ric-plt/e2mgr/+/6832 ok
- https://gerrit.o-ran-sc.org/r/c/ric-plt/a1/+/6939 ok
- https://gerrit.o-ran-sc.org/r/c/ric-plt/xapp-frame/+/6966 ok
- https://gerrit.o-ran-sc.org/r/c/ric-plt/ricctl/+/6963 ok, yaml only
- https://gerrit.o-ran-sc.org/r/c/ric-plt/submgr/+/6915 ok
- https://gerrit.o-ran-sc.org/r/c/ric-plt/e2/+/6931 ok, asn1c output only
- https://gerrit.o-ran-sc.org/r/c/ric-plt/ricdms/+/6964 ok, yaml only
- https://gerrit.o-ran-sc.org/r/c/ric-plt/sdlgo/+/6958 ok
- https://gerrit.o-ran-sc.org/r/c/ric-plt/sdlgo/+/7006 ok
- every second time: Review code coverage stats and blocker code smells
- We take a look at the two links in the beginning of this page: Code coverage reports..
- Anybody volunteering to work with LF on making the code coverage CI to work again (there's still the old JVM version)
- Anybody willing to work on them?
- Every time: Check if there are new bug reports in JIRA: link
- Action items
- SCCL update - Matti will check with Tracy
- still discussion within O-RAN-SC still ongoing
- publication of O-RAN specs of July train should happen any time now.
- E2 simulator seeing E2 setups not passing through: Wiki page updated but no word from Nokia - trying 100 subscriptions - testing still in progress, will check with Amit if bug has been filed (nokia waiting for test case being run in newer cloud environment). Amit raised RIC-852 for this.
- James (INT PTL): Sent email to PTLs on what is needed. Need automation of testing for all projects.
- Any comments?
- VES alarm events, for example (James)
- James: non-rt RIC - near-RT RIC integration A1. Discuss With Sunil/Matti/James, e.g. TS xApps has disabled code for this.
- A1-EI could also be integrated (Subhash raised this)
- Ramesh - resue E2 simulator
- TODO thoralf to start mail thread on this.
- SCCL update - Matti will check with Tracy
- Thoralf recorded a 24min step-by-step video on how to deploy the Dawn release: 2021-11-05 Demo video release Dawn
- anybody has time to do part of teh demo with public E2 simulator?
- Expected that we stop development end of November. In Dec-7 meeting we will do status check and after this only exceptional (specially managed) commits to near-RT RIC for the rest of December.
- Arm port (do we need Jenkins CI jobs?)
- new merge requests
- RIC-835 - Viktor offered possibility of access to ARM hardware if needed (Subhash said restarting the componet helps)
- Preliminary planning for the F release
- likely not completed in E release (spill over into F): RIC-647, and all from this list.
- Candidate list for F release (priority column as per Thoralf's best understanding) https://jira.o-ran-sc.org/issues/?jql=(fixVersion%20in%20(ZZZ_future)%20or%20fixVersion%20in%20(F)%20)AND%20project%20%3D%20%22Near%20Realtime%20RAN%20Intelligent%20Controller%22%20%20ORDER%20BY%20component%20ASC
- we will discuss this again in two weeks from now.
- We did not discuss this today: Do we update to golang 1.16 (in go.mod) in all repos? Juha now updated golang version in Ubuntu base image along with Ubuntu image update to 20.04.
- A1-Med is using 1.16; others need to be checked
- RICAPP agenda: RICAPP Meetings.
Older meeting minutes
check from here: Project meetings (old)