You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 15 Next »

Amber release page for the O-RAN Software community          

Welcome to the Amber release page for the O-RAN Software community          

The press release is planned for Dec 3rd 2019. The code freeze is Nov 30th.

This page will contain all the information specific to the Amber release and frozen code and documentation. The main truck will continue on to support future releases.

This release is the first release and is in partnership with the O-RAN Alliance. The specification and software are being worked at the same time and the software is considered pre-specification software.

The projects have limited capabilities which will increase over future releases.

Initial release capabilities include:

  • Non-Real-time RIC (A1 Interface)
  • near real-time RIC (X2 Interface)
  • X-APPs
  • OAM (O-1 Interface)
  • Simulators
  • Dashboard (OAM)

Link to press Release (Pending)

Documentation

 https://docs.o-ran-sc.org/en/latest/

Table of Projects

Releasing Amber Tasks

Amber Release Timeline

Amber Timeline

Amber Release Software Package

We have packed all the software together to provide a simple step to download and install the Amber release. Here is a link to that package.
(TDB)

Near Real-Time RIC xApps (RICAPP)

Primary Goals: Support near-real-time radio resource management via development and deployment of a series of xApps that interact with one another and the external components via A1, O1, and E2 interfaces (O-CU/O-DU)

Planned xApps: (1) Admission Control; (2) Measurement Campaign; (3) UE Manager; (4) ML xApp; (5) KPI Monitor

Active participation from AT&T, Nokia, Samsung

PTL
Amber

14 Epics defined; 5 Completed; 8 in-progress; 0 Blocked; 1 Deferred to Rel B
5 xApps being worked for Amber:
Admission Control (AC)
Measurement Campaign
UE Manager
ML-based AC
KPI monitor
xApp interaction methods
Using RIC Message Router (RMR)
Using Shared Data Layer (SDL)
Planning for use of ML in xApps

Documentation and Project CoordinationWiki
Jira
Gerrit
Meetings
Project RelationsOAM
O-CU
O-DU

Near Real-Time RIC Platform (RICP)

Primary Goals: Support near-real-time radio resource management, managing O-CU’s and O-DU’s via E2 messages, receiving A1 intent and policy guidance messages from the non-RT RIC, O1 configuration requests, and emitting O1 measurement data to ONAP.
Platform Components: (1) xApp and Config Manager; (2) A1 xApp mediator; (3) Routing Manager; (4) Subscription Manager; (5) E2 Manager; (6) Redis RAN R-NIB; (7) Redis xApp DB2; (8) E2 Termination; (9) Resource Manager; (10) Logging and OpenTracing; (11) Prometheus; (12) VES Agent / VESPA; and (13) API Gateway

PTLThoralf Czichy  (Nokia)
Amber

36 Epics defined
Key Progress & Open Issues
E2: Implements WG3 General Aspects and Principles
Amber release with support E2 Insert Messages
A1: No alignment with WG as yet
O1: LCM via xApp manager providing REST APIs
RMR RIC-internal transport function
Integrated with Akraino REC Edge Stack

Documentation and Project CoordinationWiki
Jira
Gerrit
Meetings
Project RelationsOAM
O-CU
O-DU

Infrastructure

Target:  Provide the infrastructure to vO-CU and vO-DU, include the VM and Container solutions.  Enable the AAL (accelerator abstract layer) for the RAN application VNF/CNF.

Active participation from Windriver and Lenovo.

PTL
Xiaohua Zhang  (Windriver) 
Amber

4 Epics defined and in-progress; 1 Deferred to Rel B

  • [INF-A-F01] Akraino blueprint for RIC
  • [INF-A-F02] VNF/CNF Orchestration (Inspur)
  • [INF-A-F03] Acceleration Abstraction Layer (AAL)
  • [INF-A-F04] Real time platform to deploy the O-CU and O-DU
Documentation and Project CoordinationWiki
Jira
Gerrit
Meetings
Project RelationsOAM
O-CU
O-DU

Non Real Time RIC (NONRTRIC)

Primary Goal: Support non-real-time radio resource management, higher layer procedure optimization, policy optimization in RAN, and providing guidance, parameters, policies and AI/ML models to support the operation of near-RealTime RIC functions in the RAN to achieve higher-level non-real-time objectives.
Project Scopes: (1) A1 controller (mediator, Endopoint); (2) Coordinate/Host A1 Policy Management Services; (3) Coordinate AI/ML models – in RAN (E2 nodes and near-RT RIC) and non-RT RIC; (4) Data Enrichment coordinator; and (5) rApp Host and SMO Application Coordinator.

PTL

John Keeney (Ericsson)

Amber

9 Epics, 10 user stories and 3 tasks defined (all open)
None targeted for completion in Amber!
Working on several stretch goals:
Use SDNC as the base controller for NONRTRIC functions
Reuse Near-RT RIC dashboard to generate simple A1 messages
Leverage sample Near-RT RIC AdmissionControl xApp

Documentation and Project CoordinationWiki
JIRA
Gerrit
Meetings
Project RelationsOAM
O-CU
O-DU

O-RAN Distributed Unit High Home (O-DU High)

Primary Goals: The O-DU (High) project provides reference implementation according to the O-RAN WG8 documents. It provides the implementation of F1AP, RLC, MAC, Scheduler modules and API between them.
Scope: Develop software deliverable for the A-release as per SW requirements specifications, leveraging seed code of 5GNR RLC and MAC protocol functions and developing F1AP module, CU stub and L1 Stub.

PTL
Amber

6 Epics identified
5 in-progress
0 Blocked
1 Deferred to Rel B

O-DU-OAM-Agent – Work In Progress
Initial bring up of the system and layer configuration.
MAC-PHY (FAPI) Interface
Discussions with the O-DU Low team is in progress.
Test code development is WIP for initial PHY configuration message.
F1AP: Following messages between CU and DU are being developed.
F1 SETUP REQUEST
F1 SETUP RESPONSE
GNB-DU CONFIGURATION UPDATE
GNB-DU CONFIGURATION UPDATE ACKNOWLEDGE

Documentation and Project CoordinationWiki
Jira
Gerrit
Meetings (common meeting with O-CU, O-DU High, O-DU Low and Sim)
ASN 1 tool
Project RelationsNear-RT RIC Platform
Non-RT RIC
OAM
O-CU-CP
O-CU-UP
O-DU Low

O-DU (ODU-LOW)

Primary Goals: The O-RAN-SC-ODU LOW project provides reference implementation of ODU-LOW according to the O-RAN AAL specification (WG8) documents. The reference design will follow the open interface toward ODU HIGH, RRU and Accelerator, provide physical layer signal processing functionality according to 3GPP .

Scope: According to the ORAN-WG8.AAD specification, PHY layer functionality is realized as High-PHY in O-DU and Low-PHY in O-RU. Some of the PHY functionalities may be realized using hardware acceleration. O-DU Low project will focus on the High-PHY and fronthaul library modules that reside in O-DU. NR FAPI being standardized by Small Cells Forum (SCF) will be used for defining L1 and L2 interactions.

PTL

Zhimin Yuan (Intel)

Amber

4 Epics(2 Done, 2 To Do), 3 tasks (1 Done, 2 In Progress), 1 defer to release B

Documentation and Project Coordination

Wiki
Jira
Gerrit
Meetings (TBD)

Project Relations

ODU High
OCU
SIMULATION



PTL


Amber


Documentation and Project Coordination
Project Relations


PTL


Amber


Documentation and Project Coordination
Project Relations


PTL


Amber


Documentation and Project Coordination
Project Relations
  • No labels